Unhappy pavement 'cyclepath'
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Debra Storr // 1 thread
This stretch of pavement is signed as shared cycle/footpath but is really too narrow and obstructed for this use.
Created by Debra Storr // 1 thread
Shared cyclepath fizzles out with a short length of a parallel roadway providing the infill. Uncomfortable.
Created by Debra Storr // 1 thread
This is a 40mph distributor road which is currently fairly quiet. But many houses are planned in this location. It would have been helpful if the pavement has been built a bit wider and designated as a shared path/cycleway. Even better would be an actual cycleway but we can press for that with the development.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Debra Storr // 1 thread
With a existing cyclepath on south-west of roundabout and a proposed cyclepath on the north east side, the issue of a crossing at the Murcar roundabout needs to be resolved.
Created by Debra Storr // 1 thread
While part of new Balmedie-Blackdog route is tarmac, the southern portion has been left as gravel/ground and will undoubtedly get worse in winter. Funds are being sought to improve.
Created by Debra Storr // 1 thread
Consultation open until 18th August 2019 on cycleway as shown.
Unresolved issue of connections into Blackdog from bus stop on dual carriageway and connection at Murcar onto existing shared cyclepath on west side of dual carriageway.
Created by Hounslow Cycling Campaign // 1 thread
The London Borough of Hounslow is consulting on the Local Plan Reviews for the Great West Corridor and West of Borough opportunity areas. The Local Plans set out planning guidelines for major developments in the respective areas. Each Plan includes a section on "Connecting People and Places" that covers transport aspects of developments.
Steve Curran, the Leader of Hounslow Council, refers to the negative impacts of major roads crossing the Great West Corridor area in his foreword. "Attractive alternatives to the private car" described in pp74-83 of the consultation document include improved walking and cycling infrastructure. Proposals for two new rail links will be rather more expensive.
Councillor Curran expresses concern about the environmental impact of a Third Runway at Heathrow Airport on the West of Borough area but also points out the regeneration opportunities. "Attractive alternatives to the private car" described in pp78-85 of the consultation document include improved cycling and walking infrastructure.
Reserved matters application pursuant to outline approval 06/0796/OUT (amended by Section 73 approval 17/2258/S73) for: an R and D Enabling Building of 13,197 sqm; an Amenities Hub of 3,261 sqm; associated car, motorbike and cycle parking including a Multi Storey Car Park; a temporary Multi Use Games Area; hard and soft landscaping; and internal roads, supporting facilities and ancillary infrastructure.
Astrazeneca Uk Ltd Cambridge Biomedical Campus Francis Crick Avenue Cambridge Cambridgeshire CB2 0AA
Cambridge
Application reference : 19/1070/REM
19/1010/FUL | Conversion and extensions to the existing buildings including demolition of the existing block to the rear of 1 Godesdone Road to deliver a mixed use development comprising a ground floor retail space and 12 1xbed residential units (net increase 9) to the rear and above along with cycle parking and associated infrastructure. | 185-189 Newmarket Road And 1 Godesdone Road Cambridge Cambridgeshire CB5 8HA
Martin Lucas-Smith // 1 thread
Creation of a cycle storage area equiped with racks to facilitate appprox 200 cycles following removal of a large white birch tree to undertake repairs to building caused by tree roots.
Robinson College, Porters Lodge Grange Road Cambridge CB3 9AN
Cambridge
Application reference : 19/0926/FUL
Demolition of existing flats 66-80b Colville Road and erection of 69 affordable dwellings, including 6 houses and 63 apartments, including resident and public car parking, landscaping and associated works
66-80B Colville Road Cambridge Cambridgeshire CB1 9EJ
Cambridge
Application reference : 19/1034/FUL
The A14 works have closed the east side pavement/cyclepath for some amount of time.
This either forces people to cross the rode via 4 toucan crossings (and cycle or walk up a very narrow stretch) which is technically not a cycle path I believe. Alternatively people have to cycle on road across a busy 2 lane 60mph limit roundabout.
sound+fury // 1 thread
Created by Peter Loader // 1 thread
Create an unsegregated cyclist/walker area in the paved area that was produced when the northern arm of Northway, Rickmansworth became traffic-free. Call it Northway Square. This would become the centre of Rickmansworth's cycling/walking network, with Bikeability level 2 routes leading:
* To National Cycle Network Route 61 (The Colne Valley Trail at the Aquadrome), to Mill End, and to Maple Cross.
* To Rickmansworth Station, to Chorleywood, and to The Cedars Estate,
* To Croxley Green, via Three Rivers District Council's car park.
Upgrade the existing public footpath to a bridleway so the route remains on the definitive map.
Martin Lucas-Smith // 1 thread
The section of East Road at the police station end, with the cycle lane, suffers from absolutely rife pavement parking and parking in the cycle lane.
Created by Alex Jenkins // 2 threads
The draft Tower Hamlets Transport Strategy aims to improve the way we move around our borough.
