S/3011/19/E1 EIA screening opinion new Cambs police station in Milton
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
Created by Roxanne (CEO) // 37 threads
We're moving forward on our policy project. This thread is to discuss the various policies and move them towards publication.
Anon // 1 thread
Dog Kennel Hill Bus Lane Widening
Closes 29 Sep 2019
Opened 23 Aug 2019
Contact
Lola Olanlokun
(Project Manager)
Highways
Overview
We want to improve bus journey times along Dog Kennel Hill, as it has been identified that the bus lane is on a steep hill in this section and cyclists can hold up buses significantly as the lane is currently too narrow for buses to safely overtake cyclists travelling up the hill.
In order to support this, we are proposing to widen the northbound bus lane on Dog Kennel Hill, either side of the junction with Albrighton Road. We are also considering changing the bus lane hours of operation to 24 hours a day 7 days a week. This will reduce conflict with other vehicle types and help buses keep to timetable.
These proposals should improve journey times for passengers using the 40, 176, 185 and 484 bus routes. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
To do this and maintain the carriageway width for other vehicles, we plan to reduce the width of the central reservation. This will involve the transplanting of one tree, but we plan to plant an additional new tree, so the net impact would be additional tree cover.
Please see the plan for these works here:
If the project goes ahead, works will be undertaken in early 2020. We would try to minimise any disruption, and no full road closure should be required.
Why We Are Consulting
As there may be some disruption for local residents during construction, we want to make sure you have the opportunity to review the proposals and let us know if you have any concerns.
Anon // 1 thread
Traffic order has been raised for the Southwark Spine North section we need to gather feedback for any objections and urgent suggestions.
Focus only on issues that are serious as its going to go in most as is.
Tom McKeown // 3 threads
Events to promote cycling within Histon and Impington. Raise awareness for groups other activities.
Created by Simon Munk // 1 thread
Council says:
Wandsworth Council would like to hear your views on proposed improvements for pedestrians and cyclists along Thessaly Road, enhancing access and the local environment.
As motorised vehicle movements are relatively low on Thessaly Road, the proposals aim to provide safer infrastructure for more vulnerable road users.
The proposed introduction of raised, controlled crossing points would benefit pedestrians, particularly school children visiting local community facilities and St George’s Primary School, whilst also slowing traffic speeds along Thessaly Road.
Within the scope of the scheme, Thessaly Road would also have new raised ‘Copenhagen style’ junctions with side roads, to create an improved pedestrian and cycle user experience and slow down traffic joining Thessaly Road. ‘Copenhagen style’ junctions allow cyclists and pedestrians to have priority over vehicles exiting the side roads. The scheme will also include installation of new high-quality paving materials and new cycle parking.
A segregated cycle track would provide a safe route for cyclists between Battersea Park Road at the north end (which is the subject of proposed improvements being developed in partnership with Transport for London) and Wandsworth Road and Lambeth to the south. It would also provide a safe route to the two new Northern Line Extension stations opening in 2021.
The proposals include improvements to the public realm at the junction of Condell Road, Deeley Road and Battersea Park Road, featuring new seating areas and new planting.
The scheme is part of a package of infrastructure improvements in the area which include proposals for a Controlled Parking Zone and a colourful ‘Happy Street’ redesign for the Thessaly Road rail bridge, all funded by contributions from developers in the area.
In line with strategic masterplans for the Vauxhall Nine Elms Battersea Opportunity Area, Thessaly Road has been identified as a key strategic link for cycle and pedestrian movements from north to south through the opportunity area, and so the proposed improvements reflect the need to meet changing demands of this growing central London area.
It is important for the Council to know the views of local residents and businesses before progressing with any improvements.
Created by John Chamberlain // 2 threads
TfL are consulting on changes to the junction of Camden Street with Camden Road. These include a new pedestrian crossing on Camden Road, cycle ASLs on all three approaches and a left-turn ban plus cycle feeder lane on Camden Street.
The consultation is at https://consultations.tfl.gov.uk/roads/camden-street-camden-road/ This includes a plan of the proposed layout and a Healthy Streets checklist (which shows minor improvements).
You can respond direct to TfL via the website or by email to consultations@tfl.gov.uk. We will put in our formal response before the 29th September deadline, incorporating responses gathered here.
Anon // 1 thread
Overview
We are conducting a parking study in the South East (SE) Bermondsey area, shown outlined in blue below, with a view to introducing a parking zone.
We have received numerous requests from residents and businesses, including a petition, requesting parking controls from a number of streets within the area shown below.
A parking study is an opportunity for the council to assess the parking issues in a certain area by asking the local residents and businesses how they view parking on their street and whether they would like a parking zone to be introduced.
A parking zone is a network of streets covered by parking controls. Each street is marked out with either parking bays or double yellow lines.
The council will analyse responses on a road by road basis and make recommendations to the decision maker on zone boundary and operation days and times based on the street by street analysis.
Any parking controls that we introduce will take into account the results of the consultation as well as existing highway safety issues in the proposed zone, feedback from emergency services, and our wider transport policies reflecting our responsibilities to air quality and active travel.
