210797 Headgate Building
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Steven Moseley // 1 thread
Change of use from D1 (Clinic) to residential (9no. apartments). Minor elevational change to 52 St Johns Street and part change of use to ancillary use with residential conversion.
Created by Roxanne (CEO) // 1 thread
How should the junction with Glisson Road and Hills Road be improved to improve safety for people cycling, walking and driving?
Created by Edward Taylor // 1 thread
This is an ideal solution to the flow at Landbeach road.
Mobility needs from Landbeach, highlighted in Milton community are to provide cycle crossing at the A10 for school kids and parents.
Created by Dominic Fee // 1 thread
Westminster City Council made an experimental traffic order on 8 February 2021, which will have effects including to:
"(a) prohibit all vehicles from entering or proceeding in Vigo Street, between Savile Row and Sackville Street (except pedal cycles which will be able to travel in both directions);
(b) introduce one-way working south-westbound in Burlington Gardens, between Savile Row and Cork Street (except pedal cycles);
(c) reverse the one-way working in Sackville Street so that it applies in a northwestbound direction"
Created by Steven Moseley // 1 thread
Opening in Spring 2021, the Northern Gateway Sports Park is a 76 acre site providing both indoor and outdoor sport and leisure activities.
Created by Steven Moseley // 1 thread
Alterations to car park with the erection of a freestanding restaurant with drive-thru facility, car parking, landscaping and associated works, including Customer Order Displays (COD), Goal Post Height Restrictor and Play Frame.
Created by Steven Moseley // 2 threads
The scheme will see the replacement of the double roundabouts located at Ipswich Road and Harwich Road with a single roundabout at each location. The carriageway between Ipswich Road and Harwich Road junctions will also be widened to accommodate two formal lanes in each direction. The scheme will include upgrading existing pedestrian crossings to signal controlled crossings and general improvements to the current off-carriageway cycle and footway provisions.
The scheme will improve the performance of these two key intersections on the A133 and renewal of the infrastructure will reduce maintenance costs. It will also improve the existing highway assets including the strengthening of two retaining walls, one between Ipswich Road roundabout and the adjoining railway line and another between Ipswich Road roundabout and the Waitrose Car Park. The Scheme has also supported the Cowdray Bridge refurbishment, now being progressed separately through the structures capital maintenance programme.
cyclescape user // 0 threads
The current hardcore path is often not usable for walking / cycling during wet weather. The path is difficult to pass through due to water on the surface. A new tarmac option would be much better. A new drop kerb on Bell Court and widened access would also help improve this route. Note the path gives access to a local football pitch as well as a local park. Cycling and walking in the area would increase if this issue was fixed.
sound+fury // 1 thread
Proposal to demolish a couple of houses on Brooklands Avenue.
Created by Steven Moseley // 1 thread
Application for approval of reserved matters following outline approval 121272 for the construction of 201 dwellings.
Parcels R01, R02 & R03, G1, G3, G4 And Osf1 North Colchester Urban Ext, Mile End Road, Colchester
Created by Steven Moseley // 1 thread
Application for approval of details reserved by conditions 5, 15, 16, 17, 19, 20, 21, 22 & 23 of 193133 (Phasing, CMS, Remediation, levels, finishes, landscaping, cycles, loading.)
Created by Steven Moseley // 1 thread
Application to determine if prior approval is required for a proposed change of use from Offices (Class B1(a)) to 10no. dwellinghouses (Class C3)
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Extensions and internal alterations to create 7 no. new apartments including new detached 1 bedroom unit in rear curtlilage with off road parking for 2 vehicles and bins and cycle store
87 Perne Road Cambridge CB1 3SB
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Request for a formal scoping opinion for development at Land South Of Coldhams Lane, Cambridge
Land South Of Coldhams Lane Cambridge Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing structures, erection of new building containing nine self-contained residential units, with associated parking, hard and soft landscaping works, and associated works and infrastructure
509 Coldhams Lane Cambridge CB1 3JS
Created by John Chamberlain // 1 thread
Eastbound Cycle Lane on Tavistock Place closed for 2 weeks
Created by Roxanne (CEO) // 1 thread
How can cycling on Trumpington Road be improved, especially to make it safe for people cycling to local schools?
Created by Alex Jenkins // 1 thread
The Council is committed to supporting Brick Lane’s recovery from the Covid-19 pandemic and wants to use the investment of the Liveable Streets programme to support Brick Lane businesses and the local community in months and years ahead.
Future Visualisation of Brick Lane(External link)
These proposals have been developed on feedback based on residents, businesses and local community. We are consulting on these proposals now, so that if they are supported we can implement them in time for Summer to benefit businesses, the local community and visitors.
Our proposals:
What is being proposed?
Three schemes have been developed to improve walking and cycling, create better public spaces, discourage through-traffic and improve air quality (click on each scheme to view details):
Our proposals include environmental enhancements and traffic calming measures to improve accessibility and safety for all and to encourage active travel.
Why are these proposals important?
Brick Lane is an iconic area of London that attracts over 18,500 pedestrians every day. This space is also shared with over 4,000 vehicles, many of which use Brick Lane to cut through the area. This means they are not visiting local businesses, schools or places of worship but are significant contributors to the already unacceptable levels of air pollution and congestion along Brick Lane.
