Cambridge East development
The Cambridge East development is in the 2006 Cambridge Local Plan and would have a big effect on cycling and traffic more generally in the area.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 1 thread
The Cambridge East development is in the 2006 Cambridge Local Plan and would have a big effect on cycling and traffic more generally in the area.
Martin Lucas-Smith // 1 thread
The City Council will be designating Sheep's Green & Coe Fen as a local nature reserve in 2012, in recognition of the site’s value for both wildlife and recreation.
As part of the process, a management plan has been prepared to establish a long-term vision for the site and to guide ongoing maintenance and habitat-restoration works.
They are seeking public comments on the draft plan, prior to formal adoption and designation of the site.
It is important that the proposals are scrutinised to check whether this will have any effects in the longer term on cycling and path improvements.
Martin Lucas-Smith // 1 thread
Now that the East Road gas works have finished, the road has been patched up, but in a very bumpy way. Although the tarmac is smooth, it is not at the same height as the original road so riding along is continually bumpy.
Created by Rohan Wilson // 1 thread
A further application following several rejections.
Planning application to demolish 32-38 Station Road and build two office blocks. This is a revised application.
Application is called 'Fifty & Sixty Station Road'.
Documents are completely inadequate for this listed building. I submitted this objection:
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The application form indicates that there is currently no cycle parking and that none is intended. This is unacceptable - the development must conform to the Council's standards in quantity, location and type.
There are insufficient graphic details on which to assess the application.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We note that 3 Sheffield stands are shown within the cycle shelter - good provision for a site which is on the city's Signed Primary Cycle Network. It is important that they should not be installed too close to the rear wall, and that the spacing between each and between stands and side wall should meet the City Council's standards - see Cycle Parking Guide.
Only 3 bins are shown - is this acceptable, for recycling etc?
RW for Sustrans 3 May 2012
Objected.
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We are concerned that there may not be sufficient space in the rear "bikes and bins" (unattractive combination!) room. It is important that the Sheffield stands indicated should be installed as shown, and to park or remove a bike, rearward space is essential (See the City Council Cycle Parking Guide), adequate as drawn. But only five refuse bins are shown, one for each apartment. Normally each would need 3 bins (black, blue, green), for which there would clearly be insufficient space.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The documents state that cycle parking is to be increased to 4 spaces (staff) and 6 spaces (pupils), but gives no indication as to its type, location, or whether it is sheltered.
We consider the quantity to be provided seems unambitious, especially considering the site is in a quiet street close to routes on the city's signed primary cycle network. The cycle parking should be of Sheffield stands, convenient to the building's entrances, in a clearly visible location, and sheltered. See the City Council's Cycle Parking Guide for information.
We recommend that more spaces should also be provided, better to encourage a healthy alternative to car use. We note that the site is a listed building whose character and surroundings are not likely to be enhanced by full occupation of the "ample" car parking mentioned in the D+A Statement.
RW for Sustrans 3 May 2012
Created by Kevin Hickman // 0 threads
Poor provision for cycling in the submitted plans.
Created by David Earl // 1 thread
BBC R Cambs want to interview someone at 07.05 tomorrow (May 1) about the potholed condition of Mill Road.
Created by cobweb // 1 thread
Plans are mooted to paint directional signs on the roads in the city centre to alert bike users to the legal direction of travel.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Martin Lucas-Smith // 3 threads
Cambridge United are proposing a new stadium in Trumpington, near the Park and Ride site. Clearly this will have major traffic generation effects.
Created by David Earl // 1 thread
Construction of 136 residential units (class C3) with associated car parking and landscaping.
Martin Lucas-Smith // 2 threads
Mill Road suffers from a dreadful lack of cycle parking.
Coming from Oxford Street, trying to get to the coach stops is quite difficult.
Created by Jim Chisholm // 2 threads
For several years there have been proposals, counter proposals, and problems over access over partly Trinity College land that should give good cycle commuting routes from Bar Hill, Dry Drayton, Madingley and even Hardwick.
We need to work with NW Cambridge team at the University, Trinity College, Bidwells (Trinity's land agents), County, SCambs, and Local Parish Councils
If a solution can be found S106 monyey is available
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Martin Lucas-Smith // 1 thread
The speed limit here is currently 40mph.
Martin Lucas-Smith // 1 thread
The North West Cambridge site proposes traffic calming changes in Oxford Road and Windsor Road.
Proposals at:
http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=LRVINSDX01D00
then click on this second link:
http://idox.cambridge.gov.uk/online-applications/files/31B8D2EEB48A4F65255321E5DF860E38/pdf/11_1114_OUT-TRANSPORT_ASSESSMENT-857517.pdf
and scroll to numbered PDF page 26.
Created by Gregory Williams // 1 thread
A new Sainsburys supermarket is proposed at Westgate-on-Sea. The cycle infrastructure in this location is poor and this is an opportunity to help improve it.
Created by Shaun McDonald // 0 threads
Part of the TfL junction review http://tfl.gov.uk/junctionreview
11/0008/FUL was recently rejected by the Planning Committee but the club only have the lease till the end of the 2013 season having sold it to developers. It's likely some kind of development will occur on this site since the club needs the money.
The Old Press/Mill Lane supplementary development plan was adopted in 2010. Things have been quiet since then but the University still have plans to refresh this area. Part of the plan involves making Granta Place shared use.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.