210797 Headgate Building
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
Created by Roxanne (CEO) // 1 thread
How should the junction with Glisson Road and Hills Road be improved to improve safety for people cycling, walking and driving?
Created by Edward Taylor // 1 thread
This is an ideal solution to the flow at Landbeach road.
Mobility needs from Landbeach, highlighted in Milton community are to provide cycle crossing at the A10 for school kids and parents.
Created by Dominic Fee // 1 thread
Westminster City Council made an experimental traffic order on 8 February 2021, which will have effects including to:
"(a) prohibit all vehicles from entering or proceeding in Vigo Street, between Savile Row and Sackville Street (except pedal cycles which will be able to travel in both directions);
(b) introduce one-way working south-westbound in Burlington Gardens, between Savile Row and Cork Street (except pedal cycles);
(c) reverse the one-way working in Sackville Street so that it applies in a northwestbound direction"
Created by Steven Moseley // 1 thread
Opening in Spring 2021, the Northern Gateway Sports Park is a 76 acre site providing both indoor and outdoor sport and leisure activities.
Created by Steven Moseley // 1 thread
Alterations to car park with the erection of a freestanding restaurant with drive-thru facility, car parking, landscaping and associated works, including Customer Order Displays (COD), Goal Post Height Restrictor and Play Frame.
Created by Steven Moseley // 2 threads
The scheme will see the replacement of the double roundabouts located at Ipswich Road and Harwich Road with a single roundabout at each location. The carriageway between Ipswich Road and Harwich Road junctions will also be widened to accommodate two formal lanes in each direction. The scheme will include upgrading existing pedestrian crossings to signal controlled crossings and general improvements to the current off-carriageway cycle and footway provisions.
The scheme will improve the performance of these two key intersections on the A133 and renewal of the infrastructure will reduce maintenance costs. It will also improve the existing highway assets including the strengthening of two retaining walls, one between Ipswich Road roundabout and the adjoining railway line and another between Ipswich Road roundabout and the Waitrose Car Park. The Scheme has also supported the Cowdray Bridge refurbishment, now being progressed separately through the structures capital maintenance programme.
cyclescape user // 0 threads
The current hardcore path is often not usable for walking / cycling during wet weather. The path is difficult to pass through due to water on the surface. A new tarmac option would be much better. A new drop kerb on Bell Court and widened access would also help improve this route. Note the path gives access to a local football pitch as well as a local park. Cycling and walking in the area would increase if this issue was fixed.
sound+fury // 1 thread
Proposal to demolish a couple of houses on Brooklands Avenue.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 121272 for the construction of 201 dwellings.
Parcels R01, R02 & R03, G1, G3, G4 And Osf1 North Colchester Urban Ext, Mile End Road, Colchester
Created by Steven Moseley // 1 thread
Application for approval of details reserved by conditions 5, 15, 16, 17, 19, 20, 21, 22 & 23 of 193133 (Phasing, CMS, Remediation, levels, finishes, landscaping, cycles, loading.)
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from Offices (Class B1(a)) to 10no. dwellinghouses (Class C3)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Extensions and internal alterations to create 7 no. new apartments including new detached 1 bedroom unit in rear curtlilage with off road parking for 2 vehicles and bins and cycle store
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for development at Land South Of Coldhams Lane, Cambridge
Land South Of Coldhams Lane Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing structures, erection of new building containing nine self-contained residential units, with associated parking, hard and soft landscaping works, and associated works and infrastructure
509 Coldhams Lane Cambridge CB1 3JS
Created by John Chamberlain // 1 thread
Eastbound Cycle Lane on Tavistock Place closed for 2 weeks
Created by Roxanne (CEO) // 1 thread
How can cycling on Trumpington Road be improved, especially to make it safe for people cycling to local schools?
Created by Alex Jenkins // 1 thread
The Council is committed to supporting Brick Lane’s recovery from the Covid-19 pandemic and wants to use the investment of the Liveable Streets programme to support Brick Lane businesses and the local community in months and years ahead.
Future Visualisation of Brick Lane(External link)
These proposals have been developed on feedback based on residents, businesses and local community. We are consulting on these proposals now, so that if they are supported we can implement them in time for Summer to benefit businesses, the local community and visitors.
Our proposals:
What is being proposed?
Three schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Our proposals include environmental enhancements and traffic calming measures to improve accessibility and safety for all and to encourage active travel.
Why are these proposals important?
Brick Lane is an iconic area of London that attracts over 18,500 pedestrians every day. This space is also shared with over 4,000 vehicles, many of which use Brick Lane to cut through the area. This means they are not visiting local businesses, schools or places of worship but are significant contributors to the already unacceptable levels of air pollution and congestion along Brick Lane.
School streets are central to our Brick Lane proposals to address key safety and air quality issues. Our initiatives will create accessible and safer school travel routes by reducing the number of cars polluting the school environment and improving road safety for children.