School streets are central to our Brick Lane proposals to address key safety and air quality issues. Our initiatives will create accessible and safer school travel routes by reducing the number of cars polluting the school environment and improving road safety for children.
These proposals are a key part of Tower Hamlets commitment to support Brick Lane’s economic recovery from the Covid-19 pandemic and aims to attract more visitors to the area and support businesses to trade safely.
Overview of Brick Lane Proposals
Overview plan of all proposed works in the Brick Lane area. Please click to enlarge(External link)
Have your say
Your views on our Brick Lane proposals are important to us. You can have your say by providing your feedback through our online survey.
If you have any issues or questions you can either leave a question via our Q&A tool or alternatively email liveablestreets@towerhamlets.gov.uk(External link)
If you would like to raise any questions in Bengali or request a translated copy of the consultation booklet in Bengali then please fill out the request form here.
The consultation is open from Wednesday 17th March and closes at 11:59 on Wednesday 14 April 2021.
Coronavirus update
Our Liveable Streets programme team are following government advice and are currently working remotely. Work will continue as planned on the projects and the team will adhere to all guidelines.
Please note that construction timing is subject to change depending on changes to coronavirus restrictions, weather and coordination of works in the area. We will update the website with any changes to the programme and hope you will continue to help us improve the look and feel of your neighbourhood.
For coronavirus updates from Tower Hamlets or to join our mailing list please click here(External link).
If you have any questions regarding the construction phase please see below, or get in touch with the team by emailing LiveableStreets@towerhamlets.gov.uk(External link) or calling 0203 092 0401.
Created by Richard Ollerenshaw // 1 thread
Row of parked cars on busy road requires vehicles to overtake into oncoming traffic. Cyclists repeatedly forced into gutter at this location by oncoming vehicles.
Created by Robin Heydon // 1 thread
Proposed new development on the A505 between Heydon and Fowlmere
Created by John Chamberlain // 1 thread
Eversholt Street closed to all southbound traffic including cycles till late May
Created by Roxanne (CEO) // 1 thread
Last month, the Government launched the process to develop a long-term Spatial Framework for the Oxford-Cambridge Arc. The Government’s ambition is to support a better, more sustainable approach to planning for growth and investment in the area.
The Government's proposal:
https://www.gov.uk/guidance/oxford-cambridge-arc
What is the Arc?
The Oxford-Cambridge Arc (the Arc) is a globally significant area between Oxford, Milton Keynes and Cambridge. It is formed of five ceremonial counties: Oxfordshire, Bedfordshire, Buckinghamshire, Northamptonshire and Cambridgeshire.
It supports over two million jobs, adds over £110 billion to the economy every year and houses one of the fastest growing economies in England.
Our ambition for the Arc
There is an opportunity, recognised by government and local partners, to build a better economic, social and environmental future for the area. With high-quality, well-connected and sustainable communities making the Arc an even more beautiful place to live, work and visit.
Delivering the ambition
To achieve this ambition, the government alongside local partners, is going to:
Develop a Spatial Framework for the Arc; a long-term strategic plan to help coordinate the infrastructure, environment and new developments in the area. We are committed to working with local communities throughout so we can create beautiful and sustainable places for residents and workers to enjoy.
Explore the creation of an Arc Growth Body; that would be a clear economic leadership voice for the Arc, championing its talent and assets internationally, supporting businesses, and fostering innovation.
Areas of focus
Productivity and jobs
The Arc currently generates over £110 billion to the UK economy every year.
The Arc has the potential to become a world-leading and globally renowned centre for business, innovation and investment in a variety of industries, including AI (Artificial Intelligence), advanced manufacturing and life sciences.
Placemaking
With a strategic approach to planning for growth, we can enhance the area’s natural environment and biodiversity, ensure communities and businesses have access to the infrastructure they need, and ensure new development is more affordable and beautiful so that it enhances places across the Arc.
Infrastructure and connectivity
Improving connectivity across the Arc with a new rail line between Oxford, Milton Keynes and Cambridge will link communities with employment and leisure opportunities.
While integrating sustainable and accessible transport options will support our ambition for the Arc and ensure homes and employment sites are situated in the right places.
Environment
Encouraging clean growth and the creation of sustainable communities will support us in improving the quality of life for those that live and work in the Arc. While also helping us future-proof its businesses and communities against the effects of climate change.
Key documents
Created by davidsecher@gmail.com // 1 thread
This is probably an old issue, but I only discovered this cycleway on Sunday. I very nearly had a bad accident cycling through the pinch point (pram arms) at the Dry Drayton end of the Bar Hill Cycleway. There are many photos on Cycle Street's photomap (e.g. 26327) that illustrate the invisibility in the shade of the metal arms. No signage or reflective tape to warn of the hazard. For me, this is MUCH more dangerous than the A14 bridges. (I have signed the petition and attended the Highways meeting.) Similar obstruction towards Bar Hill too, but by then I knew to walk the bike through!
Created by Steven Moseley // 1 thread
CONVERSION OF EXISTING GROUND FLOOR D2 USE INTO 4 APARTMENTS
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.