PA_212451_56MilRd
New studio dwelling
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Replacement of an existing building with a development of 3 no. self-contained flats
21 Sandy Lane Cambridge Cambridgeshire CB4 1HZ
Cambridge
Application reference : 21/04212/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 3 dwellings along with off street parking, private amenity space, cycle parking/ storage and refuse storage, demolition of existing rear garage lean-to and reconfiguration of the pavement along Stanesfield Road
Land Adjacent To 25 Rawlyn Road Cambridge Cambridgeshire CB5 8NL
Cambridge
Application reference : 21/04190/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion and extension to provide seven flats
3-4 Market Hill Cambridge CB2 3NJ
Cambridge
Application reference : 21/04188/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Part demolition of outbuildings, erection of single storey annexe and change of use to 6 bed HMO (Sui Generis) for 6 persons
7 Kent Way Cambridge CB4 2QY
Cambridge
Application reference : 21/03983/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 2 no. 2 bed flats with associated bin and cycle stores
Land Adjacent King Hedges Road Cambridge Cambridgeshire
Cambridge
Application reference : 21/03991/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to 11bed HMO for 11 persons (sui generis).
157 Shelford Road Cambridge CB2 9ND
Cambridge
Application reference : 21/03899/FUL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03821/FUL | Extensions and alterations to pair of semi-detached dwellings to create 6x new apartments and 1x detached one bedroom unit. Improvements to front boundary wall and front garden area, including off road parking for 2 vehicles retained and bins and cycle store provided.
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of 6no. dwellings together with access, car parking, bin and bikes stores, landscaping and associated infrastructure
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 7 apartments comprising 1 x 2-bed and 6 x 1-bed units, including bin and cycle storage facilities, together with reconfiguring the pedestrian access to 56A and 58A Cherry Hinton Road and installation of a new ground floor rear wall to the retained retail unit at 56-58 Cherry Hinton Road, following demolition of existing warehouse building
Poor links from Eight Ash Green to Stanway, due to lack of cycling provision on the A1124, and lack of cycle crossing across London Rd.
Created by Steven Moseley // 1 thread
Conversion of existing 6 bed HMO (C4) into 9no. bedroom House in Multiple Occupation (HMO) for up to 9 people (Sui Generis) including the single story rear and side extensions approved under App Ref No's 211168 and 211243.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03437/FUL | Division of existing property into 4 no. 1 bedroom Flats including the construction of a single storey rear extension, two storey side extension and partial first floor extension. | 136 Mowbray Road Cambridge CB1 7TG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03508/FUL | Erection of 2 No. dwellinghouses together with associated access and landscaping works | Land To The Rear Of 368-370 Milton Road Cambridge Cambridgeshire CB4 1SU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03538/CL2PD | Certificate of lawfulness under Section 192 for a change of use of Unit 8 from Dwellinghouse (Class C3) to House in Multiple Occupation (HMO ( 6 bed )) (Class C4), retention of Unit 8A as a separated unit used as a Studio Flat and minor internal layout alterations. | 8 Oak Tree Avenue Cambridge CB4 1BA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03467/FUL | Construction of 4no, 1bed flats and associated external works to rear. |
17 - 19 Radegund Road Cambridge Cambridgeshire CB1 3RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03439/FUL | Erection of 3 No. 1 bedroom duplex dwellings with associated landscaping, parking, bin and cycle storage. |
Land Adjacent To 22 Mill End Close Cambridge Cambridgeshire CB1 9HS
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/03498/FUL | Demolition of existing garages and area of hardstanding and erection of 3 No. dwellings together with car parking, landscaping, bin and bike stores and associated infrastructure.
Land At Borrowdale Cambridge Cambridgeshire CB4 3HU
Created by catch // 0 threads
Proposal for new traffic-free routes using mostly existing footpaths/tracks from Cymbeline way opposite Sheepen Rd. to West Bergholt.
Created by Jean Dollimore // 1 thread
Camden is consulting on some proposed improvements for walking and cycling through the junction of Abbey Road and Belsize Road
Created by Steven Moseley // 1 thread
Erection of 4 detached dwellings, access road, new woodland plantation and additional landscaping.
Created by Steven Moseley // 1 thread
Full planning permission for the development of the site to provide 144 new residential units (including affordable homes) with associatedon-site electricity and drainage infrastructure, open space, landscaping, access roads, parking and turning areas,
Created by cpax // 1 thread
. I regularly have to use this mini roundabout ( 3 times a week )and when approaching from Fulbourn I find that drivers are increasingly
ignoring the give-way to traffic coming from the right rule and as I brake they then drive up the cycle route .
Created by Jean Dollimore // 1 thread
Camden Council installed Pop-up cycle lanes on Chalk Farm Road and the lower end of Haverstock Hill last summer. They are now consulting on proposals to make these and associated changes permanent.
The proposals include:
Drop In Sessions
23 September 2021 (Thursday) from 16:00 to 19:00
30 September 2021 (Thursday) from 16:00 to 19:00
Location: Castlehaven Community Centre, 23 Castlehaven Rd, London NW1 8RU
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.