21/02836/FUL Single storey extension to 1 bed flat with cycle shelter.
The cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
The cycle parking.
Reserved Matters approval for appearance, landscaping, layout and scale for 373 dwellings, access roads, cycle and pedestrian routes, cycle and car parking, landscaping, utilities and associated ancillary structures at Lots S1 and S2, North West Cambridge Development following outline planning permission S/1886/11 as varied by planning permission S/2036/13/VC
Lots S1 And S2, North West Cambridge Development Eddington Avenue Cambridge CB3 0LH
South Cambridgeshire
Application reference : 21/04036/REM
Erection of 280 dwellings, including 72 affordable dwellings, two new vehicular accesses from Babraham Road, pedestrian and cycle access, publicly accessible open space, a Local Area of Play (LAP) and a Local Equipped Area of Play (LEAP), landscaping and earthworks and surface water drainage, associated amenity space and attenuation features and internal infrastructure.
Land South Of Babraham Road Sawston Cambridge South Cambridgeshire
South Cambridgeshire
Application reference : 21/03955/FUL
Created by Steven Moseley // 1 thread
Proposed commercial office block (resubmission of application 211722
Created by Steven Moseley // 1 thread
Demolition of existing detached house and erection of 2 No. detached dwellings.
Created by Steven Moseley // 1 thread
Proposed two bedroom bungalow and vehicle access to rear of 168 St Andrews Avenue
Created by Steven Moseley // 1 thread
202349 Application to determine if prior approval is needed for proposed New dwelling dwellinghouses on detached block of flats.
202161 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
202321 Application to determine if prior approval is required for two new additional floors of residential floor space to create 8no. 2 bedroom flats.
202001 Prior approval application for erection of two additional floors of residential floorspace to create 8 no. 2 bedroom flats.
Created by Steven Moseley // 1 thread
Residential use of former car park to international house following change of use from B1a (offices) to C3 (dwellings) of international house (resubmission of planning permission 170259)
Created by Steven Moseley // 1 thread
Change of use of existing dwellinghouse to 6 flats and erection of replacement building at rear to provide 4 flats. Resubmission and variation of planning approved under reference 180116
Created by Steven Moseley // 1 thread
Converting a vacant office unit into a Job Centre Plus office for the DWP. This facility will provide 29 work coach stations to attend customers by appointment only. It will have an interview room for customers and staff welfare areas. Ten of the existi
Created by Steven Moseley // 1 thread
Erection of 2No. semi-detached 2 bedroom houses.
Sam // 1 thread
Before the pandemic you could turn right here, now, any cyclist ends up on car-repelling paint with nowhere obvious to go.
sound+fury // 1 thread
Construction of a new three storey educational building, including associated hard and soft landscaping
Hills Road Sixth Form College Hills Road Cambridge CB2 8PE
Cambridge
Application reference : 21/03780/FUL
Created by Steven Moseley // 1 thread
Proposed re-development to the rear of Willows Shopping parade, to deliver a new residential development of 6No dwellings consisting of 3No three bedroom dwellings and 3No four bedroom dwellings.
Created by Steven Moseley // 1 thread
Proposed extensions and alterations to existing hotel to accommodate an additional 20 rooms/suites, additional meeting rooms and improved leisure facilities. Proposed external refurbishments and internal alterations.
Created by Steven Moseley // 1 thread
House conversion to 2 x 2 bed flats, and 1 x 2 bed maisonette. Single storey extension to ground floor flat and balcony to the first floor flat. Along with the current approved 150493 and 150492 parking arrangements 3 additional parking spaces are provid
Created by Steven Moseley // 1 thread
Change of Use of the first floor from ancillary office of a light industrial unit to Residential to provide 1 no. 3 bedroom apartment
Created by Colin Wing // 1 thread
Westminster City Council and the London Borough of Camden are working together to deliver a Neighbourhood Traffic Management (NTM) scheme in Covent Garden including the Seven Dials area.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
St Neots is receiving some funding as part of the Future High Streets Fund - this could include investment in cycling and walking infrastructure.
Created by Steven Moseley // 1 thread
Retail park comprising retail (A1) and restaurant (A1/A3/A5) units with associated parking and landscaping. Resubmission of 172935 - REVISIONS RECEIVED
Created by Will Bramhill // 1 thread
Plan 211788
Industrial estate, London Road, Marks Tey
(was 202373)
Introduction
Colchester Cycling Campaign objects to this plan. If it is considered for approval, mitigation should be carried out and completed at the same time as the development. If any work is outstanding it should be subject to a legal agreement and funded via a 20-year Section 106 or CIL agreement. See table below for a list of mitigation measures.
Highways England should consider this scheme not as a standalone but as a major part of other recent planning applications in this area, which all add to motor traffic. This particular application is disappointing in terms of provision for active travel: it is likely to increase dependence on short to medium-distance commuting by car while further undermining cycling through increased traffic and greater danger, especially in Old London Road.
Note that paragraph 109 of the National Planning Policy Framework states that “development should only be prevented or refused ... if there would be an unacceptable impact on highway safety, or residual cumulative impacts on the road network would be severe”.
We trust that the Highways England stage one road safety audit (CBC site August 6) will include consideration of walking and cycling routes in the area. The auditor should ride the routes, as recommended by LTN 1/20 and Gear Change.
Two major plans have recently been rejected owing to poor cycling and walking provision: the Devonshire Quarter in Cambridge and Lidl in Salford (download of decision notice).
Although the applicant’s draft travel plan and transport assessment has sections on walking and cycling, nothing is provided in terms of improved off-site infrastructure – at least not until 2028, by which time the new section of the A12 may be complete. It is unclear whether the developer would be prepared to fully fund improvements at that stage.
