Blackfriar's junction very difficult for cyclists
Blackfriar's Bridge is a major collision blackspot that actively discourages people from cycling.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 0 threads
Blackfriar's Bridge is a major collision blackspot that actively discourages people from cycling.
Created by Gregory Williams // 0 threads
The cycle parking standards for Medway can be found here:
http://www.medway.gov.uk/pdf/Medway%20Council%20Residential%20Parking%20Standards%20Jan%202010.pdf
The standards have low minimum quantities and are very basic in their detail. There is no mention, for example, of the minimum space needed to be left around cycle parking, or the spacing of the cycle parking for it to be effective. Nor is there any mention of what constitutes an acceptable type of cycle parking (e.g. Sheffield stands) and what is unacceptable (e.g. wheelbenders). No mention is made about provision of covered cycle parking. No mention is made of the proximity of cycle parking to building entrances. No mention is made of the need for cycle parking to be highly visible and for lighting and CCTV coverage.
Created by Simon Nuttall // 1 thread
The cycleway between Fen Ditton and Horningsea
Created by Rohan Wilson // 0 threads
The adjacent, approved plot, 11/05530/FUL designed by the same architectural practice, places the cycle cupboard next to the front door and closer to it than is the car.
THIS proposal, however, offers the standard back-of-garden shed for bins and bikes, with the bikes beyond the bins, while the car driver door is adjacent to the house front door...
Note Manual for Streets 8.2.1, quoted in a prominent panel on p5 of the Cambridge Cycle Parking Guide:
"In residential developments, designers should aim to make access to cycle storage at least as convenient as access to car parking."
Created by Rohan Wilson // 1 thread
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is proposed as study rooms for students aiming to enter university. Thus they would be old enough to cycle independently within Cambridge, for example between their places of residence and the various study buildings.
Remarkably, it is suggested (Planning Statement) that the students might park their bikes on Station Road where cycle parking is available, and might be augmented, and walk to the proposed site. This is a distance of 700m, taking 10 minutes at a normal walking pace plus any waiting time to cross the East Road/ Regent Street junction. Any student with a cycle at Station Road would be likely to wish to use it to continue to the proposed site, if parking arrangements provided there were reasonably convenient and secure.
We are told that the Regent Street site is closer to the student residences than Free School Lane, but no more definite information is given as to how far the residences are from the proposed site or from Station Road.
The city's cycle parking standards are presumably set to reflect normal levels of demand from staff and students, and no explanation is given as to why "very few students have bicycles".
The access to the suggested cycle parking in a narrow yard at the rear of the building is presumably the gated passageway to its north. This is not made clear, nor is it clear whether there are steps to be negotiated. It seems impossible that more than perhaps a dozen bicycles could be parked in the yard most of whose width appears to be less than a bike's length, leaving no room for daily or emergency access with the parking arrangement indicated.
The transport aspects of this proposal have not been examined in sufficient detail for their impact to be properly assessed, but it is certain that there is insufficient space for the level of cycle parking required. There appears to be no disabled access. We therefore object.
Created by Rohan Wilson // 1 thread
12/0342/FUL 12 cycle spaces indicated but space looks inadequate (no dimensions or layout shown)
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The site is on a local cycle link and thus it is reasonable, in the context of Cambridge, to anticipate a high proportion of parents and children arriving by bicycle. Indeed, bearing in mind the limited car parking available we would recommend that a travel plan strongly promoting cycle access for staff and users be required.
We object because we do not believe that the cycle parking space(s) allocated are consistent with the stated aim and the need to achieve high cycling levels. In particular, tagalongs, trailers and large carrier-bikes are likely to form a high proportion of customer cycles. The dimensions of the small, unsheltered enclosure (designed as a bin store in the current use of the site?) and a proposed layout are not given but look insufficient, and include a narrow entrance.
If cycles for say 30% of 18 customers, their children and 8 staff were to arrive by bike (say 3 staff, 6 adult customers and 8 children during a single class) then allowing a 50% margin for changeover between classes, space would be needed for a variety of types of bike and trailer to accommodate some 3 staff, 9 adult and 12 children customers.
This sort of calculation and the detail of the use of the cycle parking spaces do not seem to have been presented by the applicant, and should be required and assessed before the application is determined. We suggest that at least one car space would have to be used to accommodate sufficient cycles on this site.
Created by Gregory Williams // 1 thread
Proposed 20mph speed limit along School Road, Saltwood. The design involves removing the buildout at the Brockhill Road junction and installing overrunnable humped buildouts at regular intervals on alternate sides of School Road. "Gate" features with kerb buildouts to restrict the road width will denote the start and end of the 20mph zone.
Martin Lucas-Smith // 1 thread
The Penny Ferry Path (Halingway) entrance remains rather poor even after the changes a few years ago.
The application proposes to design a new lobby for this department and to relocate the cycle racks.
