Issues
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
-
-
20/01979/PRI03M - change of use, new dwelling
Prior approval for a change of use from Class A1 to Class C3 to become a dwelling. | 153 High Street Chesterton Cambridge CB4 1NL
-
20/01501/PRI0 30 - change of use - 68 new dwellings, Huntingdon Rd
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 68 dwellings. | National Institute Of Agricultural Botany Huntingdon Road Cambridge CB3 0LE
-
20/01426/FUL - 87 2 bed apartments, assisted-living, Maris Lane
Construction of 87 2bedroomed apartments, flanking a new public park to the south of Anstey Hall in order to provide assisted-living accommodation for people over 65. The Listed house will be adapted to serve as the central facilities for the retirement community. | Anstey Hall Maris Lane Cambridge Cambridgeshire CB2 9LG
-
20/01368/FUL - Two 2bed dwellings, Trefoil Terrace, Budleigh Close
Erection of 2no 2bed semi-detached dwellings with associated external works and drainage, with access via existing parking area at Trefoil Terrace. | Trefoil Terrace Budleigh Close Cambridge CB1 3BJ
-
20/01318/FUL - Three 3bed houses, Coldhams Lane
Demolition of existing single storey bungalow and erection of a terrace of 3no. 3bedroom houses along with new parking arrangements and associated works. | 248 Coldhams Lane Cambridge CB1 3HN
-
20/01101/FUL - Two dwellings, Marshall Rd
Subdivision of 1 Marshall Road, Cambridge to form two dwellings | 1 Marshall Road Cambridge CB1 7TY
-
20/01329/FUL - 9 person HMO, Mill Road
Change of use from staff accommodation to Large HMO (9 person). | Flat 111 - 113 Mill Road Cambridge Cambridgeshire CB1 2AZ
-
20/01847/PRI03O - 2 bed house plus study units, Newnham Rd
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 1no 2bedroom plus study unit. | 32 Newnham Road Cambridge CB3 9EY
-
20/01273/FUL - new 1 bed dwelling at 95 Cherry Hinton Rd
Erection of new one bedroom dwelling on land to the rear of 95 Cherry Hinton Road Cambridge Cambridgeshire CB1 7BS
-
20/01355/FUL - demolition & construction of 9 dwellings, Newmarket Rd
Application for demolition of existing and construction of 9 dwellings and associated external works.
P4 of Design and Access Statement states: 'Covered & secure cycle spaces are illustrated on the drawing and under current standard guidelines for new residences. They are generally near the entrances to each flat or available for visitors.'
However, 'Sheffield hoop under stair' is only indication I can see on site plan, so looks as though they are light on detail here and difficult to see if sufficient provision will be made for cycles.
Documents here:
-
Cycle contraflows in London Borough of Barnet
I have had an enquiry about cycle contraflows in the London Borough of Barnet. The only one I am aware of is in Church Lane in East Finchley. Is anyone aware of any others?
-
Coldhams Lane Roundabout
What can be done to make the Coldhams Lane roundabout safer for all road users?
-
Northern Gateway Proposals
Turnstone Estates is pleased to present updated plans for a state of the art leisure facility at the Northern Gateway, Colchester. We want the local community to be able to have their say in advance of a revised planning application being made to Colchester Borough Council. This is to ensure that local input can be fully considered and addressed prior to the submission of the updated application.
-
20/02072/PRI03O: Prior Approval notification. Change use offices to 33 dwellings
Prior Approval notification of proposed change of use from B1(a) (offices) to Class C3 (dwellinghouses) to create 2 studio apartments and 31 x 1bed units.
509 Coldhams Lane Cambridge CB1 3JS
Cambridge
Application reference : 20/02072/PRI03O
-
Layer Road Cycle Infrastructure Changes
Feedback provided to ECC Highways on poor quality cycle infrastructure added to Layer Road, Colchester in Q1 2020
-
Abolition of Cambridge Joint Area and Joint Development Control Committees
Constitution and Ethics Committee
Date/Time: 22 Apr 2020 - 14:00 to 16:00
Virtual Meeting
The County Council's Constitution and Ethics Committee is asked to recommend the changes to the County Council Constitution, as set out in the report, to full Council:
i) the abolition of the Economy and Environment and Highways and Infrastructure Committees;
ii) the introduction of the Environment and Sustainability and Highways and Transport Committees;
iii) revisions to the terms of reference of the General Purposes, Adults, Children and Young People, Commercial and Investment, Communities and Partnership and Health Committees;
iv) the abolition of the Cambridge Joint Area Committee by the end of July 2020 following the discussions set out in paragraph 3.3 of this report;
v) the withdrawal from the Joint Development Control Committee for Cambridge Fringes by the end of July 2020 following the discussions set out in paragraph 4.4 of this report; and
vi) increase the membership of General Purposes Committee from fifteen to seventeen.
