Vision Zero Partnership
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 0 threads
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
(Moved related thread created 2 months ago.)
Surfacing includes gravel and grit.
Cycle chicanes shown on diagrams.
Created by Roxanne (CEO) // 1 thread
Further expansion of the Biomedical Campus
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of four dwellings, including a dropped kerb and associated infrastructure following the demolition of the existing buildings on site. | 8 Kings Hedges Road Cambridge CB4 2PA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Retrospective change of use from Hotel (C1 Use) to House In Multiple Occupation (HMO) (sui-generis) | Oakley Lodge 627 - 631 Newmarket Road Cambridge Cambridgeshire CB5 8PA
Created by Roxanne (CEO) // 1 thread
The Carter Bridge is looking worse for wear in many ways.
We've had a question about who is responsible for maintenance. Network Rail and Cambridge County Council, Cambridge City Council have apparently denied responsibility and there has been a suggestion that Essex County Council may be responsible.
What do we know about responsibility and previous actions to keep the bridge maintained?
Created by Will Bramhill // 1 thread
1960s roadbuilding seared through the town. Modern road planners have already provided a good toucan crossing between Wellesley Road and Crouch Street West across Southway/Lexden Road. Providing a better ramp from Wellesley Road would help facilitate this.
Essex Housing is redeveloping the Essex County Hospital site as housing. The company has agreed various cycling measures as part of this scheme. It has allocated £25,000 towards remodelling the Wellesley Road/Creffield Road/Maldon Road junction. Gwyn Owen, head of Essex Housing, has agreed that any money left over can be put towards a new, wider ramp. There may also be funds from the Local Highways Panel.
Created by Steven Moseley // 5 threads
Of and relating to Essex County Council.
Created by Steven Moseley // 1 thread
The response to, and effects of the coronavirus pandemic
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.
Created by Steven Moseley // 7 threads
Policy Documents, guidance, consultations etc. from UK Government.
sound+fury // 1 thread
From the previous thread:
Key information:
The establishment of the new JDCC, composed of members from both South Cambridgeshire District Council and Cambridge City Council have now been completed and the previous JDCC has been dissolved...
'In terms of the remit of the new Committee, some cross boundary sites have been included that were not within the remit of the previous Committee ... both Councils have adopted Local Plans which include specific policy designations – some of which overlap the Administrative boundary of the two Councils. Whilst both Councils have created a shared planning service, this does not change the statutory position of the two Councils as distinct “local Planning Authorities” ... The additional sites include the North East Cambridge Area Action Plan areas within both City and SCDC, Cambridge Biomedical Campus/Addenbrookes site and the extension of Peterhouse Science Park/ARM on Fulbourn Road.'
Created by Rosamund Humphrey (Admin Officer) // 2 threads
Site: The Meadows Community Centre, Arbury
Proposal:
Erection of new community hub and 22 council rented affordable dwellings, car parking, replacement multi use games area, new vehicular access off Arbury Road and enhancements to the recreation ground and installation of substation (as part of wider proposal for the full Meadows site seeking permission for the demolition of existing community centre and the erection of a new community hub, 78 affordable dwellings, car parking, a replacement multi use games area, new play equipment, the creation of new vehicular accesses on to Arbury Road, Daisy Close and St Catharines Road, the provision of new landscaping and substation and the installation of drainage to the football pitch and associated land levelling together with land reprofiling).
https://consultcambs.uk.engagementhq.com/lancaster-way-consultation
Capacity improvements are currently underway to the A10/BP roundabout, required as part of the approved Lancaster Way Business Park expansion planning application.
This is a vital development to support economic growth within East Cambridgeshire and expected to generate 2,500+ jobs, 75% will be from the local area. Cambridgeshire County Council agreed to carry out a feasibility study encompassing the A10, BP and Lancaster Way roundabouts to assess the current congestion issues limiting future growth which was completed in October 2018.
This study identified that capacity improvements at the Lancaster Way roundabout would also unlock further benefits of the measures now being constructed at the BP roundabout. The County Council has started to look at what improvements could be made to the Lancaster Way roundabout and the Cambridgeshire and Peterborough Combined Authority and East Cambridgeshire District Council have agreed to provide funding.
