Healthy Route: Brockwell Park to Gipsy Hill
Formerly Quietway 7.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by JonC // 1 thread
The South Central Growth & Transport Plan (SCGTP) is a new transport strategy to help direct and plan transport improvements and investment in Welwyn Hatfield, Hertsmere and St Albans, developed in line with forecast development to 2031.
Created by John Chamberlain // 1 thread
Resurfacing works on Gower Street from 24th Feb to 26th April.
Created by Jean Dollimore // 1 thread
Camden Council is consulting on a proposal to make the Healthy School Street Scheme on Savernake Road, outside Gospel Oak Primary School, permanent.
Created by Roxanne (CEO) // 1 thread
New development to the west of Cambourne with 200 dwellings
Created by Roxanne (CEO) // 1 thread
Email from Camcycle member about Garret Hostel Lane and Burrell's Walk:
There are some faded indications here of which side bikes and pedestrians
are meant to use. These need repainting to help reduce conflict,
particularly for tourists and people new to the city.
Created by Stefano B // 1 thread
New TFL survey on the proposed Wembley to Willesden Junction CS.
Have your say - Healthy Streets improvements between Wembley and Willesden Junction
Transport for London (TfL) and the London Borough of Brent are working together to develop Healthy Streets improvements between Wembley and Willesden Junction. These changes would make it easier and safer to walk, cycle, and use public transport in the area. Making the area safer, greener and reducing car travel. In this area, every year, people are seriously injured, some fatally. This cannot go on, and the Mayor has set a target to reduce the number of deaths and serious injuries on London’s roads to zero by 2041. Toxic air quality and high levels of physical inactivity are also contributing to premature deaths and poor health, especially in children. Together we want to improve this, particularly around schools. We know to achieve this some compromises will have to be made especially how much we use cars to travel. We want to create a better environment for everyone who wants to travel to and around the borough. So we are inviting local people to tell us how they currently travel around the area and what changes they would like us to make that would help and encourage more people to choose active travel options in the community.
Have your say - Your feedback at this early stage of planning will be used to help design future proposals which would be consulted on in late 2020/early 2021.
Please complete the following survey by 22 March 2020 to help us better understand how you travel and any travel issues or priorities in the areas of Wembley Central, Tokyngton, Stonebridge, Harlesden, and Kensal Green. Please email wembleywillesdenjct@tfl.gov.uk if you have any questions, comments or suggestions.
Anon // 1 thread
Overview
We are improving walking and cycling facilities on Sumner Street including the junction with Southwark Street. These changes will:
Created by Harry Fletcher-Wood // 1 thread
Hackney Council are proposing protected cycle tracks along Green Lanes from the borough boundary with Haringey to (and beyond) the boundary with Islington.
If they can't get funding from TfL they will create an interim scheme with painted cycle lanes.
https://consultation.hackney.gov.uk/streetscene/green-lanes/
Anon // 1 thread
Summary
We would like to know your view on our proposals for:
These changes will improve safety, encourage cycling and walking in line with the Healthy Streets approach, and will enable the junction to form part of Cycleway 17. These changes represent the first stage of wider area changes as part of the Camberwell area-wide study.
The key measures proposed are:
Created by ClareM // 1 thread
Back on 12th December 2019, I cycled over Riverside Bridge and noticed that one of the bridge cables had been cut.
I've just uploaded 2 photos to CycleStreets:
I would like to know if it is since been repaired -so if anyone here cycles over Riverside Bridge, please could you take a look.
And if it has not been fixed, who/how show I report it, please?
Or has anyone else reported it already?
Thanks
Clare
Created by JonC // 2 threads
TfL and boroughs are also working with local communities in each area to give the high streets local branding and identity. This includes welcome signage, wayfinding to local points of interest such as markets and artwork championing subjects of local significance.
