Stow cum Quy: chicanes
On-road section of Greenway which is unpleasant and dangerous, and certainly not suitable for riders of all ages and levels of confidence, as it should be.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Martin Wheatley // 1 thread
On-road section of Greenway which is unpleasant and dangerous, and certainly not suitable for riders of all ages and levels of confidence, as it should be.
Created by linus // 1 thread
This is a joint Camden and Westminster consultation of the design of a short route of part of the longer Fitzrovia to Pimlico cycle route. https://westminstercycleways.co.uk/cleveland-street-cycleway.html
Westminster Council is leading on this project. Consultation closes 3 March. There will also be a drop-in community event about the plans from 3pm to 7.30pm on Tuesday 7 February 2023 at Fitzrovia Community Centre, 2 Foley Street, London W1W 6DL.
Created by Marcus Howarth // 1 thread
The current layout and building stock at Greenshaw are inefficient and energy intensive.
sound+fury // 1 thread
22/05108/SCRE | EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping. | Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
Created by Marcus Howarth // 1 thread
The Council is proposing to introduce a traffic management scheme in Plough Lane junction with Collyer Avenue and Queenswood Avenue. We are proposing these measures in response to concerns raised by local residents in the area, ward councillors about traffic speed, noise, pollution, cut through traffic and road safety at the above mentioned junctions.
What is proposed?
The following measures are proposed:
What is the aim of the measures?
These measures aim to
From the 2023/24 and indicative 2024/25 programmes: (A) / Environment and Sustainable Transport Committee
Appendix 7 b) - this is getting (£ ,000's )
Perceived safety issues raised that vehicles are not stopping at the
existing zebra because vehicles are rat running to avoid Croydon
Road/A232 (red route). The zebra is located on a link between the two
roads being used for rat running so drivers are looking for the next road
entrance rather than at the zebra. The proposal is considering measures
to address through traffic issues - initial locations being investigated are
the junctions of Queenswood Avenue/Plough Lane and Collyer
Ave/Plough Lane (subject to consultation).
The proposal also includes consideration of a parallel low traffic cycle
route along Queenswood & Collyers Road as an alternative to the A232
Croydon Road which currently has no cycle facilities along the parallel
stretch. Cyclists using this quiet alternative link will be able to re-join the
A232 Croydon Road via Aldwick Rd which connects to the existing
Croydon Rd cycle facility. This element of the scheme could be moved to
the Cycle Network Development/Borough Cycling Fund.
Created by Robert Watson // 1 thread
Grange Road has extremely narrow cycle lanes for most of its length, which include traffic calming bollards forcing traffic down to a single lane. While this design does slow traffic, the narrow space for the cycle lane means that trikes have to slow almost to a stop to pass safely -- or in some cases may not fit at all. This forces trikes out into the single centre lane, where cars may not properly give way, and also are the sites of speed bumps and significant potholes. If the lanes were about 20-30cm wider, then trikes could pass without a problem. This issue affects all of the bollards on both sides of Grange Road for its full length, but I’ve highlighted a particularly problematic one since I had to pick a spot.
(In general, the cycle lanes on Grange Road are too narrow for cargo trikes forcing them out into traffic lanes anyway, but it’s the brick bases to the bollards that cause a particular problem.)
Created by Robert Watson // 1 thread
On the northeast side of the Trumpington Road and Brooklands Ave junction, there’s a combined cycle and foot path around the corner that suffers two problems that make trike use problematic in peak times:
Created by Robert Watson // 1 thread
Bollards close Storeys Way to through traffic while allowing cycles through. However, the bollard spacing makes it difficult to get cargo trikes through -- e.g., Nohila and Winther products.
Where the new wands on East road begin if heading from the Newmarket road underpass into East road is a layby outside Mackays. The placement of the wands initially mean there is insufficient room to cycle on the road, but the layby is potholed, making it difficult to ride through. After the layby the spacing is wider and they are much better.
Created by PHG // 1 thread
The new wands on East road force cyclists on to the pavement, rather than the roundabout, where East road meets Newmarket roundabout. Why should cyclists be blocked from using Newmarket roundabout, which is the easiest way to access the bus lane on Elizabeth Way bridge.
Pulling out of the wands early is dangerous and annoying. more annoying is when you forget and have to stop, or go onto the pavement and round to use the ramp.
Created by Anna Williams – Head of Campaigns & Engagement // 8 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by KW // 1 thread
Demolish and replace with terrace of three: conflicting bike store drawings, so which version already has permission?
sound+fury // 1 thread
Is this a cause for celebration?
Created by cpax // 3 threads
Like many other cyclists the majority being school pupils I have used the road between Perne Road and Tiverton Way as a way to avoid the traffic on Birdwood Road , however recently the work has begun to convert the bungalow and often with builders vehicles blocking the cycle path on Perne Road . Today I encountered a group of people gathered ( deep in discussion ) in the road adjacent to the empty site which lies closer to Tiverton Way and on hearing my cycle bell seemed reluctant to move . I am concerned that this could be a site for future conflict .
sound+fury // 1 thread
Reserved matters for another phase of Eddington, including landscaping, cycle and pedestrians routes, and cycle parking.
sound+fury // 1 thread
New cycle parking proposed for staff and on street.
Created by Sarah Hughes // 1 thread
We need to finalise the route for the Winter Lights ride on 10th Dec
Created by Jason Broadrick // 1 thread
Created by Rosamund Humphrey (Admin Officer) // 2 threads
The full Council, comprising all 61 County Councillors, is responsible for setting the Council's budget, the Council Tax and agreeing the Council's main policies.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Audit and Governance Committee's role is to review the Combined Authority's financial affairs, internal control, corporate governance arrangements and risk management. The Audit and Governance Committee was established by the Combined Authority in March 2017 in accordance with the Combined Authorities Order 2017. The committee is made up of one member from each of the constituent councils of the Cambridgeshire and Peterborough Combined Authority.
Created by Shaun McDonald // 1 thread
Proposed construction of a link road between Europa Way and Bramford Road, with a new mini-roundabout on Bramford Road, together with a shared footway/cycleway, sustainable drainage and landscaping (Suffolk County Council ref. SCC/0090/22IP).
Land Between Europa Way And Bramford Road Ipswich Suffolk
Ipswich
Application reference : 22/00786/FPC
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Matthew // 1 thread
We've received a note from a concerned resident:
Not too sure if this has been informed of this but the Sawston to Babraham CyclePath is planned to be closed by a commercial property developer on 15th Sept. Don't know when it'll reopen. All cyclists will be forced to cycle on the main road that is a pretty hairy affair at the best of times. They did this already for 2 days back in August without any consultation. The cyclepath has become very popular in the last few years as many employees from the Babraham and Granta Parks use it for commuting. Also it's relatively new so can't believe that private developers are allowed to shut it basically to use it as a free convenient storage area.
Created by Tim Steele // 0 threads
Where the path splits there is a marker post that is completely invisible at night. It should be fitted with reflective material or removed.
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.