S/3011/19/E1 EIA screening opinion new Cambs police station in Milton
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
EIA screening opinion for up to 4,801 sqm of operational police accommodation and ancillary functions
Land at Milton
South Cambridgeshire
Application reference : S/3011/19/E1
Created by Roxanne (CEO) // 37 threads
We're moving forward on our policy project. This thread is to discuss the various policies and move them towards publication.
Anon // 1 thread
Dog Kennel Hill Bus Lane Widening
Closes 29 Sep 2019
Opened 23 Aug 2019
Contact
Lola Olanlokun
(Project Manager)
Highways
Overview
We want to improve bus journey times along Dog Kennel Hill, as it has been identified that the bus lane is on a steep hill in this section and cyclists can hold up buses significantly as the lane is currently too narrow for buses to safely overtake cyclists travelling up the hill.
In order to support this, we are proposing to widen the northbound bus lane on Dog Kennel Hill, either side of the junction with Albrighton Road. We are also considering changing the bus lane hours of operation to 24 hours a day 7 days a week. This will reduce conflict with other vehicle types and help buses keep to timetable.
These proposals should improve journey times for passengers using the 40, 176, 185 and 484 bus routes. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
To do this and maintain the carriageway width for other vehicles, we plan to reduce the width of the central reservation. This will involve the transplanting of one tree, but we plan to plant an additional new tree, so the net impact would be additional tree cover.
Please see the plan for these works here:
If the project goes ahead, works will be undertaken in early 2020. We would try to minimise any disruption, and no full road closure should be required.
Why We Are Consulting
As there may be some disruption for local residents during construction, we want to make sure you have the opportunity to review the proposals and let us know if you have any concerns.
Anon // 1 thread
Traffic order has been raised for the Southwark Spine North section we need to gather feedback for any objections and urgent suggestions.
Focus only on issues that are serious as its going to go in most as is.
Tom McKeown // 3 threads
Events to promote cycling within Histon and Impington. Raise awareness for groups other activities.
Created by Simon Munk // 1 thread
Council says:
Wandsworth Council would like to hear your views on proposed improvements for pedestrians and cyclists along Thessaly Road, enhancing access and the local environment.
As motorised vehicle movements are relatively low on Thessaly Road, the proposals aim to provide safer infrastructure for more vulnerable road users.
The proposed introduction of raised, controlled crossing points would benefit pedestrians, particularly school children visiting local community facilities and St George’s Primary School, whilst also slowing traffic speeds along Thessaly Road.
Within the scope of the scheme, Thessaly Road would also have new raised ‘Copenhagen style’ junctions with side roads, to create an improved pedestrian and cycle user experience and slow down traffic joining Thessaly Road. ‘Copenhagen style’ junctions allow cyclists and pedestrians to have priority over vehicles exiting the side roads. The scheme will also include installation of new high-quality paving materials and new cycle parking.
A segregated cycle track would provide a safe route for cyclists between Battersea Park Road at the north end (which is the subject of proposed improvements being developed in partnership with Transport for London) and Wandsworth Road and Lambeth to the south. It would also provide a safe route to the two new Northern Line Extension stations opening in 2021.
The proposals include improvements to the public realm at the junction of Condell Road, Deeley Road and Battersea Park Road, featuring new seating areas and new planting.
The scheme is part of a package of infrastructure improvements in the area which include proposals for a Controlled Parking Zone and a colourful ‘Happy Street’ redesign for the Thessaly Road rail bridge, all funded by contributions from developers in the area.
In line with strategic masterplans for the Vauxhall Nine Elms Battersea Opportunity Area, Thessaly Road has been identified as a key strategic link for cycle and pedestrian movements from north to south through the opportunity area, and so the proposed improvements reflect the need to meet changing demands of this growing central London area.
It is important for the Council to know the views of local residents and businesses before progressing with any improvements.
Created by John Chamberlain // 2 threads
TfL are consulting on changes to the junction of Camden Street with Camden Road. These include a new pedestrian crossing on Camden Road, cycle ASLs on all three approaches and a left-turn ban plus cycle feeder lane on Camden Street.
The consultation is at https://consultations.tfl.gov.uk/roads/camden-street-camden-road/ This includes a plan of the proposed layout and a Healthy Streets checklist (which shows minor improvements).
You can respond direct to TfL via the website or by email to consultations@tfl.gov.uk. We will put in our formal response before the 29th September deadline, incorporating responses gathered here.
Anon // 1 thread
Overview
We are conducting a parking study in the South East (SE) Bermondsey area, shown outlined in blue below, with a view to introducing a parking zone.
We have received numerous requests from residents and businesses, including a petition, requesting parking controls from a number of streets within the area shown below.
A parking study is an opportunity for the council to assess the parking issues in a certain area by asking the local residents and businesses how they view parking on their street and whether they would like a parking zone to be introduced.
A parking zone is a network of streets covered by parking controls. Each street is marked out with either parking bays or double yellow lines.
The council will analyse responses on a road by road basis and make recommendations to the decision maker on zone boundary and operation days and times based on the street by street analysis.
Any parking controls that we introduce will take into account the results of the consultation as well as existing highway safety issues in the proposed zone, feedback from emergency services, and our wider transport policies reflecting our responsibilities to air quality and active travel.
We would like to hear your views on the proposal.
Please read the consultation booklet and consider the proposed layout design, both attached below, before completing the questionnaire online or by post via the freepost address, by Sunday 22 September 2019.
For more general information about parking in Southwark visit www.southwark.gov.uk/parking
Why We Are Consulting
Since the neighbouring Thorburn Square parking zone was implemented in October 2018 (results of which are summarised here), we have received numerous requests from residents, including a petition, requesting parking controls to be extended into the area to the east of St James Road to address the issue of increased parking pressure.