These proposals are a key part of Tower Hamlets commitment to support Brick Lane’s economic recovery from the Covid-19 pandemic and aims to attract more visitors to the area and support businesses to trade safely.
Overview of Brick Lane Proposals
Overview plan of all proposed works in the Brick Lane area. Please click to enlarge(External link)
Have your say
Your views on our Brick Lane proposals are important to us. You can have your say by providing your feedback through our online survey.
If you have any issues or questions you can either leave a question via our Q&A tool or alternatively email liveablestreets@towerhamlets.gov.uk(External link)
If you would like to raise any questions in Bengali or request a translated copy of the consultation booklet in Bengali then please fill out the request form here.
The consultation is open from Wednesday 17th March and closes at 11:59 on Wednesday 14 April 2021.
Coronavirus update
Our Liveable Streets programme team are following government advice and are currently working remotely. Work will continue as planned on the projects and the team will adhere to all guidelines.
Please note that construction timing is subject to change depending on changes to coronavirus restrictions, weather and coordination of works in the area. We will update the website with any changes to the programme and hope you will continue to help us improve the look and feel of your neighbourhood.
For coronavirus updates from Tower Hamlets or to join our mailing list please click here(External link).
If you have any questions regarding the construction phase please see below, or get in touch with the team by emailing LiveableStreets@towerhamlets.gov.uk(External link) or calling 0203 092 0401.
Created by Richard Ollerenshaw // 1 thread
Row of parked cars on busy road requires vehicles to overtake into oncoming traffic. Cyclists repeatedly forced into gutter at this location by oncoming vehicles.
Created by Robin Heydon // 1 thread
Proposed new development on the A505 between Heydon and Fowlmere
Created by John Chamberlain // 1 thread
Eversholt Street closed to all southbound traffic including cycles till late May
Created by Roxanne (CEO) // 1 thread
Last month, the Government launched the process to develop a long-term Spatial Framework for the Oxford-Cambridge Arc. The Government’s ambition is to support a better, more sustainable approach to planning for growth and investment in the area.
The Government's proposal:
https://www.gov.uk/guidance/oxford-cambridge-arc
What is the Arc?
The Oxford-Cambridge Arc (the Arc) is a globally significant area between Oxford, Milton Keynes and Cambridge. It is formed of five ceremonial counties: Oxfordshire, Bedfordshire, Buckinghamshire, Northamptonshire and Cambridgeshire.
It supports over two million jobs, adds over £110 billion to the economy every year and houses one of the fastest growing economies in England.
Our ambition for the Arc
There is an opportunity, recognised by government and local partners, to build a better economic, social and environmental future for the area. With high-quality, well-connected and sustainable communities making the Arc an even more beautiful place to live, work and visit.
Delivering the ambition
To achieve this ambition, the government alongside local partners, is going to:
Develop a Spatial Framework for the Arc; a long-term strategic plan to help coordinate the infrastructure, environment and new developments in the area. We are committed to working with local communities throughout so we can create beautiful and sustainable places for residents and workers to enjoy.
Explore the creation of an Arc Growth Body; that would be a clear economic leadership voice for the Arc, championing its talent and assets internationally, supporting businesses, and fostering innovation.
Areas of focus
Productivity and jobs
The Arc currently generates over £110 billion to the UK economy every year.
The Arc has the potential to become a world-leading and globally renowned centre for business, innovation and investment in a variety of industries, including AI (Artificial Intelligence), advanced manufacturing and life sciences.
Placemaking
With a strategic approach to planning for growth, we can enhance the area’s natural environment and biodiversity, ensure communities and businesses have access to the infrastructure they need, and ensure new development is more affordable and beautiful so that it enhances places across the Arc.
Infrastructure and connectivity
Improving connectivity across the Arc with a new rail line between Oxford, Milton Keynes and Cambridge will link communities with employment and leisure opportunities.
While integrating sustainable and accessible transport options will support our ambition for the Arc and ensure homes and employment sites are situated in the right places.
Environment
Encouraging clean growth and the creation of sustainable communities will support us in improving the quality of life for those that live and work in the Arc. While also helping us future-proof its businesses and communities against the effects of climate change.
Key documents
Created by davidsecher@gmail.com // 1 thread
This is probably an old issue, but I only discovered this cycleway on Sunday. I very nearly had a bad accident cycling through the pinch point (pram arms) at the Dry Drayton end of the Bar Hill Cycleway. There are many photos on Cycle Street's photomap (e.g. 26327) that illustrate the invisibility in the shade of the metal arms. No signage or reflective tape to warn of the hazard. For me, this is MUCH more dangerous than the A14 bridges. (I have signed the petition and attended the Highways meeting.) Similar obstruction towards Bar Hill too, but by then I knew to walk the bike through!
Created by Steven Moseley // 1 thread
CONVERSION OF EXISTING GROUND FLOOR D2 USE INTO 4 APARTMENTS
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.