-
20/01972/OUT Netherhall Gardens / Farm - up to 200 dwellings
Outline application (all matters reserved except for means of Access) for the erection of up to 200 residential dwellings, with associated infrastructure works, including access (vehicular, pedestrian and cycle), drainage, public open space and landscape.
Netherhall Farm Worts Causeway Cambridge CB1 8RJ
Cambridge
Application reference : 20/01972/OUT
-
Campaigning during the Coronavirus pandemic
Campaigning for cycling during the 2020 Coronavirus pandemic. What temporary changes should we campaign for? What longer-term changes should we be pushing for now?
-
20/01293/FUL - 6 new 1 bed flats, Cherry Hinton Road
Proposed conversion and extension of an existing HMO with one self contained flat into 6 x 1 bedroom self contained flats.
-
20/01261/FUL - extension & construction of new dwelling, Leete Road
First floor rear extension and demolition of outbuildings to the rear & construction of new 1 person single storey dwelling.
-
Upgraded cycleway from Cambourne to Cambridge, Cambridgeshire
Hardwick is seen as a commuter village for Cambridge but currently there are no cycle paths at all within the village, other than a 2 mile long on-road advisory shared with 40 mph traffic. There is also no cycle path north-south through the village - just over a mile. This is a village of around 1250 homes currently being extended to around 1500 but with little attention being paid to cycling yet.
In the S.106 Agreement for West Cambourne construction (2350 homes), SCDC Planning Reference S/2903/14/OL, Cambridge County Council have included an upgraded Cycle and footpath from West Cambourne to Cambridge passing through Hardwick. This can be seen in the S.106 Agreement Schedule 13 and is shown as Fully Funded in the current Cambridge County Council Transport Investment Plan, Scheme number 123.
Before construction of this goes ahead, will there be consultation with villages and residents along the route and do we have any indication of when this might commence? I note there should be plans available but these plans should be readable, clarified and modified with input from the villages on the route including Hardwick.
In the original plan submitted it seems the cycle paths proposed pass directly in front of 150 or so businesses and residential properties accesses and driveways which would seem to be entirely inappropriate for serious cycle-to-work opportunities.
This route appears to be independent from the Cambridge County Council "Greenways" initiative which also did not engage with Hardwick either
.
-
Contraflow on Park Terrace
The section of Park Terrace behind the hotel is wide enough for a cycle contraflow.
Although people can cycle in front of the pavilion, this is shared use and can be busy with pedestrians. It also means encountering traffic lights involving a wait unnecessarily.
Given that there is space, there seems no good reason not to provide a contraflow - in line with the principle that two-way cycling should be possible unless there is no space to do so.
-
Micromobility - Future of Transport Call for Evidence
A discussion about the Dept for Transport's new Call for Evidence about changing the law regarding e-scooters and other similar vehicles. https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/873363/future-of-transport-regulatory-review-call-for-evidence.pdf
-
20/01640/REM 286 No. dwellings, Cambourne
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/2903/14/OL for 286 No. dwellings including affordable housing, associated hard and soft landscaping and all ancillary works.
Parcels 1.3B, 1.3C, 1.3E, 1.4A And 1.4B Sheepfold Lane Cambourne Cambs CB23 6EA
Cambridge
Application reference : 20/01640/REM
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
-
AstraZeneca to move to Addenbrooke's site
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
-
More cycle parking needed near Clocktower Square area of Canterbury
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
-
More cycle parking needed near St. Margaret's Street / high street in Canterbury
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
-
Ramped access to Victoria Bridge from riverside path
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
-
Stall at Energise Cambridge
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
-
Poor road quality on Newmarket Road
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
-
A316 car park entrance
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
-
Richmond Circus Kew Road south toucan crossing
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
-
Lack of Cycle Parking Leeds City Centre
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
-
Extend Prom to Sea Lane
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
-
Cycle lanes stop for traffic islands through Trimley
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
-
Tuddenham Road cycle track stops abruptly with pavement
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
-
Cycle path too narrow, road space needs reallocating
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
-
Travis Perkins Development
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
-
Glebe Farm development
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
-
A316 Cycle Lane - Priority over side roads - Part2
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads -
Warwick Road Congestion
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
-
Pilgrim Street - close to motor traffic
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
-
A325/Union St. Roundabout - Redevelopment of Ham & Blackbird PH into 62 apartments and commercial space
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm. -
Quiet Routes into Central Richmond from Ham
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
-
Contraflow on Queen's Road
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
-
Consultation on Ashton Rd / Coronation Rd
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_viewSuggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing -
Link Staines Rd - Uxbrige Rd round golf course
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton. -
South Worple Way - obstruction
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
-
Sheen Rd / Upper Richmond Rd West - segregation needed
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.