We would like to hear your views on the proposal.
Please read the consultation booklet and consider the proposed layout design, both attached below, before completing the questionnaire online or by post via the freepost address, by Sunday 22 September 2019.
For more general information about parking in Southwark visit www.southwark.gov.uk/parking
Why We Are Consulting
Since the neighbouring Thorburn Square parking zone was implemented in October 2018 (results of which are summarised here), we have received numerous requests from residents, including a petition, requesting parking controls to be extended into the area to the east of St James Road to address the issue of increased parking pressure.
The study area includes a section of streets in the north of the study area surrounding the Blue where businesses have voiced concern about parking pressure from commuters.
We have had discussions with residents, and met with businesses before launching this consultation to discuss parking issues so that our consulation and design best fits the needs of both residents and local businesses and which complements the Good Growth Fund project at The Blue, currently underway.
Free parking for traders and customers is currently offered at the The Blue car park and improvements to these parking arrangements are being managed separately by the housing parking team alongside the Good Growth Fund project.
19/1101/FUL | Change of use from a dwellinghouse (Use Class C3) to a large scale 11x bedroom House of Multiple Occupation (Sui Generis) | 140 Queen Ediths Way Cambridge CB1 8NL
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S0388/12/OL for 130 dwellings
Construction of a 168 bedroom hotel with ancillary facilities, associated access, gates, car parking (including reconfigured conference centre car parking), cycle parking and landscaping.
Created by Richard Moss // 1 thread
For discussing swept path analysis matters
Created by David Green // 1 thread
There is a dangerous group of cavities developing around the ironworks at the 'T junction' which cyclists have to negotiate every morning, while the new cyclepath to the SciencePark is unavailable.
There is a lot of non-slip surface, that red colour stuff, that has rubbed off and collected just on the bend as the path goes under the bridge, as you leave the P&R
Last week, I came past just as someone was being helped back up again, after their bike slipped on the loose surface.. It feels quite treacherous as you cycle over it.
I cant see anywhere, who to contact about removing all the loose material.
Anyone know a good point of contact to report to?
thanks, Richard
Non-material amendment on application 17/1527/FUL to include changes to Dutch's Corner, townhouses, Mews houses and landscape. Dutch's Corner changes are as follows: raised height of dormer, omission of 3 rooflights, fenestration changes and removal of recess on Ross Street elevation. Townhouse changes are as follows: reconfiguration of rooflights, reduction in bay window depth, 175mm increase to wall and internal changes. Mew houses changes are as follows: fenestration changes, amended position of house, step in roof height relocated, reduced green roof area, amendments to size of basement and front courtyards, relocated cycle store. 5 new trees omitted.
213 Mill Road Cambridge CB1 3BE
Cambridge
Application reference : 17/1527/NMA1
Created by Matthew // 2 threads
The Four Lamps roundabout at the junction of Victoria Avenue, Jesus Lane, Maid's Causeway, Short Street and King Street was built when traffic flows were anticipated to be much higher than they actually are today.
Created by Alex Raha // 1 thread
East Sydenham is changing
A key target of both the Mayor of London and the London Borough of Lewisham’s Transport Strategy is for 80% of all journeys in London to be made by sustainable means of transport (walking, cycling and public transport) by 2041. To achieve this, we have to create street environments where traffic is reduced, and where vulnerable road users, including children and the elderly, feel more comfortable making journeys on foot or by bike.
What are the issues are most important for us to address?
How would you like to change East Sydenham to make your area healthier, greener and more pleasant to live in?
Reserved Matters application for second housing phase (known as BDW2) including 330 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 18, 26, 27, 29, 35, 40, 49, 52, 58, 62, 63, and 66 pursuant to outline approval 07/0003/OUT and use of the Pavilion building for Use Classes A1 (shops), A3 (restaurants and cafes), A4 (drinking establishments), A5 (hot food takeaways).
Land Between Huntingdon Road And Histon Road, Cambridge Known As "Darwin Green One"
Cambridge
Application reference : 19/1056/REM
sound+fury // 1 thread
Application reference : 19/1022/FUL
Created by Debra Storr // 1 thread
Corn links delayed until 2020.
Link from Uni to Foresterhill not et wit a lot of support in discussions
Grampian Cycle Partnership
Created by Debra Storr // 1 thread
Sustrans sought suggestions for improvements
Created by Debra Storr // 1 thread
Plans in progress for cycleroute from Ellon to Aberdeen. Parts of route exist. Grampian Cycle Partnership involved with both Aberdeen and Aberdeenshire Councils.
sound+fury // 1 thread
Application reference : 19/1048/FUL
Created by Debra Storr // 1 thread
King St/Ellon Road is a main artery into Aberdeen. We are advised that the traffic volumes due tot he AWPR have reduced and in order to lock in this benefit there need to be some urgency to utilise freed up road space to more sustainable forms of transport.
And no - the parallel NCR1 isn't suitable. It's hilly with cobbles and have weird diverts. as a tourist route through the university and Old Aberdeen, its fine.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.