20/03704/FUL: 1no. dwelling, Lovers Walk, Cambridge
Demolition of existing car port and storage area and erection of 1no. dwelling and associated curtilage
Land Adjacent 1 Lovers Walk, Cambridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing car port and storage area and erection of 1no. dwelling and associated curtilage
Land Adjacent 1 Lovers Walk, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from a small house in multiple occupation (C4) to a large house in multiple occupation (sui generis)
102 Chesterton Road, Cambridge, CB4 1ER
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of 1 no. building (Barmore) and erection of a four-storey building providing student accommodation, college cafe and social learning space, ancillary facilities and external works.
Lucy Cavendish College, Lady Margaret Road, Cambridge, CB3 0BU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a one bedroom bungalow and associated works, 17 Mere Way Cambridge CB4 2JP
Created by M Stanley // 1 thread
Traffic regulation orders for the A647 Bus priority scheme.
Proposals for trial infrastructure along the A660
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03519/FUL | Change of use of an existing two-storey residential extension to form a separate two-bed dwelling. | 72 Ramsden Square Cambridge CB4 2BL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03535/FUL | Demolition of existing and construction of eight dwellings and associated external works | Good Technology 355 Newmarket Road Cambridge CB5 8JG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03501/FUL | Demolition of existing garages and hardstanding and the construction of 7 No. modular homes. | Land At Barnes Close Cambridge CB5 8RR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The government said that it expects Combined Authorities to lead the restart of the transport system following the Covid lockdown. The Transport Restart Group is chaired by the Combined Authority (its leads are James Palmer and Paul Raynes) and brings together the two highways authorities, police and public health colleagues, the two main city councils, a representative bus operator, Network Rail, Highways England, and the Department for Transport. It has met weekly since 1 June.
The group has three main tasks:
(a) ensuring the public transport restarts to as near 100% of pre-Covid network as possible;
(b) ensuring a package of active travel measures is implemented to mitigate potential increases in private car use;
(c) monitoring data in relation to the impact of Covid – 19 on transport and considering what further measures might be needed to maintain the transport recovery.
Outline Planning with all matters reserved, except for the vehicular accesses onto Station Road, for the demolition of a single dwelling and associated buildings and development of up to 107 dwellings (including affordable housing) and employment/ community/ cafe/ development together with parking areas, landscaping and all associated infrastructure.
Land West Of Station Road Longstanton Cambridge CB24 3DS
Cambridge
Application reference : 20/03598/OUT
Created by Roxanne (CEO) // 1 thread
Redevelopment of office building
Created by Steven Moseley // 1 thread
"We’re widening the A12 between junction 19 (Chelmsford) and junction 25 (A120 interchange) to ease congestion and cope with increasing traffic demands."
Created by Steven Moseley // 0 threads
This single carriageway section of the A120 is regularly very busy and there have long been calls for it to be improved, as the section between the M11 and Braintree was in the early 2000s.
ECC has worked up and consulted on its favoured route to "create a modern dual carriageway link connecting Braintree and the A12" to recommend to Highways England.
Given that the proposed route bypasses the current A120, there should be scope for improving provision for cyclists and pedestrians both along the new road and along the newly de-prioritised `old'-A120, especially around Marks Tey and its station.
Construction is currently slated for 2023-6.
Created by Simon Still // 1 thread
https://www.lcc.org.uk/articles/finding-your-way-on-londons-cycle-infrastructure-1
none of the apps that use OpenStreetMap as a base - Citymapper, Cyclestreets and Cycle.Travel amongst them - offer a great user experience and they all tend to prioritise complex back street rat run routes over Londons main road infrastructure. There's a real need to tweak these app routing algorithms so that new cyclists can benefit from the high quality infrastructure thats being built.
In future theres also the potential to do more with OSM - we would love to see “accessibility graded” routing as a future capability using information about path surfaces, gradients or things like width restrictions that are a problem for some types of cycle or rider
Created by John Chamberlain // 0 threads
From 17th August to 2nd October North Gower Street will be closed to all except pedestrians at the Euston Road junction. This blocks the signed cycle route between the Hampstead Road and the Euston Road pop-up lanes.
Created by John Chamberlain // 0 threads
From September 14th for 6-8 weeks, Tavistock Place will be closed to motor traffic between Herbrand Street and Marchmont Street. Cyclists will be diverted into the main carriageway.
20/03254/OUT | Outline planning with all matters reserved except for access for redevelopment of land for 44 residential units with public open space provision, landscaping, means of access and associated works following demolition of No's. 30 and 32 New Road, Over - Resubmission of S/1279/18/FL | Land At And To The Rear Of 30 & 32 New Road Over Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of garage to habitable space and erection of bike store in front garden.
2 Wilding Walk Cambridge CB4 1RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of Community Cafe.
Chesterton Methodist Church, Green End Road, Cambridge, CB4 1RW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. 1.5 storey dwellings and retention of existing flats, together with bin & cycle store and landscaping.
30 Davy Road Cambridge CB1 3QW
Created by Steven Moseley // 0 threads
EIA Scoping Opinion Request for a new link road between the A120 and A133 comprising dual two-lane carriageway; at grade junction connecting the proposed link road to the A133; two potential intermediate roundabout locations giving access between Allen’s Farm and the Garden Community development, and Tye Road (NW) and the Garden Community development; an underpass for future proposed Rapid Transit System and a diverted public right of way (PRoW); one grade separated dumbbell junction (two roundabouts linked by a single bridge) connecting the link road to the A120; new access road to Colchester Waste Transfer Station north west of the proposed A120 junction; and new two-way access to an existing petrol station west of the proposed A120 junction
Land between the A120 and A133, to the east of Colchester and west of Elmstead Market
Essex
Application reference : CC/TEN/94/20/SPO
sound+fury // 1 thread
This unusual application is just for the cycle parking and bollards for the former Sally Ann's shop.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.