23/04840/FUL ew office building off Maids Causeway
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
Created by Gregory Williams // 3 threads
There isn't a suitable cycling route between Buckland Valley and Dover Christ Church Academy. The hill is steep and traffic levels on Melbourne Avenue.
Created by Gregory Williams // 1 thread
There is a comparatively new shared path linking Burgess Road to Alyesham's station. However the Burgess Road end of the shared path doesn't have a dropped kerb to allow a transition between road and path and vice-versa.
23/04054/FUL (4 flats) replaces 23/01815/FUL (8 flats, withdrawn) without resolving conflict with shared-use path.
Application reference : 23/04054/FUL
Created by Gregory Williams // 1 thread
The sign towards the Town Centre is missing. Previous view of the sign here:
Created by Gregory Williams // 1 thread
The sign pointing into Alfred Road at Lorne Road is missing.
sound+fury // 1 thread
Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court
Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
Cambridge
Application reference : 23/04037/FUL
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Announcement from Cam Conservancy:
https://www.camconservancy.org/public-announcement
Tree management Programme 2023/24 A recent tree survey has identified the necessity for pruning and in some cases felling dangerous trees to ensure the safety of those using the Halingway.A ‘TTRO’ Temporary Traffic Regulation Order has been approved to temporarily close sections of the Halingway/towpath (Chesterton to Clayhithe) between 1 November until 31 March 2024.
The Conservancy appreciates this may cause some temporary inconvenience, however these works are necessary and have been planned to ensure the safety of those who use the Halingway and the staff carrying out the works.
Street Light FCND004 on Falala Way (NCN1) - Not Working Fault Number: 750068
Created by Owaldron // 1 thread
See Picture, Reported to CCC. However, I have a hunch that it may be the responsibility of 'LandMarc' on behalf of the MOD as I think they would own that land.
Created by Gregory Williams // 1 thread
A better cycle connection is needed to Rough Common, avoiding the need to use the A290 Whitstable Road or A2050 and Palmars Cross Hill.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by WilliamNB // 0 threads
When cycling north-bound along Tavistock Road, there is a cycle lane in places. Once out from under the Crownhill Road bridge the lane turns sharply left, forcing cyclists to yield to traffic joining Tavistock Road from the left.
The Highway Code states you should yield to traffic from the right and this junction is very dangerous to cyclists. It would be far better to simply continue the cycle lane straight ahead and erect yield signs to traffic joining Tavistock Road
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
There is a campaign to get Google (who are currently building their new HQ in the King's Cross development) to provide this much-need bridge for pedestrians and cyclists. See http://googlebridge.kccp.org.uk/ .
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 0 threads