The public have the chance to offer comments for consideration on the proposed design.
This consultation is to share the details with residents and receive feedback. We may share your information with our partners in this consultation (East Cambridgeshire District Council and Cambridgeshire and Peterborough Combined Authority) and with the council analysis team.
You do not have to give us any personal information. We will not publish any personal details you do give us, but may publish our response, and include it in public reports, with personal details removed. Personal data will be held securely, in accordance with data protection legislation. We will only store it for 12 months after the consultation results have been analysed and the consultation report published.
Please view the consultation information prior to completing this survey, online at https://www.cambridgeshire.gov.uk/residents/travel-roads-and-parking/transport-projects/a10-a142-lancaster-way-roundabout(External link)
All surveys should be completed by the closing date of Friday 18 September 2020.
Your views on the project are welcomed.
It's the usual motorist-centric tripe of course, with ridiculous excuses for not building a signalised crossing ("it's rural" - nevermind that Babraham is also rural and they are doing it there).
Following Dft Phase 1 funding arising from the current Covid19 situation, designs are available for cycle lanes covering the approximate 3.2km length from the Haringey boundary to just south of North Finchley.
The design principle has been, where possible, to provide a temporary lightly segregated cycle lane, defined by wands, bolted into the carriageway surface at 4m spacings. In some cases, we have taken a cycle lane width of 2.5m. In other locations, where space permits, we have re-allocated the whole of a current running lane.
At other locations, we have needed to retain a ‘with traffic’ cycle route. In order to mitigate this, these sections of the route will be provided with carriageway cycle markings and signage as is usual, but complemented with the introduction of 20mph limits.
Monitoring of the route will take place (and indeed has already started) to assess cycle and motorised traffic volumes, as well as to assess any changes to the temporary layout that may be necessary.
In developing the design we have engaged with TfL’s cycling sponsors and have incorporated, where applicable, comments and suggestions from their design audit teams and our safety advisors. We have also obtained support from the police in respect of the 20mph limits.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Safety concerns have been raised around Coldham's Lane - specifically, the stretch running from Coldham's Lane roundabout to the Toyota garage.
These concerns ought to help inform proposals for the CL roundabout and the Marshalls land on Coldham's Lane.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
We're working towards a glossary of key terms to help members and the public.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02871/FUL | Erection of 1no. dwelling adjacent to No.30 Caravere Close - Resubmission of 19/0774/FUL | 30 Caravere Close Cambridge CB4 2UG.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02869/FUL | Conversion of single dwelling into two separate dwellings complete with additional rear extensions and loft conversion to main dwelling | 1 Silverwood Close Cambridge CB1 3HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/02821/FUL: Change of use from HMO (use class C4) to large HMO (8 person) (sui generis)
4 Moss Bank Cambridge CB4 1UR
Created by Steven Moseley // 1 thread
Thanks to planning hiccups in the 90s and 00s, there is a missing section of the path between Rouse Way and Meander Mews that prevents it from being used as an alternative for walkers and cyclists to Cowdray Avenue, or as part of leisure routes, e.g. a riverside loop.
Photograph: John Collett, Colchester Civic Society
This is a consultation about Abbeygate House
Created by Rosamund Humphrey (Admin Officer) // 1 thread
19/0261/NMA1 | Non-material amendment with respect to planning permission reference 19/0261/FUL (Erection of 3 no. retail units (2 x use class A1 and 1 x use class A5), 1no. Community Centre (use class D1) and provision of 14 no. dwellings (8 flats and 6 maisonettes) following demolition of existing commercial units and flats).) The amendments sought are the introduction of additional doors to the northern elevation of Block B, and the provision of a new external cycle store to Block B. | 74-82 Akeman Street Cambridge Cambridgeshire CB4 3HG
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by kirbyjames // 2 threads
The primary route between Crediton and Exeter is the narrow and busy A377. It has been the site of at least one cycling fatality near Newton St Cyres.
An alternative route is possible using the lanes north of the A377 through Sweetham. However this route is compromised at both ends - at Exeter in the Cowley Bridge area and in Crediton by the approach along the A3072.
Development of a safe route is belived to be of high priority.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.