About page on CCC web site
Final version at https://www.ensembling.com/68508
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Hall // 0 threads
Final version at https://www.ensembling.com/68508
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Gregory Williams // 1 thread
The cycle route warning signs on lighting columns QAD014 and QAD011 haven't been reinstated following the replacement of lampposts in Queens Avenue. These Google StreetView images show them on the old lampposts:
http://goo.gl/maps/QDqt8
http://goo.gl/maps/KNzNY
The signs should be reinstated to ensure that other road users are aware that they should expect to see cyclists emerging from the section of cycle path adjoining Queens Avenue.
Created by Shaun McDonald // 1 thread
There is a new something being installed in the middle of a shared cycle pavement (see photo), yet there is already limited space, especially at peak times.
South Glos Council have published a consultation for extending the cyclepath from Emersons Green to Yate - the Yate Spur
https://consultations.southglos.gov.uk/consult.ti/YateSpurWesterleighRd/consultationHome
Funding has been secured through the Local Sustainable Transport Fund to deliver elements of the Yate Spur cycle path. When complete, the route will connect the Bristol to Bath Railway path with Yate.
The proposed road crossing will provide an informal crossing facility at Westerleigh Road for cyclists, walkers and horse riders using the Yate Spur Cycle Path and Fishing Lakes Link.
At the lower end of the cycle path that runs from Church Lane, up Madley Brook to Madley Park, is a bridge set at a weirdly sharp angle to everything else.
Coming from Church Lane, it is immediately after a blind corner, requiring a sharp right turn; then the bridge requires a sharp left turn. At this very point, before the wood of the bridge, the road surface is uneven and has collapsed.
While the cycle path apparently has to briefly join the footpath - no permission given for a way through on the south side of Madley Brook? - it does so in a very dangerous way, which is difficult even for experienced cyclists to negotiate, and provides no visibility of other route users including pedestrians.
When it rains, Skippet Lane between Ramsden and Finstock fills with gravel, soil and other associated rubble. It has collected at the bottom of the hill, and is particularly hazardous on the left-hand bend there.
This road - a useful route for cyclists wanting to avoid the main Witney-Charlbury B road - needs regular checking and clearing of detritus, as it has been like this now for at least a year.
Created by Gregory Williams // 1 thread
Parking over the shared cycle / foot path appears to be a routine occurrence in the Bluebell Road / Orchid Court / Poppy Mead area of Park Farm. This makes the path difficult to use as a cyclist.
Created by Gregory Williams // 1 thread
Inconsistent and incorrect No Cycling signs exist at the Sheepfold Lane end of the Great Oak Row cycle / foot path. Cycling is permitted here, as can be seen from the cycle symbol on the ground. These signs should be replaced with shared-use cycle / foot path signs to avoid causing confusion.
Created by Gregory Williams // 1 thread
A lamppost is positioned in the way of a cycle path beside Bluebell Road at its junction with Sheepfold Lane. It is particularly hazardous if cycling along Bluebell Road west-to-east and then transitioning onto the cycle path beside Sheepfold Lane just before the road junction.
Created by Gregory Williams // 0 threads
There is no cycle parking at Chilham railway station, thus discouraging people to cycle to the station. The photo shows that there is plenty of room on the platform for a few stands to be installed.
Created by Gregory Williams // 1 thread
Chilham village is currently somewhat isolated from the cycle network by the busy A28 and A252 roads. It should be linked to the NCR18 route being developed linking Chartham and Godmersham.
Created by velocipedus@gmail.com // 1 thread
This issue offers resources for a dialogue with motorist, through the media, through their organisations, etc.
http://camcycle.cyclescape.org/issues/67 already offers some threads on taxi drivers (could be united)
Created by David Wilcox // 0 threads
This is a busy rat run and a bus route! As evidenced by the google street view, a pedestrian desire line runs through from Butterfield Road to Bishop Manor Road. The consultation is at: https://www.citizenspace.com/bristol/city-development/bishopthorpe
Pavement Parking is the issue here, blocking sight lines. The proposed road markings and build outs will help. If they are enforced.
As specified in the website below there is a consultation on Satchfield Close in Henbury Bristol.
https://www.citizenspace.com/bristol/city-development/satchfieldclose
Looks like parking is a problem for the locals as they can't seem to drive a car onto their driveways.
The council is keeping the large tree in the scheme and hopefully it will stop the inhabitant's from parking on the pavement.
Created by Gregory Williams // 1 thread
The Conningbrook Lakes development proposes 300 dwellings together with the creation of a country park and water sports facilities. The development offers the opportunity to improve the alignment of NCR18 by making it shorter and removing the blind junction at Blackwall Road North / Willesborough Road and the uncontrolled crossing of the A2070 near Premier Foods.
Created by Chris Howell // 1 thread
http://www.cambridge-news.co.uk/News/Future-of-two-more-pubs-hangs-in-balance-02012013.htm
Comment from highways:
"The application claims provision of 24 cycle parking spaces; however I am unable to locate the proposed spaces on the plans. Please require the applicant to show the proposed parking provision, with dimensions on the plans and submit same for comment by the Highway Authority prior to determination of this application."
I looked round this site when it was for sale - the building occupies almost the entire plot - I can't imagine how they would get 24 cycle parking spaces on site (let alone with bin storage as well). Highways point definitely needs addressing.
Closing date for comments 8th Jan.
