About page on CCC web site
Final version at https://www.ensembling.com/68508
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Hall // 0 threads
Final version at https://www.ensembling.com/68508
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Gregory Williams // 1 thread
The cycle route warning signs on lighting columns QAD014 and QAD011 haven't been reinstated following the replacement of lampposts in Queens Avenue. These Google StreetView images show them on the old lampposts:
http://goo.gl/maps/QDqt8
http://goo.gl/maps/KNzNY
The signs should be reinstated to ensure that other road users are aware that they should expect to see cyclists emerging from the section of cycle path adjoining Queens Avenue.
Created by Shaun McDonald // 1 thread
There is a new something being installed in the middle of a shared cycle pavement (see photo), yet there is already limited space, especially at peak times.
South Glos Council have published a consultation for extending the cyclepath from Emersons Green to Yate - the Yate Spur
https://consultations.southglos.gov.uk/consult.ti/YateSpurWesterleighRd/consultationHome
Funding has been secured through the Local Sustainable Transport Fund to deliver elements of the Yate Spur cycle path. When complete, the route will connect the Bristol to Bath Railway path with Yate.
The proposed road crossing will provide an informal crossing facility at Westerleigh Road for cyclists, walkers and horse riders using the Yate Spur Cycle Path and Fishing Lakes Link.
At the lower end of the cycle path that runs from Church Lane, up Madley Brook to Madley Park, is a bridge set at a weirdly sharp angle to everything else.
Coming from Church Lane, it is immediately after a blind corner, requiring a sharp right turn; then the bridge requires a sharp left turn. At this very point, before the wood of the bridge, the road surface is uneven and has collapsed.
While the cycle path apparently has to briefly join the footpath - no permission given for a way through on the south side of Madley Brook? - it does so in a very dangerous way, which is difficult even for experienced cyclists to negotiate, and provides no visibility of other route users including pedestrians.
When it rains, Skippet Lane between Ramsden and Finstock fills with gravel, soil and other associated rubble. It has collected at the bottom of the hill, and is particularly hazardous on the left-hand bend there.
This road - a useful route for cyclists wanting to avoid the main Witney-Charlbury B road - needs regular checking and clearing of detritus, as it has been like this now for at least a year.
Created by Gregory Williams // 1 thread
Parking over the shared cycle / foot path appears to be a routine occurrence in the Bluebell Road / Orchid Court / Poppy Mead area of Park Farm. This makes the path difficult to use as a cyclist.
Created by Gregory Williams // 1 thread
Inconsistent and incorrect No Cycling signs exist at the Sheepfold Lane end of the Great Oak Row cycle / foot path. Cycling is permitted here, as can be seen from the cycle symbol on the ground. These signs should be replaced with shared-use cycle / foot path signs to avoid causing confusion.
Created by Gregory Williams // 1 thread
A lamppost is positioned in the way of a cycle path beside Bluebell Road at its junction with Sheepfold Lane. It is particularly hazardous if cycling along Bluebell Road west-to-east and then transitioning onto the cycle path beside Sheepfold Lane just before the road junction.
Created by Gregory Williams // 0 threads
There is no cycle parking at Chilham railway station, thus discouraging people to cycle to the station. The photo shows that there is plenty of room on the platform for a few stands to be installed.
Created by Gregory Williams // 1 thread
Chilham village is currently somewhat isolated from the cycle network by the busy A28 and A252 roads. It should be linked to the NCR18 route being developed linking Chartham and Godmersham.
Created by velocipedus@gmail.com // 1 thread
This issue offers resources for a dialogue with motorist, through the media, through their organisations, etc.
http://camcycle.cyclescape.org/issues/67 already offers some threads on taxi drivers (could be united)
Created by David Wilcox // 0 threads
This is a busy rat run and a bus route! As evidenced by the google street view, a pedestrian desire line runs through from Butterfield Road to Bishop Manor Road. The consultation is at: https://www.citizenspace.com/bristol/city-development/bishopthorpe
Pavement Parking is the issue here, blocking sight lines. The proposed road markings and build outs will help. If they are enforced.
As specified in the website below there is a consultation on Satchfield Close in Henbury Bristol.
https://www.citizenspace.com/bristol/city-development/satchfieldclose
Looks like parking is a problem for the locals as they can't seem to drive a car onto their driveways.
The council is keeping the large tree in the scheme and hopefully it will stop the inhabitant's from parking on the pavement.
Created by Gregory Williams // 1 thread
The Conningbrook Lakes development proposes 300 dwellings together with the creation of a country park and water sports facilities. The development offers the opportunity to improve the alignment of NCR18 by making it shorter and removing the blind junction at Blackwall Road North / Willesborough Road and the uncontrolled crossing of the A2070 near Premier Foods.
Created by Chris Howell // 1 thread
http://www.cambridge-news.co.uk/News/Future-of-two-more-pubs-hangs-in-balance-02012013.htm
Comment from highways:
"The application claims provision of 24 cycle parking spaces; however I am unable to locate the proposed spaces on the plans. Please require the applicant to show the proposed parking provision, with dimensions on the plans and submit same for comment by the Highway Authority prior to determination of this application."
I looked round this site when it was for sale - the building occupies almost the entire plot - I can't imagine how they would get 24 cycle parking spaces on site (let alone with bin storage as well). Highways point definitely needs addressing.
Closing date for comments 8th Jan.
Created by Gregory Williams // 1 thread
The cycle filter lane markings on South Canterbury Road for the right turn into Stuppington Lane need to be refreshed. The cycle lane markings in Stuppington Lane also need to be refreshed. These markings make it clear to drivers that they should expect to encounter cyclists here and should adapt their driving accordingly.
Created by cobweb // 1 thread
Flagging this up as the city's cycle parking standards basically say racks are provided on merit for hospitals so it could be useful to check what they're offering.
Created by velocipedus@gmail.com // 9 threads
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
Created by cobweb // 1 thread
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
Created by Gregory Williams // 1 thread
Both ends of the new cycle path between George Roche Road and Stuppington Lane in Canterbury do not have properly dropped kerbs. This makes joining / leaving the cycle path dangerous. Properly dropped kerbs should be installed.
Additionally the visibility to the SW at the junction with Stuppington Lane is poor due to a hedge immediately adjacent to the junction. The sightline needs to be improved here, since road users approaching from the SW will not be able to see cyclists and pedestrians about to emerge from the path. Likewise cyclists and pedestrians turning into the path will not be able to see anybody else on the path that's approaching the junction.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The A14 Histon Interchange is hostile to bikes as their is no way to safely cross the entrance slip roads onto the A14.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en