PA 220148 CrossCottBoxted7 01
Redevelopment of site to create 7 no. new residential units
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Redevelopment of site to create 7 no. new residential units
Created by Steven Moseley // 1 thread
220154: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220153: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220155: Redevelopment of site to involve the demolition of the existing garages and provision of 2 no. one bedroom units
220149: Redevelopment of site to involve the demolition of the existing garages on site, and provision of 3 no. new dwellings
220147: Demolition of existing garages and redevelopment of site to provide 6 x 2 bedroom flats
Created by Steven Moseley // 1 thread
The application proposes: 1. Change of use of the property from C3 to Sui Generis 2. Creation of a High Standards House in Multiple Occupation for 8no. Occupants consisting in 8no. bedrooms, 8no. en- suites, 1no. shared toilet and one communal area 3. G
Created by Rosamund Humphrey (Admin Officer) // 5 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
Rods at this cattle grid have either sheared off or been vandalised (not that recently). It already appears on the county fault report site ref 372428, from June 2021, but nothing appears to have been done about it.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Outline planning permission for the demolition of existing buildings and
provision of up to 16 dwellings up to 120sq.m of office accommodation
access public open space and landscaping (including details of access and
with all other matters reserved)
Reference: S/4057/19/OL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing building and erection of building with two Class E units at ground floor level and 9 flats above.
56 - 60 Hills Road Cambridge Cambridgeshire CB2 1LA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a 1bed dwelling.
42 Birdwood Road Cambridge CB1 3SU
Cambridge
Application reference : 22/00231/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from vacant retail to 7 No. apartments (Use Class C3)
212 - 214 Newmarket Road Cambridge Cambridgeshire CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
First floor and single storey rear extensions of existing bungalow to create 3no. flats.
538 Newmarket Road Cambridge CB5 8LL
Cambridge
Application reference : 22/00219/FUL
Created by Will Bramhill // 1 thread
This is our response to a planning application for a new secondary school. It may help others up against a similar scheme. https://docs.google.com/document/d/1xSVC4pzeBz1uW3ujT9VtKSKjFyp1rk668E4dd4prPtk/edit?usp=sharing
Proposed installation of parking places for electric vehicles in the De Freville Avenue and Riverside areas, Cambridge. Closing date for comment is 31 January 2022.
One diagram at least shows incursion into the pavement.
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial changes at Oakley Square (north) at the junction with Crowndale Road put in under an ETO in December 2020. (No Entry for motor vehicles from Crowndale Road into Oakley Square – north).
Camden also proposes for the Crowndale Road junction:
- The planters and droppable bollard to be replaced with a new ‘continuous footway’ with a widening of the pavement along Crowndale Road
- The cycle entry gap is to be re-aligned to accommodate the pavement
- A new tree and bench are to be installed alongside the continuous footway
A new bike hangar is to replace a residents’ parking bay outside 50 Oakley Square (north).
Camden also proposes for the junction with Eversholt Street.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05431/FUL | First floor side and single storey rear extensions to create two self-contained flats. |
17 Greenlands Cambridge CB2 0QY
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05578/FUL | Change of use to large 7bed HMO (7 persons) sui generis. Rebuild and extend existing garage to bedroom 7 including changing to pitch roof. First floor rear extension (bedroom 6, previously approved under 20/01261/FUL). |
45 Leete Road Cambridge CB1 9HB
Created by Steven Moseley // 1 thread
Outline application for the erection of five dwellings
Created by Steven Moseley // 1 thread
Outline planning application for: up to 50 dwellings; a new vehicle drop-off/pick up point; and access from Peldon Road. All Matters Reserved, except access
Created by Will Bramhill // 0 threads
See planning application comment at link below. NB this is a good blueprint for any cycle groups looking to comment on new schools. https://www.ensembling.com/273042
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05549/FUL | Retention of building frontage facade and introduction of a mixed use development comprising basement and ground floor public house and an office/business Use (Class E(g)) to the rear and on the upper floors along with access, cycle parking and associated infrastructure following demolition of existing buildings.
The Emperor 21 Hills Road Cambridge CB2 1NW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05362/FUL | Single storey front and side extension and first floor extension to create a 1no 1bed flat above existing detached building at the rear of 6 Kings Hedges Road.
6E Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for Hybrid Planning Application comprising Full Planning Permission for c47,280sqm (GEA) of Class E floorspace comprising an office building (One Milton Avenue) and two lab buildings together with ground floor amenity uses, a Mobility Hub comprising of c1031 car parking spaces including c3,742sqm of Class E floorspace at ground floor level, a temporary car park of c379 spaces, a wildlife habitat area, Network Rail compound area, enabling works and associated infrastructure; and Outline Planning Permission for c41,940 sqm (GEA) of Class E floorspace comprising one lab building and one office building, together with ground floor amenity uses, enabling works and associated infrastructure.
Cambridge North Commercial Quarter
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05042/FUL | Elevational changes to accommodate 7 No. dwellings. | 212-214 Newmarket Road Cambridge CB5 8JL
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Reserved Matters application for third housing phase (known as BDW3) including 210 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 17, 18, 22, 25, 26, 28, 35, 40, 49, 58, 62, 66, and 69 pursuant to outline approval 07/0003/OUT | Darwin Green One BDW3 Development Site Huntingdon Road Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Darwin Green One BDW4
Development Site
Huntingdon Road
Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/05423/FUL
Erection of a new dwelling
Land At Rear Of 1 Priory Street, Cambridge, Cambridgeshire, CB4 3QH
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.