Newmarket Road/Elizabeth Way roundabout
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
sound+fury // 1 thread
This is a large roundabout, with a unsatisfactory underpass, that is in need of a total reconfiguration, ideally involving its removal.
sound+fury // 0 threads
The pavement here is narrow. Is there a way of improving the environment for walking and cycling at the same time?
sound+fury // 0 threads
Traffic signals hold up not just vehicles but bike riders too. This should change with consideration given to walkers as well.
Created by Jean Dollimore // 1 thread
Due to the expansion of Euston Station to accommodate HS2. residential parking has been reduced around Euston Station, which has triggered a review of provision in the CA-G CPZ.
sound+fury // 0 threads
Several bikes fly parked in this area, showing that bike racks would be welcome. (Reported originally on Twitter by Alex Raha (@Rahario)
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by Roxanne (CEO) // 1 thread
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/0202/17/OL for the development of 110 dwellings with areas of landscaping and public open space and associated infrastructure works The outline was screened and confirmed not too be EIA development
Land east of Teversham Road, Fulbourn, Cambs
South Cambridgeshire
Application reference : S/3290/19/RM
Created by Roxanne (CEO) // 1 thread
Development of retirement care village in class C2 comprising housing with care, communal health , wellbeing and leisure facilities, public space , landscaping, car parking, access and associated development
Land Rear Of 163 To 187 High Street Bottisham
East Cambridgeshire
Application reference : 20/00296/OUM
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by David Earl // 1 thread
The cycleway has a sever problem with tree-root damage. The largest fault is a sharp triangular profile about 10cm high. This has been reported to CambsCC six times according to their fault reporting, starting two years ago, including one person who came off their bike beacause of it. I reported it in September 2018. Nothing whatsoever has been done about it.
I wrote to my county councillor (John Williams, in whose division this also lies) about the failure to act in January. He did not reply. I have written again today.
Yesterday, I was thrown off my bike by my pedal catching the largest upstand. Fortunately the only damage was a sore knee for a few hours.
I have now made a formal complaint of negligence to the Counmty Council. They have had two years and a report of injury, but have failed to act.
Created by David Earl // 1 thread
The chain-link fencing on the south side of the path on the west ramp off the Tins rail bridge is badly bowed out into the path. This is at face level and could take someone's eye out: it is dangerous.
There was already a report on county HIghways for this, which was dismissed as "landowner responsibility", which may be network rail or may be the chalk pits land. There was no indication in the closed issue whether they had actually informed the landowner, so I reported it again today.
Local Plan for LBRUT is being revised to line up better with Mayor and local policy
Martin Lucas-Smith // 1 thread
This is a hostile roundabout. It has been fiddled around with over the years, to add advisory cycle lanes, lights, pedestrian crossings, etc.
The area needs a fundamental redesign, to replace the roundabout probably with a protected intersection design.
It is outrageous that a health site such as Addenbrooke's has such an unsafe and anti-cycling junction as its main entrance.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Martin Lucas-Smith // 0 threads
Now that the residents' parking scheme is in place, it is clear that there are many more spaces provided than are actually in use.
The amount of space should be slimmed down ASAP.
In particular, the area round the exit from the cut-through from Clifton Road desperately needs to have the parking removed year, to make the visibility much better. A couple of vehicles park there, yet they could easily park 20m away in one of the now empty bays.
Station Road has a bit of cycle lane provision, but it is spotty.
There should be cycle lanes on both sides of the road, the full length.
Taxis should have to queue in the station area car park itself, not 250m away on Station Road.
The streetscape along Riverside was upgraded several years ago at the town end. But it then stops.
It should be completed, all the way to Stourbridge Common.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
Martin Lucas-Smith // 0 threads
Maid's Causeway and the town side of Newmarket Road (until the roundabout) is a mish-mash of a few bits of cycle lane. This is a wide road.
This should be changed to proper cycle tracks. This can be done without moving pavements.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 0 threads
Gonville Place at the Mill Road end needs queue-busting cycle lanes, as per East Road.
As the image shows, there is plenty of space here.
The Hills Road end goes to three lanes so that would be more difficult. The Mill Road end is much easier and can be regarded as a simple 'quick win'.
Martin Lucas-Smith // 0 threads
Like many areas of Petersfield, Ainsworth Street has no cycle parking but there are bikes left along the pavements.
Cycle parking should be provided.
Every night, and during the day, there are always at least some spots of car parking unused. Therefore there is scope to remove a few spaces and install residential cycle parking, as per Thoday Street.
Martin Lucas-Smith // 0 threads
Kingston Street has a major problem with pavement parking.
Bizarrely the yellow line restriction on the east side (nearest the railway) allows parking on that side of the road during certain times, but that is not possible to do without either blocking the road or parking on the pavement.
Current restrictions are Monday-Saturday, 8.30am-5.30pm. This should be double yellow lines (24 hours). That would still permit deliveries.
Created by Jean Dollimore // 1 thread
Camden Council wants to improve the Kentish Town area, including improving air quality and making walking and cycling easier and safer. The area included is shown on the attached map on which we have added blue lines to show the links in the Camden cycle network in this area. See map image with the Issue.
Camden has already been engaging with stakeholders at meetings and with local people via the Commonplace engagement map (see link).
Created by Steven Moseley // 1 thread
This developer [1] has put up this barrier in a shared use path important to local cyclists (c.f. the Campaign's original objections), apparently following complaints that the path was being used as a “cut through” by motor cyclists.
Clearly, this constitutes a real problem for cyclists and wheelchair users.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by kirbyjames // 2 threads
The primary route between Crediton and Exeter is the narrow and busy A377. It has been the site of at least one cycling fatality near Newton St Cyres.
An alternative route is possible using the lanes north of the A377 through Sweetham. However this route is compromised at both ends - at Exeter in the Cowley Bridge area and in Crediton by the approach along the A3072.
Development of a safe route is belived to be of high priority.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.