Swiss Cottage
Large gyratory, which needs removal and replacement with cycle-friendly measures.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 2 threads
Large gyratory, which needs removal and replacement with cycle-friendly measures.
Created by Gregory Williams // 1 thread
Cycle parking is required at Bekesbourne railway station. The issue photo is evidence of this.
From the EIP programme for the South Area Committee, a proposal to put in a signalised crossing. (The report mentions Fulbrooke Road (which is in Newnham and not part of this patch) but I think it means here instead.) It's likely to get South Area Transport Corridor funding. No more details given.
Created by Rohan Wilson // 2 threads
Parcels either side of Spine Road's junction with Long Road, and one along eastern edge of housing, west side of proposed secondary school site. http://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=M5YZKKDX07900 Official deadline 19 July
12/0794/REM | Reserved matters for 231 dwellings (outline approval 07/0620/OUT) Parcels 1B, 2 And 5 Clay Farm, near Long Road
Created by Rohan Wilson // 0 threads
Cycle parking in lean-to's in rear gardens, access via narrow rear alleys, while cars are in front, across driveway. Site far behind Esso, Aldi and modern factory building. Deadline 25 July
Created by Rohan Wilson // 0 threads
"... office development adjoining Unex House (Savills), providing 5 storeys of B1(a) office space (4688m2) and two storeys of associated parking spaces (3102m2). Providing a total of 7790m2 gross internal floorspace of development. | Car Park Unex House 132 - 134 Hills Road..."
Created by cobweb // 1 thread
The proposal is to retain the CB1 café and reconfigure the two upper floors to include 10 studio flats.
Created by Rohan Wilson // 1 thread
New development:
Phase 1 reserved matters for the layout, scale and appearance of 201 dwellings, hard and soft landscaping and associated infrastructure and works including a means of access from Church Road
Martin Lucas-Smith // 10 threads
The route from the Royal Cambridge Hotel junction to Newmarket Road is a catalogue of hostile junctions, squeezed road situations, narrow cycle lanes, high collisions, and slow progress through this crucial part of the ring road. What is needed is a total overhaul of this route to add either a Danish or Dutch -style cycle route (2m+ could be achieved in most sections, with only one or two sections a squeezed 1.5m) that would encourage a massive shift of people from cars to bikes. To be clear: this is a proposal that a proper, strategic cycleway, that forms a coherent, uninterrupted route is needed, not bits of random infrastructure. See: http://www.camcycle.org.uk/newsletters/103/article4.html
Created by cobweb // 1 thread
I noticed today that there were notices on the racks outside Trinity College asking users to remove their bikes by 27th June but not giving a reason.
Martin Lucas-Smith // 1 thread
12/0783/FUL Barclays Bank, Bene't Street
Change to approved scheme 11/1421/FUL
to omit 21 bike store and replace with fitness room and laundry
Needs checking out.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area
Created by Gregory Williams // 1 thread
Overgrown vegetation encroaching on the cycle path.
Created by Gregory Williams // 1 thread
A dropped kerb is needed for the cycle path where it links to Star Lane at the back of the retail park, near Gordon Road.
Created by Jean Dollimore // 1 thread
Camden Council is planning to remove the Brunswick Square roundabout and replace it with a cross roads. They have support from Marchmont Street residents association. The space reclaimed from the roundabout will be added to Brunswick Square
This roundabout is on a north-south cycle route along Judd Street, Hunter Street, Lambs Conduit Street and Red Lion Street which is currently being improved by LB Camden and will soon be signed.
Some manoeuvres on the roundabout can be hazardous for cyclists and we have already told LB Camden that we support this scheme.
They have suggested various enhancements:
- raised table at the junction
- zebra crossings over all four arms
- raise the road north of the junction to footway level (a 'shared space')
- close Lansdowne Road to motors and make Grenville Street two way
We have been asked to tell them what would be the best scheme for cyclists, to suggest what to put in the space reclaimed (e.g trees, bike stands) and to provide a drawing.
See Camden's web page:
https://www.wearecamden.org/brunswicksquare/assets/documents/brunswick-square-roundabout-im-2
Created by Jean Dollimore // 1 thread
email received (30/6/12): I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
email receivedr: I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
email from Nick Miller: I thought I'd get in contact about the new Parkway junction with Camden High Street. I'm sure you have to use this route while riding through Camden at times and are therefore probably aware of the changes that have been made recently. Both motorists (in particular) and cyclists have suffered huge inconvenience over the last few months as the number of lanes have been halved at the bottom of Parkway where it meets Camden High Street. However, now it appears to be completed and I just cannot believe how poor the finished result is. Not only do the changes appear to have turned Parkway into a giant car park making it difficult and dangerous to navigate on a bike but the junction at the bottom has absolutely no room for cyclists to move at the side of the traffic and is an accident waiting to happen.
I cannot believe that such an important route has completely ignored the plight of cyclists at this time when cycling in the Capital is at an all time high. If you could shed any light on what is going on here and perhaps advise who I could write to at TFL or Camden Council about this, I would be most grateful.
(Photo to be added as soon as possible)
Created by Gregory Williams // 1 thread
The Drapers Mill cycle route sign should be pointing southward into Grosvenor Place, instead of eastward along Marine Gardens.
Created by Gregory Williams // 1 thread
The cycle route signs for the Canterbury High School to Archbishop's School cycle route are missing at each end of Harcourt Drive.
Created by Gregory Williams // 1 thread
This short section of cycle route needs cyclists to dismount for a narrow section of path. There's plenty of room to widen the path. The sightlines for crossing the road here could also be improved.
Martin Lucas-Smith // 3 threads
Two-way cycling needs to be permitted in streets in the Newtown area.
How can we welcome new students / visitors to Cambridge?
Ideas include:
* Stall events
* Welcome to Cambridge bike ride
* Talks
* Dr. Bike / Bike sale / Trade-in / Bike Harvest
Martin Lucas-Smith // 4 threads
Hills Road is not the best welcome to the City for cycling that it could be. It is congested, busy, with problems of cars in cycle lanes, and in general a poor streetscape.
Created by David Earl // 1 thread
The erection of 11 no. two bed flats, 206 sq m of commercial floorspace (A3) together with associated cycle parking and bin storage following demolition of existing single storey workshop.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.