Roadworks: Calthorpe Street
Emergency gas works on Calthorpe Street from 1st January until 7th January.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Chamberlain // 1 thread
Emergency gas works on Calthorpe Street from 1st January until 7th January.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Demolition of single storey dwelling and erection of part 2/ part 3 storey building containing 2 no. 1 bed flats and 3 no. 2 bed flats
138 Brooks Road Cambridge CB1 3HR
Cambridge
Application reference : 19/1505/FUL
Demolition of 32no existing flats and garages, and erection of 75no new affordable dwellings, including 4no houses and 71no apartments, a new community facility, car parking, landscaping and associated works.
67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP
Cambridge
Application reference : 19/1616/FUL
sound+fury // 1 thread
Proposed football stadium move.
Created by Hounslow Cycling Campaign // 1 thread
London Borough of Hounslow is consulting on the provision of secure cycle parking in residential streets around the borough.
The council has recently installed an on-street bikehangar in Chiswick at Ashbourne Grove and has received further requests from several residents nearby. Bikehangars offer secure cycle parking for residents in areas where the ability to safely store bikes within a property, or the front/rear garden, is limited. This is part of the council’s commitment to encourage more sustainable forms of transport for daily journeys. The council covers the installation cost of new bikehangars via an annual grant allocation from Transport for London to increase cycle parking provision in the borough, there is a rental fee per year of £72 per space, plus a deposit for a key (£25). The allocation of spaces is managed by the council’s contractor, Cyclehoop, who also look after ongoing maintenance.
Each new installation is the subject of a separate consultation. This is presumably because of the sensitivity of residents to any reduction in the number of parking spaces for cars.
Created by David Green // 1 thread
I will be running four Wheel Building Workshops in Cambridge during 2020 (dates on website). It makes a great Christmas present for anyone who is a keen cyclist, or interested in cycle maintenance and repair.
Potential redesign of junction looks very poor - The usual set of issues with cars cutting across bikes, no real segregation, lanes starting/stopping etc. etc. etc.
Created by Harry Fletcher-Wood // 1 thread
Proposal includes:
Created by M Stanley // 1 thread
Really exciting proposals for Meadow Lane leading over Leeds Bridge and to the Corn Exchange.
Currently meadow lane is an inner city dual carriageway. It is proposed that it will become a single carriageway in each direction for motor vehicles and the space repurposed into pedestrian and cycle facilities. Consultation is now closed but it still needs to go to detailed design stage. Full details can be seen at the attached web link.
Changes are proposed on a 1km section of the A660 due to delays to buses caused by congestion. An outbound bus lane is proposed between Victoria Road to just past Bainbridge Road. Cycleway is retained on inbound section, but outbound section would be shared with buses. 20 buses per hour would use the bus lane at peak times. Difficult one for the campaign this? Is a 24hr 3.5m bus lane preferable to a 1m advisory cycle lane? Majority of bus lane is downhill.
Particular discussion points were ensuring that the cycle lane continues over side roads, even though the bus lane stops, and querying a two stage pedestrian crossing (should be one stage). Plans still at early stage so will likely return to the forum.
Anon // 1 thread
Overview
We would like your views on highways improvements on Wood Vale.
Residents have told us that they would like to see reduced speeds and less through traffic on Wood Vale so we have put together a proposal to tackle these issues that we would now like your feedback on. We would especially like to know if you think the designs could be improved or if we have missed any opportunities.
The measures will include:
As part of these works we will also be taking the opportunity to refurbish the footway along the road where it is needed.
Separately from this consultation, please note that Melford Road carriageway resurfacing has been reprogrammed for the 16th of January. Separate notification will be issued for this work closer to the scheduled implementation date.
Let us know what you think by filling in the online survey. Drawings can be viewed in the additional documents section.
Why We Are Consulting
We are consulting to find out what you think of the proposals and if you have any suggestions.
Give Us Your ViewsOnline Survey
Created by Matthew // 1 thread
The permissive route between Shire Hall and Magrath Avenue has issues (not the least of which being there are steps) however it does cut through the middle of what is otherwise an overly large block between Victoria Road and Chesterton Lane. There is also some irony in the fact that it appears to be the last remnants of a way that was once a Roman Road from Castle Hill heading due north.
Naturally, it is under threat from the sale of Shire Hall. We received the following e-mail:
Can you help ? As you may be aware the County Council has leased the
Shire hall and some of the surrounding buildings to a development
company. At present the situation regarding public access to the
permissive path that runs between the top of McGrath Avenue and Castle
Hill remains unclear. There is to be a public meeting sometime in
December or early January where Suffolk County Council as arbitrator
will take submissions.
Some neighbours and I are collecting data on the numbers of pedestrians
and cyclists that use the cut through during rush hours - at present the
number of journeys made per hour range from 116 (49 cyclists) to 149 (69
cyclists)which is just over 2 journeys per minute.
Thus as you can see closing this path would be a tremendous loss to the
local community forcing many people into taking busier routes along
Victoria Road and other major routes increasing the risk of accidents.
