Coldham's Lane/New St/Retail Park
Hard to exit from New St onto Coldham's Lane. Difficult to negotiate the retail park roundabout.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 0 threads
Hard to exit from New St onto Coldham's Lane. Difficult to negotiate the retail park roundabout.
sound+fury // 1 thread
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
sound+fury // 0 threads
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
sound+fury // 0 threads
Traffic signals hold up not just vehicles but bike riders too. This should change with consideration given to walkers as well.
Created by Jean Dollimore // 1 thread
Due to the expansion of Euston Station to accommodate HS2. residential parking has been reduced around Euston Station, which has triggered a review of provision in the CA-G CPZ.
sound+fury // 0 threads
Several bikes fly parked in this area, showing that bike racks would be welcome. (Reported originally on Twitter by Alex Raha (@Rahario)
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by Roxanne (CEO) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/0202/17/OL for the development of 110 dwellings with areas of landscaping and public open space and associated infrastructure works The outline was screened and confirmed not too be EIA development
Land east of Teversham Road, Fulbourn, Cambs
South Cambridgeshire
Application reference : S/3290/19/RM
Created by Roxanne (CEO) // 1 thread
Development of retirement care village in class C2 comprising housing with care, communal health , wellbeing and leisure facilities, public space , landscaping, car parking, access and associated development
Land Rear Of 163 To 187 High Street Bottisham
East Cambridgeshire
Application reference : 20/00296/OUM
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by David Earl // 1 thread
The cycleway has a sever problem with tree-root damage. The largest fault is a sharp triangular profile about 10cm high. This has been reported to CambsCC six times according to their fault reporting, starting two years ago, including one person who came off their bike beacause of it. I reported it in September 2018. Nothing whatsoever has been done about it.
I wrote to my county councillor (John Williams, in whose division this also lies) about the failure to act in January. He did not reply. I have written again today.
Yesterday, I was thrown off my bike by my pedal catching the largest upstand. Fortunately the only damage was a sore knee for a few hours.
I have now made a formal complaint of negligence to the Counmty Council. They have had two years and a report of injury, but have failed to act.
Created by David Earl // 1 thread
The chain-link fencing on the south side of the path on the west ramp off the Tins rail bridge is badly bowed out into the path. This is at face level and could take someone's eye out: it is dangerous.
There was already a report on county HIghways for this, which was dismissed as "landowner responsibility", which may be network rail or may be the chalk pits land. There was no indication in the closed issue whether they had actually informed the landowner, so I reported it again today.
Local Plan for LBRUT is being revised to line up better with Mayor and local policy
Martin Lucas-Smith // 1 thread
This is a hostile roundabout. It has been fiddled around with over the years, to add advisory cycle lanes, lights, pedestrian crossings, etc.
The area needs a fundamental redesign, to replace the roundabout probably with a protected intersection design.
It is outrageous that a health site such as Addenbrooke's has such an unsafe and anti-cycling junction as its main entrance.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Martin Lucas-Smith // 0 threads
Now that the residents' parking scheme is in place, it is clear that there are many more spaces provided than are actually in use.
The amount of space should be slimmed down ASAP.
In particular, the area round the exit from the cut-through from Clifton Road desperately needs to have the parking removed year, to make the visibility much better. A couple of vehicles park there, yet they could easily park 20m away in one of the now empty bays.
Station Road has a bit of cycle lane provision, but it is spotty.
There should be cycle lanes on both sides of the road, the full length.
Taxis should have to queue in the station area car park itself, not 250m away on Station Road.
The streetscape along Riverside was upgraded several years ago at the town end. But it then stops.
It should be completed, all the way to Stourbridge Common.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 0 threads
Maid's Causeway and the town side of Newmarket Road (until the roundabout) is a mish-mash of a few bits of cycle lane. This is a wide road.
This should be changed to proper cycle tracks. This can be done without moving pavements.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 0 threads
Gonville Place at the Mill Road end needs queue-busting cycle lanes, as per East Road.
As the image shows, there is plenty of space here.
The Hills Road end goes to three lanes so that would be more difficult. The Mill Road end is much easier and can be regarded as a simple 'quick win'.
Martin Lucas-Smith // 0 threads
Like many areas of Petersfield, Ainsworth Street has no cycle parking but there are bikes left along the pavements.
Cycle parking should be provided.
Every night, and during the day, there are always at least some spots of car parking unused. Therefore there is scope to remove a few spaces and install residential cycle parking, as per Thoday Street.
Martin Lucas-Smith // 0 threads
Kingston Street has a major problem with pavement parking.
Bizarrely the yellow line restriction on the east side (nearest the railway) allows parking on that side of the road during certain times, but that is not possible to do without either blocking the road or parking on the pavement.
Current restrictions are Monday-Saturday, 8.30am-5.30pm. This should be double yellow lines (24 hours). That would still permit deliveries.
Created by Jean Dollimore // 1 thread
Camden Council wants to improve the Kentish Town area, including improving air quality and making walking and cycling easier and safer. The area included is shown on the attached map on which we have added blue lines to show the links in the Camden cycle network in this area. See map image with the Issue.
Camden has already been engaging with stakeholders at meetings and with local people via the Commonplace engagement map (see link).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area