Tower Hamlets is one of the country's fastest growing boroughs. Our roads are the busiest in the UK.
77 per cent of our residents are exposed to unsafe pollution levels, children in the borough have on average up to ten per cent less lung capacity and 43 per cent of Year 6 school children are overweight or obese.
According to Public Health England, pollution is linked to increasing rates of asthma, heart disease, dementia, lung cancer and low birth weight.
The new strategy aims to address these concerns and look at what the council and residents can do to make travel cleaner, safer and accessible for everyone.
Promoting walking and cycling is at the heart of plans to help meet the Mayor of London’s target that 90 per cent of all trips in the borough should be made on foot, by cycle or by using public transport by 2041.
Over the next two months, the council will be asking all those who live and work in the borough to get involved, share their ideas and help shape the future of travel in Tower Hamlets.
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/2413/17/OL as varied by Section 73 application S/4116/18/VC for the erection of up to 200 residential dwellings (including 40% affordable housing), demolition of no. 117 Rampton Road, introduction of structural planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access points from Rampton Road and associated ancillary works.
Land Off, Rampton Road, Cottenham, Cambridgeshire
South Cambridgeshire
Application reference : S/2549/19/RM
Tom McKeown // 1 thread
The mouth of Cotteham Road is wide and fast. How do we get this improved? Especially in the context of the new school.
Created by Martin Gorst // 1 thread
Ealing Council is consulting on a new scheme for the area outside Ealing Broadway station.
Reduction in Cycle Parking
As part of the scheme, Ealing Council plans to remove 59 cycle stands on and near Haven Green and replace them with 29 stands along the Broadway. This will remove parking for 60 bicycles. As Haven Green is common land, the cycle stands on the grass are only temporary. At some point they will need to be removed. Ealing Cycling Campaign has repeatedly urged the council to earmark a site near Ealing Broadway station for permanent cycle parking. A good location would be the car park along the south side of Haven Green. Unfortunately the council has still not been successful in acquiring the required land, and has not yet decided to instigate compulsory acquisition procedures, or otherwise escalate the process.
At times of peak demand, the cycle stands near Ealing Broadway fill up, and people lock bicycles to trees and other objects. With the arrival of the Elizabeth Line and the new cycleway to Greenford, the demand for cycle parking at the station will grow.
Where’s the Cycle Lane?
The new plans don’t include the contraflow cycle lane (below) the council promised six years ago.
For over 20 years Ealing Cycling Campaign has lobbied the council to build a contraflow cycle path to run along the east side of Haven Green (but not on the common) to link the Mall with the roundabout at Madeley Road. This will provide a direct route to and from Ealing Broadway station so people don’t have to cycle around the Arcadia Centre and Haven Green. In 2013, the council included the cycle path in its mini Holland plans. However, it has disappeared from the latest proposals. This goes against the council’s transport policy for its cycle network, which states: “Where one-way streets are implemented, the default position will be that contra-flow cycle lanes will be provided.”
sound+fury // 1 thread
The changes themselves are not controversial. (College doing some refurbishment of property for student use.) However, for a 7 bed house, they propose only 6 bike rack spaces.
Anon // 1 thread
We would like your views on suggested changes to the controlled parking zone on your road
In 2018 we asked you if would like us to make any changes to the Bermondsey CPZ 'G'
As part of this survey we sent out a total of 9,517 surveys and received a 4% response rate. 65% of those who responded wanted the current parking restrictions to be amended with 61% stating that they struggle to park on a Saturday. We would now like to know in detail the changes that you would like us to make.
We know, from the original survey and changes in the area such as residential developments and an increase in bars and restaurants, that parking stress has increased and we would like to know what changes you would make.
If we receive a majority in favour of amending the operating times and hours of Zone ‘G’ we will put forward a recommended amendment to the Cabinet Member for Environment, Transport and the Climate Emergency to make a final decision.
In addition to potential changes to the operating hours of the controlled parking zone we would also like to know if residents and businesses in the Shad Thames area would like their own separate zone. This would mean that permit holders in this area would have their own permits and would only be able to park in that area.
This decision would then be subject to statutory consultation.
What are the pros and cons of extending the operating hours of my parking zone?
Pros
Cons
If we were able to reduce the amount of vehicles parked in the area, we could consider introducing a variety of street improvements as detailed below:
Created by George Coulouris // 1 thread
Royal College Street works 8th July -16th August
The planters will be replaced by granite kerbs – affecting RCS south of Baynes Street.
The works will start on 8th July and are expected to be completed by 16th August 2019. During the works, northbound cyclists will be diverted to use the with-flow traffic lane whilst southbound cyclists will be diverted to use St Pancras Way.
We will keep you informed here as to which segment of the cycle track is currently unavailable.
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
Group looking at issues for active travel in the Chesterton area.
sound+fury // 1 thread
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.