Created by Gregory Williams // 1 thread
The cycle filter lane markings on South Canterbury Road for the right turn into Stuppington Lane need to be refreshed. The cycle lane markings in Stuppington Lane also need to be refreshed. These markings make it clear to drivers that they should expect to encounter cyclists here and should adapt their driving accordingly.
Created by cobweb // 1 thread
Flagging this up as the city's cycle parking standards basically say racks are provided on merit for hospitals so it could be useful to check what they're offering.
Created by velocipedus@gmail.com // 9 threads
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
Created by cobweb // 1 thread
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
Created by Gregory Williams // 1 thread
Both ends of the new cycle path between George Roche Road and Stuppington Lane in Canterbury do not have properly dropped kerbs. This makes joining / leaving the cycle path dangerous. Properly dropped kerbs should be installed.
Additionally the visibility to the SW at the junction with Stuppington Lane is poor due to a hedge immediately adjacent to the junction. The sightline needs to be improved here, since road users approaching from the SW will not be able to see cyclists and pedestrians about to emerge from the path. Likewise cyclists and pedestrians turning into the path will not be able to see anybody else on the path that's approaching the junction.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul Bearpark // 1 thread
Objections to U&Cs outline planning application need to be submitted by 10 April. There seem to be some interesting ideas for improving cycling infrastructure but a lot that could be improved upon.
Created by User 2125 (deleted) // 1 thread
The shared access path on Colne road, on its north side, creates conflict between cycles and vehicles. The provision seems worse than using the road. The presence of commercial premises on both sides of this road make the use of a shared access path highly problematic.
More photos can be found on the campaign blog.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by FrenchyF // 0 threads
The bike lane here starts too close to the junction - drivers hug the kerb before the cycle lane starts, and this makes the lane useless.
Created by Jim Chisholm // 1 thread
A driverless pod system is proposed is proposed to connect CBC and Trumpington P&R.
see:
http://www.cambridgeindependent.co.uk/news/cambridge/innovate-uk-have-put-up-250-000-to-get-two-cambridge-medical-campuses-serviced-by-driverless-buses-1-4993867
It 'implies' it will use maintenance-track!
"An out-of-hours driverless shuttle service on the fixed path from Trumpington Park and Ride will aim to allevieate congestion on the Cambridge Biomedical Campus."
We need to find out more.
A similar system is proposed to connect Whittlesford station and Genome Campus. This should offer possibilites for a new walking and cycling route.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by jpennycook // 1 thread
Brighton Hill Community Planning Group is consulting:-
Now consulting!
Brighton Hill Community Planning Group
If you live work or volunteer in Brighton Hill please let us know your views.
Complete the survey (https://www.snapsurveys.com/wh/s.asp?k=149700756001)
The consultation will close on 14 August 2017.
Created by Rob Earl // 0 threads
Better access to NEPN than through St Mark's Park which involves an uphill, narrowing road approaching a blind bridge. Requires stopping in traffic to negotiate parked cars and kerb.
Created by Rob Earl // 0 threads
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by Stephan Matthiesen // 1 thread
The path between Hyvot Loan and Guardwell Glen has two narrow chicanes at both ends, which are quite overgrown too.
This path is important as it allows people to leave the quiet route northwards towards Ellens Glen, so you can avoid parts of the busy Gilmerton Rd.
I contacted the Active Travel team about it and they are going to look at it. There is some uncertainty if this is owned by the Morrison supermarket or the council. The chicanes were put in after local complaints about motorbike, so the Active Travel team has to investigate if this is still a concern.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
The timing of the signals at the Ferniehill Road junction could also be changed. Currently, you need to use three separate pelican crossings to get from one side of the road to the other, and this can take several minutes.
Created by FrenchyF // 1 thread
The road markings at the junction between Old Dalkeith Road and Little France Cottages should be repainted. Adding a bike lane would also be an improvement.
Created by FrenchyF // 1 thread
Just south of Little France Road, the southbound bike lane on Old Dalkeith Road is appalling. It's alongside a parking bay, but the parking bay isn't wide enough for cars to fit into it without them sticking into the bike lane. Even if it was, "dooring" would still be a significant hazard.
Even away from the parking bay, the bike lane is too narrow.
The bike lane really needs to be wider and further away from parked cars. If this isn't possible, I think it would be better to have no cycle lane at all.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Rob Earl // 1 thread
Access to QR10 from Fillyside Road requires either:
- Cycle across busy/fast road and up full height kerb
- Turn right onto busy/fast road for ~100m, turn left up dropped (but not flush) kerb
- Cycle on pavement and cross at traffic island
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Kokomo // 0 threads
usually have to wait a very long time here - reduce the wait time after pushing the button! This crossing needs to be more responsive like the one round the corner on Clerk St.
This small change will make a big difference to this route to the Innocent Path
Created by jpennycook // 1 thread
Outline planning application for the erection of up to 95 dwellings with public open space, landscaping and sustainable drainage system (SuDS). Demolition of garages to form a vehicular access point from Bow Drive and replacement garaging. All matters reserved except for means of access
Land At Goddards Farm Goddards Lane Sherfield-on-Loddon Hampshire
"Whilst there are no cycle routes currently in the vicinity of the site, the topography of the
surrounding roads make them generally conducive to encourage cycling. These provide
connections for cyclist from the development site to the wider area."
Basingstoke
Application reference : 17/02190/OUT
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by acsimpson // 0 threads
There is a gate across the full width of the national cycle network just west of the Railway line past Dalmeny. This forces all path users to use the uneven verge which can get very muddy at certain times of year.