The study area includes a section of streets in the north of the study area surrounding the Blue where businesses have voiced concern about parking pressure from commuters.
We have had discussions with residents, and met with businesses before launching this consultation to discuss parking issues so that our consulation and design best fits the needs of both residents and local businesses and which complements the Good Growth Fund project at The Blue, currently underway.
Free parking for traders and customers is currently offered at the The Blue car park and improvements to these parking arrangements are being managed separately by the housing parking team alongside the Good Growth Fund project.
19/1101/FUL | Change of use from a dwellinghouse (Use Class C3) to a large scale 11x bedroom House of Multiple Occupation (Sui Generis) | 140 Queen Ediths Way Cambridge CB1 8NL
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S0388/12/OL for 130 dwellings
Construction of a 168 bedroom hotel with ancillary facilities, associated access, gates, car parking (including reconfigured conference centre car parking), cycle parking and landscaping.
Created by Richard Moss // 1 thread
For discussing swept path analysis matters
Created by David Green // 1 thread
There is a dangerous group of cavities developing around the ironworks at the 'T junction' which cyclists have to negotiate every morning, while the new cyclepath to the SciencePark is unavailable.
There is a lot of non-slip surface, that red colour stuff, that has rubbed off and collected just on the bend as the path goes under the bridge, as you leave the P&R
Last week, I came past just as someone was being helped back up again, after their bike slipped on the loose surface.. It feels quite treacherous as you cycle over it.
I cant see anywhere, who to contact about removing all the loose material.
Anyone know a good point of contact to report to?
thanks, Richard
Non-material amendment on application 17/1527/FUL to include changes to Dutch's Corner, townhouses, Mews houses and landscape. Dutch's Corner changes are as follows: raised height of dormer, omission of 3 rooflights, fenestration changes and removal of recess on Ross Street elevation. Townhouse changes are as follows: reconfiguration of rooflights, reduction in bay window depth, 175mm increase to wall and internal changes. Mew houses changes are as follows: fenestration changes, amended position of house, step in roof height relocated, reduced green roof area, amendments to size of basement and front courtyards, relocated cycle store. 5 new trees omitted.
213 Mill Road Cambridge CB1 3BE
Cambridge
Application reference : 17/1527/NMA1
Created by Matthew // 2 threads
The Four Lamps roundabout at the junction of Victoria Avenue, Jesus Lane, Maid's Causeway, Short Street and King Street was built when traffic flows were anticipated to be much higher than they actually are today.
Created by Alex Raha // 1 thread
East Sydenham is changing
A key target of both the Mayor of London and the London Borough of Lewisham’s Transport Strategy is for 80% of all journeys in London to be made by sustainable means of transport (walking, cycling and public transport) by 2041. To achieve this, we have to create street environments where traffic is reduced, and where vulnerable road users, including children and the elderly, feel more comfortable making journeys on foot or by bike.
What are the issues are most important for us to address?
How would you like to change East Sydenham to make your area healthier, greener and more pleasant to live in?
Reserved Matters application for second housing phase (known as BDW2) including 330 dwellings with associated internal roads, car parking, landscaping, amenity and public open space. The Reserved Matters include access, appearance, landscaping, layout and scale and related partial discharge of conditions 8, 10, 14, 18, 26, 27, 29, 35, 40, 49, 52, 58, 62, 63, and 66 pursuant to outline approval 07/0003/OUT and use of the Pavilion building for Use Classes A1 (shops), A3 (restaurants and cafes), A4 (drinking establishments), A5 (hot food takeaways).
Land Between Huntingdon Road And Histon Road, Cambridge Known As "Darwin Green One"
Cambridge
Application reference : 19/1056/REM
sound+fury // 1 thread
Application reference : 19/1022/FUL
Created by Debra Storr // 1 thread
Corn links delayed until 2020.
Link from Uni to Foresterhill not et wit a lot of support in discussions
Grampian Cycle Partnership
Created by Debra Storr // 1 thread
Sustrans sought suggestions for improvements
Created by Debra Storr // 1 thread
Plans in progress for cycleroute from Ellon to Aberdeen. Parts of route exist. Grampian Cycle Partnership involved with both Aberdeen and Aberdeenshire Councils.
sound+fury // 1 thread
Application reference : 19/1048/FUL
Created by Debra Storr // 1 thread
King St/Ellon Road is a main artery into Aberdeen. We are advised that the traffic volumes due tot he AWPR have reduced and in order to lock in this benefit there need to be some urgency to utilise freed up road space to more sustainable forms of transport.
And no - the parallel NCR1 isn't suitable. It's hilly with cobbles and have weird diverts. as a tourist route through the university and Old Aberdeen, its fine.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by kirbyjames // 2 threads
The primary route between Crediton and Exeter is the narrow and busy A377. It has been the site of at least one cycling fatality near Newton St Cyres.
An alternative route is possible using the lanes north of the A377 through Sweetham. However this route is compromised at both ends - at Exeter in the Cowley Bridge area and in Crediton by the approach along the A3072.
Development of a safe route is belived to be of high priority.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Richenda // 1 thread
Apparently TfL commissioned "...to explore the opportunity of a pedestrian river crossing ....". They may not think bikes should also be included, but they should!
http://www.telegraph.co.uk/luxury/travel/4162/a-garden-bridge-across-the-thames.html
http://www.gardenbridgetrust.org/index.html
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Robin Heydon // 1 thread
The Cottenham to Histon cycleway needs improvement.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.