2 Current situation
The Kelvedon to Colchester cycleway runs past the development site along Old London Road. This is used by longer-distance cycle traffic as well as cycle commuters to and from nearby industry and adjacent homes. Current use is low, in part because of poor connections.
This route links to the part of Marks Tey west of the A120 via Dobbies Lane via a relatively new cycleable bridge across the railway track. However cycle accesses to homes north of Jays Lane/Long Green/Wilsons Lane to Keable Road, Cornwallis Drive and Steele Close are convoluted, narrow and restricted.
3 The applicants’ transport assessment and travel plan
The applicants’ transport assessment and travel plan is lazy in terms of cycling. It appears to be a desk-based study and states merely that cycling is possible from certain hamlets and villages. No consideration is given to current barriers such as the A12 or the perceived safety of the roads and lanes that have to be used to reach the site, both of which would make a cycle journey dangerous or undesirable. There is no indication that the company involved has ridden any of these routes to assess their suitability.
No consideration is given to “on the ground” ease of access, even within Marks Tey.
The consultant quotes objectives of a travel plan but this scheme ignores objective two (address the access needs of staff by supporting walking, cycling and the use of public transport) and objective 3 (encourage good urban design principles that open up the site to walking, cycling and use of public transport). If this is the case at this stage, what commitment will be invested in the future?
The papers state that cycle access is possible via the grounds of Marks Tey Parish Hall. This appears to be privately owned land (possibly by the parish council). The paths within the site are not wide enough for cycling even if it was permitted. The access to the site from the A120 (picture below) would be a challenge for Bethany Shriever, Team GB’s BMX Olympic gold medallist.
The applicant gives a concession to cycling with a “green line on a map” in its transport assessment. There is no indication of land ownership, when or whether this can be achieved. Notably this access is not marked on any of the detailed plans for the site itself.
In conjunction with Highways England, the developer has looked at improvements to the junction of Old London Road with the A120. All of these except for a ban on right hand turns on the A120 have been put in abeyance pending construction of the new A12.
The applicant also talks of a 5km cycle catchment. This is out of date. Experience from cycle-friendly towns and cities shows that the advent of ebikes increases not just distances cycled but frequency too.
No estimate is given of the effect of increased motor traffic on cyclists in Old London Road, with the focus being on the ability of two heavy goods vehicles to pass each other.
While Old London Road falls within the remit of Highway England, it is not by nature a trunk road but a lightly trafficked mixed-use street. It should be subject to the designs set out in Manual for Streets (MfS) and not the Design Manual for Roads and Bridges. Page 144 of MfS states: "The DMRB is not an appropriate design standard for most streets, particularly those in lightly-trafficked residential and mixed-use areas.”
The applicant’s documents also make no mention of Local Transport Note 1/20 on cycling infrastructure or the government’s Gear Change document, which have been published for more than a year. These should have been used to shape the application.
Paragraph 3.4.5 of the transport assessment mentions the National Cycle Network routes 1 and 13. These are irrelevant when the site is so cut off for cyclists and is likely to be so for some time.
There is no indication of the type of cycle parking that the developer intends to provide, whether security is sufficient and whether it is covered. The applicant seems to have ignored the requirement at 3.6.2 of the Essex Parking Guide that “cycle parking should be conveniently located adjacent to entrances to buildings”.
No comprehensive consideration of current or future air quality has been made.
4 What we would like to see
Request |
Comments |
1 Funding and provision of a S segregated cycleway from Marks Tey station to join with Old London Road 90m west of the A120 junction |
Station Road may need widening. Possible land ownership issues, although the wooded area south of the station,and between Old London Road and the A12 south of the A120 (the teardrop), may belong to Highways England. The cycleway should cross the teardrop to join Old London Road 90m south of the A120 junction. Street lighting needed |
2 Existing crossing moved 30 metres east, closer to junction with roundabout |
This will allow use of existing verges to give better access, ie, no use of footway by cycles |
3 Remodelling of plans for phase 1 and phase 2 so that a segregated cycleway/footway is provided along the northern edge of the site between Dobbies Lane and the A120, crossing Old London Road to meet with the cycleway from the station. The first section of the path should have full access into the site with its design influenced by Manual for Streets |
See illustration. Land ownership issues, although parish council may be amenable? Street lighting needed. If this cannot be achieved then Old London Road will have to be looked at as the main access route. The level of traffic proposed on Old London Road would mean that a segregated cycleway would have to be provided. |
4 An alternative to 3: redesign of Old London Road to be friendlier to cyclists using Manual for Streets. |
As noted at 3 |
5 Funding for improvements for cycle/foot access into the Keable Road estate at Keable Road, Cornwallis Drive and Steele Close |
Relatively easy. These accesses should meet LTN 1/20 |
6 Developer to work with Highways England on tying in development to old A12 once the new road opens, subject |
Dependent on detailed drawings from Highways England |
7 Agreement to help fund medium to long-term maintenance of Dobbies Lane |
|
8 Details of cycle parking (type and position) to be approved by CBC before construction begins |
Created by Jean Dollimore // 1 thread
Camden proposes to make permanent the trial closures that were installed in Prowse Place and Wilmot Place in June 2020.
The Prowse Place closure was originally by means of bollards but has been replaced by ANPR and signage while the Wilmot Place closure is by means of bollards.
Camden also proposes to:
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Barton and District Bridleways group are campaigning to get a popular route for cycling, walking and horseriding recognised as an official Right Of Way.
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for proposed change of use of offices (Class B1) to 3 residential apartments (ClassC3)
Created by Steven Moseley // 1 thread
Proposed annex. Renewal of approved application 181350.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream