Beehive Centre redevelopment
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Anon // 1 thread
In June 2022 the owners of the Beehive Centre are holding a consultation on the "redevelopment of the Beehive Centre and the land surrounding the site"
Created by Josh Grantham // 1 thread
Demolition of nursery building, part of outbuildings; partial demolition, refurbishment and extension of other existing college buildings and the erection of four accommodation blocks containing 60 rooms for postgraduate students; associated landscaping, car and cycle parking, refuse and other storage and new electricity substation within outbuildings. | Owlstone Croft Owlstone Road Cambridge Cambridgeshire CB3 9JJ
Created by Josh Grantham // 1 thread
Infill of existing carport area and garage conversion to create home office/guest accomodation. | 51A Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Created by Josh Grantham // 2 threads
Residential development containing seven dwellings along with access, car parking, landscaping and associated infrastructure
Created by Josh Grantham // 1 thread
Erection of 3 dwellings following the partial demolition of the existing outbuildings. | 70 Water Street Cambridge Cambridgeshire CB4 1PA
Created by Alice Woods // 0 threads
Following forest trails north from Glentrool leads to a gate with a wayfinder with an arrow pointing directly ahead. The gate ahead is locked shut with a bike lock. Two more gates were locked in this way in the next 400m along the trail, blocking access to the no.7 cycle route from this end of the forest.
Created by Josh Grantham // 1 thread
Erection of 6no (1 and 2bed) dwellings with associated infrastructure following demolition of existing dwelling. | 72 High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ
Created by Josh Grantham // 1 thread
Change of use from Guest House to large 12bed House in Multiple Occupation (Sui Generis Use Class)
Created by Josh Grantham // 1 thread
Erection of office building and associated infrastructure and works following demolition of existing buildings and structures
Created by Josh Grantham // 1 thread
22/01995/FUL | Demolition of existing buildings and hardstanding and erection of 70 new homes, car parking, landscaping, bin and bike stores, substation and associated works.
cycle parking provision grouped to 3 areas quite close to the doors. Cycle parking provision needs checking.
Also the site provides several cut throughs, they should be improved and enhanced. Probably worth a deeper look.
Created by Josh Grantham // 1 thread
Application for new property. The design and access state claims compliance with Policy 82 parking standards but no cycle parking has been indicated on the plans.
Created by Josh Grantham // 0 threads
Creation of new property in which the Design and Access statement claims compliance with policy 82. However no cycle parking in indicated on the plan.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Strategy and Resources Committee consists of six councillors who scrutinise the decisions of the Leader/Executive Councillor for Strategy and External Partnerships and the Executive Councillor Finance and Resources.
More Information
Created by Rosamund Humphrey (Admin Officer) // 1 thread
All 42 members of the city council meet formally at least five times a year. Their main responsibilities are setting the budget and policy framework for decision making.
More Information
Created by Matthew // 1 thread
Scout Hut Path is an important link between the Carter Bridge and the Corrie Road neighbourhood. It is narrow and marred by a sharp blind bend in the middle, making it difficult to use for many people especially at night due to personal security and collision concerns.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
A developer called Kadans Science Partner is proposing to redevelop the Merlin Place site (currently home to the Taylor Vinters building) as part of the North East Cambridge scheme.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
Camcycle's time and energy is consistently taken up removing exclusionary barriers (e.g. Biomedical Campus, A14 active travel bridges, Warren Road). We need to consider long-term ways to prevent new barriers going in and remove existing ones which prevent people of all ages and abilities cycling.
Created by S Fan // 1 thread
Dropped kerb required due to high pavement
sound+fury // 1 thread
There have been issues with the cycle parking in the past so this need examining again.
Created by Tim Ward // 1 thread
I'm new here, so this has probably been done before, but I haven't sussed out how to find any relevant previous discussion using the search. So sorry if this is repetition.
There are lots of farm roads around Cambridge, some of which have locked gates and "bicycles by written permission only" notices, others are signed as permissive routes, others have no signs but in practice nobody actually shouts at you as you cycle through what turns out to be a farmyard.
Are there any resources that enable us to work out in advance, before discovering the sign and the locked gate, which of these roads are passable by bike, with possibly a rather long route home if the answer is "no"?
Just as an example, how about Battle Gate Road?
Created by Al Storer // 1 thread
A series of temporary obstructions are planned for the Haling Way path
Created by piers // 1 thread
Cars regularly cut across cyclists in the southbound bus/cycle lane.
Created by Matthew // 1 thread
From the county:
In addition to the notification which I sent to you on Monday 11 April 2022 regarding the order to divert part of Longstanton Bridleway 10, I am emailing you to consult you on a proposal to re-surface the northern part of Longstanton Bridleway 10 between the new bridge across the access road to Northstowe and the southern end of the Wilsons Road by Falcon Park.
The proposal to re-surface the northern part of Longstanton Bridleway 10 is related to Condition 59 of Northstowe Phase 2 (S/2011/14/OL) which is subject to submission of details to Greater Cambridge Shared Planning consultation S/2011/14/COND59. In order to achieve a continuous all-weather NMU link between Longstanton, Bar Hill and the new A14 NMU path I am consulting you on what type of surfacing you would like to see on the route (coloured in pink on the attached plan). The route will need to provide an upgraded route that caters for all non-motorised users (walkers, cyclists and horse-riders) all year round.
The southern section of Longstanton Bridleway 10 between the A1307 and the new NMU bridge over the Northstowe access road was surfaced last year and I am interested in whether a similar type of surface would be suitable on the northern section of the bridleway. The northern section of Longstanton Bridleway 10 is generally quite wide and located between tree/hedge lines. I am proposing that any re-surfacing on the northern part of the bridleway follows the principle of providing a 50-50 parallel surface (50% retaining grass/natural surface next to 50% smooth surface suitable for cyclists and pedestrians such as the surface which is in place on the southern part of Longstanton Bridleway 10 or the surface which has just been completed on Reynolds Drove, Rampton north of the busway). Between the boundary features on the northern part of Longstanton Bridleway 10 there is generally at least 5 metres of width available which in theory could accommodate 2.5 metres of natural surface next to 2.5 metres of foot/cycling surface.
The re-surfacing of the bridleway associated with the planning condition is for the developer (Homes England) to deliver, but I am seeking your opinions on what you would like to see in this location which I will then use to inform my feedback to Homes England and Greater Cambridge Planning on the condition which needs to deliver improvements to the northern part of Longstanton Bridleway 10.
I would be much obliged if I could have your comments back on this matter by Friday 29 April 2022.
Created by Stuart Johnson // 1 thread
Military Road, 48 apartments - general comment submitted
Created by Sarah Hughes // 1 thread
I'm writing an article for the next Camcycle magazine on family cycling options with pedalling kids (so FollowMe, Tagalong and tandems/triplets). Could anyone share their experiences of using these?
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.