The first six locations to receive Healthy High Streets funding include:
Created by Shaun McDonald // 1 thread
Could Ancaster Road become a bus gate allowing walking, cycling, buses, and taxis only to encourage active travel and public transport use over the private cars for short journeys to the station and town. This would help to make Birkfield Drive quieter for walking and cycling, as the hill currently makes it a particularly poor experience for cycling up.
This is a more radical idea, however is the sort of thing that's required for resolving the climate emergency and encouraging active travel. This sort of thing is very common in places like The Netherlands.
Created by Toby H // 1 thread
Testing for Wandsworth strategic routes
CS8 improved and continued.
Created by Hounslow Cycling Campaign // 1 thread
London Borough of Hounslow says that "In June 2019, Hounslow Council declared a climate emergency. In recognition of the urgent threat posed by climate change, we have committed to reducing council emissions to net zero by 2030, as well as working with residents and businesses to help reduce their own carbon emissions.[...] The draft Action Plan outlines seven key programmes for reducing Council direct carbon emissions, and in acknowledging the Council’s community leadership role, we have developed a further six programmes to address borough-wide emissions."
The document setting out the proposed Action Plan is long and somewhat long-winded, as is the way of these things. The seven internal programmes and six external ones are outlined in easy-to-read graphics on pp40-41 and pp51-52 respectively.
Created by John Chamberlain // 1 thread
Camden is consulting on a Planning Brief for the Euston Station Area
Created by Jean Dollimore // 1 thread
The proposed Climate Action Plan proposes the first of two 5-year programmes towards vision of a zero carbon Camden by 2030.
Created by Roxanne (CEO) // 1 thread
The Cambridgeshire County Council is going to reduce pay and display parking in this location by 10m to allow installation of a car-share space and three cycle parking stands.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Lee Crawfurd // 1 thread
The barriers are too narrow to fit cargo bikes through
sound+fury // 1 thread
This is an application from Emmanuel College to develop land on Park Terrace. They propose student accommodation, a bar and lecture facilities.
Created by Roxanne (CEO) // 1 thread
Hybrid application - (i) Full application for the erection of a mixed use building including a children's nursery (Class D1) and offices (Class B1); (ii) Outline application (Matters of access, landscaping, layout and scale to be considered) for approximately 7500 sqm of office (Class B1) and ancillary space; (iii) Asociated works, including hard standing and landscaping
Cambridge Innovation Park North, Stirling House, Denny End Road, Waterbeach, CB25 9PB
South Cambridgeshire
Application reference : S/2784/19/OL
Created by Patrick Pawsey-Vale // 1 thread
I was cycling along the two-way cycle path, segregated, next to the road on Donnington Bridge in Oxford, on my cargo bike, with the two kids in the front carrier.
This was Monday 27/01/20.
It was raining like mad, so it took me a moment to realise the cyclist coming the other way who was waving their finger at me and saying 'You should be on the road, sir' was a Police Community Support Officer.
It's confused and disturbed me - as I don't believe there is any access restriction to the two-way cycle path, my bike is no wider than any other dutch bike (it's no wider than its handlebars) and I certainly don't want to be forced onto a very nasty stretch of road on one of the key river crossings of Oxford with my baby and 4 year old on board.
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme - there's too much traffic in the area - and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 3
Anon // 1 thread
Overview
We would like to know your views on our proposals along the A202 (Peckham High Street) between the junctions with Basing Court and Mission Place. The proposals aim to address identified safety issues, while providing a safer and more pleasant environment for those walking, cycling and using public transport in the area.
Tragically, along Peckham High Street there have been three fatal collisions since 2015, most recently in January 2020. TfL is seeking to eradicate deaths and serious injuries from our roads, in line with the Mayor’s Vision Zero policy for London. We believe that when people leave their homes each day, they should feel safe and confident about the journey ahead. By taking the following steps along Peckham High Street, we hope to create a safer road layout for everyone travelling in Peckham.
Our proposals also form part of the Mayor’s plan for Healthy Streets, a long-term vision to enable more people to walk, cycle and use public transport by making London’s streets healthier, safer and more welcoming.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.