Lack of cycle parking on Mill Road
Mill Road suffers from a dreadful lack of cycle parking.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 2 threads
Mill Road suffers from a dreadful lack of cycle parking.
Coming from Oxford Street, trying to get to the coach stops is quite difficult.
Created by Jim Chisholm // 2 threads
For several years there have been proposals, counter proposals, and problems over access over partly Trinity College land that should give good cycle commuting routes from Bar Hill, Dry Drayton, Madingley and even Hardwick.
We need to work with NW Cambridge team at the University, Trinity College, Bidwells (Trinity's land agents), County, SCambs, and Local Parish Councils
If a solution can be found S106 monyey is available
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Martin Lucas-Smith // 1 thread
The speed limit here is currently 40mph.
Martin Lucas-Smith // 1 thread
The North West Cambridge site proposes traffic calming changes in Oxford Road and Windsor Road.
Proposals at:
http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=LRVINSDX01D00
then click on this second link:
http://idox.cambridge.gov.uk/online-applications/files/31B8D2EEB48A4F65255321E5DF860E38/pdf/11_1114_OUT-TRANSPORT_ASSESSMENT-857517.pdf
and scroll to numbered PDF page 26.
Created by Gregory Williams // 1 thread
A new Sainsburys supermarket is proposed at Westgate-on-Sea. The cycle infrastructure in this location is poor and this is an opportunity to help improve it.
Created by Shaun McDonald // 0 threads
Part of the TfL junction review http://tfl.gov.uk/junctionreview
11/0008/FUL was recently rejected by the Planning Committee but the club only have the lease till the end of the 2013 season having sold it to developers. It's likely some kind of development will occur on this site since the club needs the money.
The Old Press/Mill Lane supplementary development plan was adopted in 2010. Things have been quiet since then but the University still have plans to refresh this area. Part of the plan involves making Granta Place shared use.
Martin Lucas-Smith // 12 threads
Various related matters regarding the new CB1 development, e.g. new housing blocks and their cycle parking, routes through the development.
For issues relating to cycle parking at the station itself, see:
http://www.cyclescape.org/issues/36-cycle-parking-at-the-station
instead
Created by cobweb // 1 thread
Coming up in the Planning Committee meeting for April 4th, 9.30am.
Created by cobweb // 3 threads
Outline planning permission was given in 2008 for this development of up to 347 houses. In 2011 a reserved matter relating to the design on the junction was refused by the Joint Development Control forum. This is still a subject of debate. Another concern is the path adjacent to Babraham Road which is much used by staff at Addenbrooke's either on foot on by bike.
Martin Lucas-Smith // 21 threads
The Cambridge City, South Cambridgeshire, County Council Strategic Transport and Spatial Planning Group are considering a new Transport Strategy for Cambridge (TSC).
Other transport strategies will no doubt emerge in future.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by cobweb // 7 threads
A development of 1,780 houses, including community facilities, roads, footpaths and cycleways. Frontage land has already been built on (this is the land facing Huntingdon Road) and outline planning permission given.
Created by cobweb // 4 threads
A development of 1,200 homes and a country park to the south of Cambridge.
Created by Klaas Brümann // 1 thread
Cllr Sabastian Kindersley (LD, Gamlingay) writes in a letter in todas Cambridge News that "the university plans to rebuild the road bridge linking Haslingfield and Barton. ... chance to provide a safe combined pedestiran/cycle path down on to the track so residents can avoid the narrow and dangerous road and so access the A603 safely. The approx cost of this work is £40,000.
What do we know about this?
Martin Lucas-Smith // 6 threads
South Cambridgeshire District Council are reviewing their Local Plan. It is important that cycling issues are dealt with and brought to their attention during this process.
Martin Lucas-Smith // 9 threads
The Great Kneighton (Clay Farm) development will have effects on cycling. A series of planning applications have been passed and more will come.
Anon // 0 threads
Department for Transport press release 23 March 2012:
http://assets.dft.gov.uk/press-releases/20120323a/east-england-fact-sheet.pdf
Cambridgeshire "Better Bus Area Fund"
Cambridgeshire will receive £1,724.000 to improve accessibility, bus journey times on key bus routes in Cambridgeshire. The changes will include new traffic management on four corridors into the city, bus priority, upgraded buses, improved interchanges (including with Guided Busway), smart ticketing top-up on street and real time passenger information. For further information, go to http://www.cambridgeshire.gov.uk/NR/rdonlyres/1BA212D3-E038-47C5-9E0A-50E2BDBE3AB7/0/CambridgeshireBBAFproposalFINAL.pdf.
The proposals include much of relevance for cyclists, including bus priority at junctions, a "bus gate" through the middle of Mitcham's Corner and more.
Created by Simon Nuttall // 1 thread
A campaign member and resident of the area has sent this:
I've just received a consultation paper from the City Council for residents of Stanley Road, Garlic Row and Oyster Row. I've summarised the proposals below.Scheme 2 Option B seemed the most significant.
Scheme 1. Extension of parking and loading restrictions on Stanley Road
Scheme 2, Option A. "No entry except cycles" on Garlic Row adjacent to the junction with Mercers Row
Scheme 2, Option B. Oyster Row becomes one-way in the northeasterly direction. No exemption for cycles.
Comments to Gavin Card at the City Council by the 30th March (gavin.card@cambridge.gov.uk or PO Box 700, CB1 0JH)
Created by Rohan Wilson // 0 threads
The Grove Pub. Transport Statement recognises that 19 cy spaces should be provided (1 per 15sqm public space), states they are in "garage" but details not given, just assumed space available. Needs closer look. TRICS database for a Leeds Sikh Temple shows no cycling, 16.4% walking, 3.6% public tpt.
Created by George Coulouris // 0 threads
The Foot tunnel should be more accessible
Martin Lucas-Smith // 0 threads
Blackfriar's Bridge is a major collision blackspot that actively discourages people from cycling.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.