23/03273/FUL and 23/03273/COND7 east of NMR P&R
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by KW // 1 thread
Don't know why we didn't see 23/03273/FUL (decided, with conditions) but there is now 23/03273/COND7 re staff cycle parking to consider.
Full:
Cond7:
Created by Gregory Williams // 2 threads
There isn't a dropped kerb at the northern end of the Legacy Park cycle path where it meets Chaucer Road. Therefore cyclists can't easily transition between the cycle path and the road here.
Created by Gregory Williams // 1 thread
The signs at the junction between Mill Lane and St. Radigund's Street in Canterbury have gone missing.
The new shared-use path here is lovely except they've installed corduroy paving, with the very narrow bumps, on the newest stretch, to indicate the cycling and pedestrian halves, instead of the usual fat textured paving. Last week in the bad weather it caught my wheel and I skidded on it, only just avoided coming off completely. I couldn't get a photo because it was after dark, but you know the paving I mean. It's not suitable for cycle paths under any circumstances and I don't know why they've used it here. The section they installed previously, along Gregory Park up to the back entrance of the P&R, has the correct paving.
sound+fury // 1 thread
No cycle parking shown in the plans
Created by Martin Wheatley // 1 thread
How exactly more secure cycle parking will work.
Created by Gregory Williams // 1 thread
The cover has gone from the cycle parking opposite B&M Home Store, leaving cycles more exposed to the weather.
Created by Gregory Williams // 1 thread
Each winter the Crab & Winkle Way gets a puddle across the full width of the route a little south of Tyler Hill Road. This can freeze over as ice and mask potholes in the surface beneath.
Created by Josh Grantham // 1 thread
Erection of new office building (use class E) and associated development, infrastructure and works.
Application reference : 23/04840/FUL
Created by KW // 1 thread
23/04936/FUL | Full planning application for the construction of 91 new homes with associated infrastructure, internal roads, open space as part of phase 3 within the Marleigh development as a modification to outline permission S/2682/13/OL to increase the overall unit numbers across the site to 1,391 homes. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by KW // 1 thread
23/04930/REM | Reserved matters application detailing, appearance, landscaping, layout and scale for the construction of 332 new homes and commercial space with associated infrastructure, internal roads, open space as part of phase 3 pursuant to condition 5 (reserved matter) of outline permission S/2682/13/OL dated 30 November 2016. | Marleigh Phase 3 Land North Of Newmarket Road Cambridge CB5 8AA
Created by Gregory Williams // 1 thread
A tree has fallen blocking NCR1 at Duke's Meadow. In the meantime it is still possible to cut across the grass to continue the route.
23/04590/OUT Latest in a long sequence of attempts to develop landfill and 'lakes' either side of The Tins path.
Tom McKeown // 1 thread
First and second floor extension above the existing ground floor commercial Business and Service premises (Use Class E) and Library (Use Class F1(d)) to create 15 No. residential apartments including a communal terrace, together with an associated communal entrance/service building (including first and second floor commercial units (Use Class E)), cycle parking, refuse provision, landscaping, the reconfiguration of the established car park, substation and associated infrastructure works.
Land Adjacent To School Hill Histon Cambridgeshire CB24 9JE
South Cambridgeshire
Application reference : 23/04537/FUL
Created by Edward Bainton // 1 thread
Crossing from Bright Street to Geneva Street, the cycle lights do not sense the bike. You can sit through 10 phases and you never get a green light.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by Isaac // 1 thread
Recent roadworks have left the cycle lane entering Cambridge in an unusable state. There are large bumps across the width of the cycle lane which makes cycling along it dangerous. Needs to be fixed asap.
Erection of 12 dwellings, including 3 affordable dwellings, and associated works including alterations to access to the site and creation of second access.
Land At Ditton Walk Cambridge Cambridgeshire
Cambridge
Application reference : 23/04380/FUL
Not shown in the plans, but suggested in the D&A: a pedestrian link between Ditton Walk and the Trail
Created by Campbell Mccaig // 1 thread
A real lack of strimming too making some paths nearly unuseable.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for the 2024 AGM are well-underway!
Please join us on Saturday 20 January, 2-5pm at Storey's Field Centre (main hall).
Created by Gregory Williams // 1 thread
The River Dour Greenway sign pointing into Lorne Road from the shared path beside Buckland Avenue is missing. Previous Google StreetView imagery shows the sign which has gone missing:
Created by Gregory Williams // 1 thread
Bollards on the path used by the River Dour Greenway between Alfred Road and Brookfield Place limit access for people with trailers or on tandems.
Created by Martin Wheatley // 1 thread
Absolutely disgraceful deposit of mud by tractor drivers hauling harvested beets on Fen Lane (the back way to the north of Swaffham Bulbeck which many of us use to bypass the unpleasant B1102 through the village). In my opinion it is not currently safely passable on a bike. I was on foot, in wellingtons, and found it hard to stay upright. The number of tractors and the aggressive speed at which they are being driven is an additional hazard. Until this is cleared up, the options are the main road through the village, or (somewhat longer but much less busy), divert via High Street, Quarry Lane and Heath Road back on to the B1102 and the Greenway to Swaffham Prior north of the village.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream