Lane Closure on Hampstead Road
From March 24th through March 30th the northbound carriageway on Hampstead Road between Varndell Road and Granby Terrace will be closed.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Chamberlain // 1 thread
From March 24th through March 30th the northbound carriageway on Hampstead Road between Varndell Road and Granby Terrace will be closed.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00537/FUL | Demolition of existing dwelling and erection of five dwellings and associated landscaping | 29 High Street Chesterton Cambridge CB4 1NQ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00284/FUL | Erection of a detached building containing 1no. 2-bed and 1no. 1-bed duplex apartments, with associated car parking and landscaping | 1 Maitland Avenue Cambridge CB4 1TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00442/FUL | Two storey side and single storey front and rear extensions to create one, two bed flat and one, one bed flat | 5 Davy Road Cambridge CB1 3QW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00358/FUL | Refurbishment and extensions to the existing building to provide 2 no. commercial units (Use Class E) at ground floor with 6 no. flats to the rear and on the upper floors along with cycle parking, landscaping and associated infrastructure | 78-80 Cherry Hinton Road Cambridge CB1 7BH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00526/FUL | Retrospective for the existing rear L-shape extension and change of use of dwelling from small HMO C4 to large scale 8 no. person HMO (Sui Generis), including use of the existing rear L-shape extension. | 2 Galfrid Road Cambridge CB5 8ND
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00220/FUL | Construction of 1no. Detached 1 1/2 storey dwelling to the rear of no. 579 Newmarket Road | 579 Newmarket Road Cambridge CB5 8PA
Created by Steven Moseley // 1 thread
Demolition of dilapidated GP surgery building and replacing it with state of the art new medical centre with staff accommodation on first floor, parking, cycle and waste storage and ancillaries.
Created by Steven Moseley // 1 thread
Full planning application for a two-storey temporary school building (640m2) and single-storey admin block (66m2) for Trinity School at Gilberd School as part of Alpha Trust including minor alterations to landscaping + hard standing.
Created by Steven Moseley // 1 thread
The ABRO site (now called the DSG) forms part of the Defence Estate and was used as a military vehicle repair facility. The site was vacated in about 2019 and has not been used since that time. The Defence Estates have decided to dispose of the site as it is no longer required for military purposes.
Created by Stuart Johnson // 1 thread
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
Created by Steven Moseley // 1 thread
East Suffolk and North Essex NHS Foundation Trust (ESNEFT) are preparing two planning applications for a proposed Elective Orthopaedic Centre and Northern Approach Road access at Colchester Hospital, Turner Road, Colchester. The public is invited to comment on the development proposals in a consultation between 1 March and 12 March 2021.
The detailed elements of the works involved with the Elective Orthopaedic Centre comprise:
The detailed elements of the works involved with the Northern Approach Road access comprise:
The new Northern Approach Road access point is proposed to be located to the south‐western corner of the site, and will create a clearer, more legible and direct access for staff, patients and visitors from the strategic network in line with other local hospitals in Essex, and will provide improved highway safety and environmental benefits to residents residing along Turner Road, as well as encouraging improved sustainable travel behaviours.
More information on the plans can be downloaded here
Your views are very important to help us develop our proposals. Please use the SurveyMonkey comments form here, or alternatively email your response direct to Sam Hazell samhazell@lppartnership.co.uk
The consultation period will run from Monday 1 March 2021 until 5.00pm on Friday 12 March 2021.
Created by Steven Moseley // 1 thread
"When Colchester council approved the plan, in about 2007, it insisted that all private motor traffic enter and leave the estate via an access on to the A134 (Cordelia Drive), near to the A12 but at the farthest point from the town centre. ...
A year ago, the developers, Mersea Homes and Countryside, decided they didn't like this arrangement and applied to scrap the bus gate. They hedged their bets and also asked to move the bus gate into their estate, giving 160 homes access to Mile End Road.
Colchester council rejected the scrapping of the bus gate but granted a temporary access for five years to be covered by a legal agreement.
The developers decided to go to appeal." (blog)
Created by Stuart Johnson // 1 thread
The new shared path that runs parallel to Severalls Lane has obstructive chicane barriers and cyclist dismount signs where the path crosses the drive to Whitehouse Farm.
sound+fury // 1 thread
Created by Stuart Thomas // 1 thread
Barriers restrict access for people of all abilities, e.g. hand cycles, buggies for carers with disabled children, and for this that wish to cycle.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for erection of cycle shelter
93 Regent Street Cambridge CB2 1AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00188/FUL:
Erection of a two storey dwelling, with associated amenity space, parking, bin and cycle store following demolition of garage.
Land R/o 207 Cherry Hinton Road, Cambridge, CB1 7DA
Created by Diane // 1 thread
There is a proposal to build 35 new homes on Sandy Lane (described by the developers as 26 'family houses' and 9 'affordable homes').
The project has a website: https://yoursay.online/sandy-lane#about-the-project
At 6pm today (23rd February 2021) there will be webinar about the development (hosted by the developers).
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00264/FUL: Erection of two new buildings comprising Class E(g)i/E(g)ii floorspace including ancillary accommodation/ facilities with associated plant and cycle parking for Block F2 and an Aparthotel (Class C1) with multi-storey car park for Network Rail, including car and cycle parking, for Block B2 with associated plant, hard and soft landscaping and permanent access from Devonshire Road to the Cambridge Station Car Park, utilising the existing pedestrian and cycle access, restricted to emergency access to the railway only.
Blocks B2 & F2, Devonshire Quarter, Devonshire Road, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00038/FUL
Erection of new 2 bedroom 1.5 storey dwelling, associated works along with new parking/cycle parking following demolition of existing outbuildings
199-201 Cherry Hinton Road, Cambridge, CB1 7BX
Created by nix // 1 thread
The bike lanes across Marble Arch have long been chaotic and poorly marked. Confusion has been increased by the hurried COVID additions. I have found taking my 14 year old to practice learning to ride on North Carriage Drive scary.
I have heard our Chair despair on the subject before.
Specifically there are no clearly marked lanes on the Marble Arch island, through an area mobbed in Summer with visitors, and with a table tennis table on the intuitive route. But a chance has emerged - see below. Link via Westminster web-site to oxfordst@westminster.gov.uk.
Views are sought to "stakeholderteam@murphycareyjv.co.uk by Friday 19 February
sound+fury // 1 thread
New 2 bedroom house being built close to an existing property.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.