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
This application proposes to demolish every but the façade of 55-57 Regent Street and create a restaurant with 14 residential units
Martin Lucas-Smith // 1 thread
Cycling on Long Road can be pretty hazardous and unpleasant. There needs to be a lower speed limit (30mph) as a minimum.
Created by Gregory Williams // 1 thread
This portion of the cycle path near Reed Pond gets quite muddy on an annual basis. In the autumn / winter / spring it can sometimes be quite difficult to traverse.
Created by Gregory Williams // 1 thread
The gaps between the boards on the ramp connecting to the Weir Court cycle bridge mean that cyclists crossing the bridge could get their wheels caught in the gaps.
Created by Gregory Williams // 0 threads
A new playground is being proposed in the vicinity of Vauxhall Avenue. The playground is welcome, but it is important that its placement does not jeopardise the long-term ambition of a riverside cycle route.
Created by Gregory Williams // 1 thread
The cycle parking at the new Waitrose in Ashford is positioned such that some spaces are not available for use. One rack is too close to a bollard. Both racks are too close to each other.
Created by cobweb // 2 threads
Burwell is scheduled to be expanded by East Cambs and there are fears it might end up car centric.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
The wheeling ramps over the line to the new island platform are attracting some criticism.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Gregory Williams // 0 threads
Substantial development: 55 dwellings, 63000sqm business use, 2000sqm local centre.
Martin Lucas-Smith // 2 threads
Vehicles parking and driving in cycle lanes are a serious problem in Cambridge and beyond.
This is a master issue for discussions on this general problem.
(The Downing Street cycle lane has been shown as a key location where this is a problem, though the issue is city-wide.)
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by Sam Saunders // 0 threads
A twenty metre stretch of advisory cycle lane at the end of Whiteladies Road, from a zebra crossing to its junction with Queens Road, encourages cyclists to take a position near to the curb as they enter the and leave the junction. This puts them exposed to frequent buses turning immediately left into Queens Avenue and in a vulnerable position from which to continue a journey south west towards Park Street or Park Row.
Created by Paul L // 1 thread
This path is included in the Richmond Cycle Map and leads to a toucan and is a useful link from Hampton to the quietish Lower Hampton Rd towards Sunbury but is marked "No Cycling".
There is little pedestrian traffic but ideally it could be made wider.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by MB // 1 thread
TFL are thinkingof closing this 'rat run' to motor vehicles & have put out a consultation here:
https://consultations.tfl.gov.uk/streets/coleparkroad
They are keeping it open to cyclists - but are proposing (I think) an awkward right- angled turn for cyclists to get in & out of the cul-de-sac. Can we suggest a better layout?
Consultation closes on May 10th 2013
Created by Sam Saunders // 1 thread
Vauxhall Bridge between Coronation Road and Cumberland Road has a channel provided for wheeling bicycles on one side of its stepped sections. The channel is so narrow and so close to the railings that a bike can only be wheeled along it at a severe tilt. In addition only one side has a channel so wheeling the bike in the opposite direction has to be done from the wrong side of the bike, making it even more awkward.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Sam Saunders // 1 thread
The unusual arrangement at the beginning of this cycle lane in Dighton Street Bristol might lead some road users to take it lightly. It could be that experience of moving or replacing trees with less destructive varieties in suitable containers should be sought from other places. Dighton Street is part of a well-used natural route from east to west near the city centre and efforts to establish serious, continuous and high quality cycle routes on roads like this one could represent very good value for money. Mandatory cycle lanes, once installed, need to be policed.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Created by Sam Saunders // 1 thread
Cycling North along Westbury Road (A4018) on a shared-use pathway beside the main carriageway there is a sign to "Westbury Park Shops". It is about 50 yards before the Parry's Lane roundabout and indicates a right turn ahead for cyclists and pedestrians. It has been added to a larger sign that reads "New Road Layout".
In practice, on arrival at the roundabout there is no indication before, on or after the roundabout as to where cyclists should go next. A zebra crossing before the roundabout offers a dismounted route to the other side of the road, but there is no indication of which direction to take thereafter. There are 4 roads to chose from, Westbury Park, Etloe Road, North View and Downs Park West but none of them seem to offer shops. There are two ambiguous cycle lane markings on the entrance to Westbury Park and "NO CYCLING" is painted on one footpath.
The problem, in a nutshell, is one that recurs all over Bristol: if you don't already know the way a first encouraging sign gives expectations that are not followed through. A route that had been indicated as a cycle route (with the cycle symbol) at its origin is left to chance and guesswork. The effect on cycling is to increase uncertainty and unpredictability. Each cyclist is obliged to make guesses about how to use a junction or follow a route. An association of cycling with expert and arcane knowledge is reinforced. Many routes (including this one) could be improved with a few additional signs or road markings and their use by casual or less well-informed cyclists could be encouraged.
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?