We would be very grateful for your support. There is to be a link on
the County Council website for submissions but alternatively you can
send statements to Jocelynne Scutt , copying in Claire Richards ( both
County Councillors). These statements will then be forwarded to Suffolk
County Council in batches rather than receiving them
individually.Please see above for Jocelynne's and Claire's email
addresses.
Section 73 to remove Condition 5 of C/02/0136/RM (Demolition of existing buildings and erection of non food retail units and garden centre, Drive thru retaurant with associated servicing, Car Parking, Landscaping, new access and relocation of existing amenity car park (reserved matters - to original application C/99/1121/OP)) - removal of bollard.
Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire
Cambridge
Application reference : 19/1500/S73
Created by Matthew // 1 thread
Cambridgeshire County Council proposes to make an Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Amend the no loading and unloading restrictions on Mill Road, Cambridge from Monday to Saturday 8.15 – 9.15am and 5pm – 6pm to Monday to Saturday 7.30 - 9.30am and 4.30 - 6.30pm in the follow locations;
I have attached a copy of the public notice and plan, showing the location and extent of the proposed restrictions.
A copy of the draft Order and plans can also be seen online from Wednesday 20th November 2019 at http://bit.ly/cambridgeshiretro
If you wish to make any comments on these proposals we would appreciate them in writing to the address below or by email to policyandregulation@cambridgeshire.gov.uk no later than the 11th December 2019 quoting reference PR0594.
Created by John Chamberlain // 1 thread
From 20th November until 18th December contractors Sf Stefan will be laying broadband fibre on Royal College Street. This will affect the northbound with-flow cycle lane. As far as possible, a segregated cycle lane will be maintained by closing parking bays and using barriers to make a cycle lane in the main carriageway but there may be a few locations where cyclists temporarily have to use the main carrigeway.
Technical details consent for construction of 9 dwellings and means of access, following demolition of redundant Health Authority offices (pursuant to grant of 19/0769/PIP for Permission in Principle for residential development of 9 dwellings).
Cambridge And Huntingdon Health Authority 18 Vinery Road Cambridge Cambridgeshire CB1 3DX
Cambridge
Application reference : 19/1389/TDAMIN
There's a whole bunch of locations reported for this Cambridge Cow sculpture exhibit.
I've already spotted one that gets too close to a dropped kerb in Station Square. More eyes needed to look through all the proposed locations.
Created by John Chamberlain // 1 thread
From Monday 25th November to Monday 2nd December Gower Street will be closed from Grafton Way to between Torrington Place and Chenies Street for resurfacing. There will be no access for motor vehicles nor cyclists and both University Street and Torrington Place will be closed with diversions in operation. This will obvously have a major impact on the E-W cycle route on Tavistock Place/Torrington Place. Details of diversion routes are shown in the attached thread.
Then from December 2nd until Monday 9th the works move south and Gower Street will be closed from north of Chenies Street to mid-way down Bedford Square. The E-W cycle route on Tavistock Place/Torrington Place will re-open. This should have less impact but there will still be local diversions.
Created by John Chamberlain // 1 thread
From 25th November to 23rd December one lane of Eversholt Street will be closed between Phoenix Road and Drummond Crescent for work on a 16" water main. Traffic will be two-way but controlled by signals and therefore is likely to be even more congested than usual. In addition, Phoenix Road will be closed so cyclists will need to use Polygon Road to access Somers Town and Ossulston Street.
Update 27/11/19 - now deferred till 2020
Created by Neil Robertson // 1 thread
To reduce through traffic in the Hills and Vales area of West Greenwich.
Two options are offered:-
1. 4 Modal filters and a one way road.
2. 2 modal filters 2 one ways and a timed restriction with camera control on Hyde vale.
Even very narrow lanes in this area are used by rat running vehicles, often at unsuitable speeds, so removal of through traffic will improve the area.
Created by Peter Loader // 1 thread
The Colne and Crane Green Infrastructure Strategy includes a proposed new walking and cycling link between Rickmansworth Station and the Colne Valley Trail at Rickmansworth Aquadrome. At its meeting on November 4th 2019, Batchworth Community Council set up a project to ensure that this new route was implemented via Rickmansworth Town Centre, in line with two of Rickmansworth Parish Councillors' strategies.
This would involve designing the preferred route via Bury Lane, Rickmansworth and then part-funding Hertfordshire County Council to create it.
This shows the course of the preferred route, which is open to a phased implementation as funds permit.
Created by Chris Howell // 1 thread
This is a suggestion to create a Dutch style cycle map for the area around Cambridge and get the waypoints and routes marked on the ground to help navigation by bike, and then use it to measure progress on creating better routes.
Created by JonC // 1 thread
Plans to improve Rushgrove Park include a new crossing of the Silkstream near Colindeep Lane, with a new access point on Colindeep Lane, joining with the existing route following the western side of the park to emerge on Crossway. The draft masterplan describes this as the "primary shared cycle and footpath with seasonal tree avenue".
Consultation details and online questionnaire on the link below...
Created by JonC // 1 thread
Plans to improve Colindale Park include a 3.2m wide shared-use pedestrian/cyclist path linking Colindale Station and Sheaveshill Avenue.
It is described in the draft masterplan as a commuting route - it's actually the 250m long path at the NE edge of the park.
Consultation details and online questionnaire on the link below...
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area