'Quick Win' cycling permeability improvements in Westminster
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Dominic Fee // 1 thread
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
Created by Jon Warbrick // 1 thread
Cambridgeshire Insight have just released data from a set of 'smart' traffic sensors installed to monitor the effect of the Mill Road bridge closure: https://data.cambridgeshireinsight.org.uk/story/monitoring-impact-mill-road-bridge-closure
This data is particularly interesting because it provides classified counts of pedestrians, cyclists and various classes of motor vehicle in both directions across 15 locations in Cambridge.
Conversion and extension of 3 bed detached dwelling into 2 x 2-bed and 3 x 1-bed apartments including a part 3 storey, part 2 storey and part single storey rear extension incorporating balconies on 1st and 2nd floor, extension to roof from hip to gable, conversion of garage to living space and associated alterations. Erection of bin and cycle storage in front garden.
25A Mowbray Road Cambridge CB1 7SR
Cambridge
Application reference : 19/0698/FUL
Anon // 1 thread
Overview
We want to hear your views on the planned controlled parking zone for the Rotherhithe and Surrey Docks area.
Up to 3,000 new homes in the area mean that a controlled parking zone is essential - in particular, this is the only way to enforce the permit-free planning conditions for the Canada Water development, and prevent intolerable additional parking pressures.
Anon // 1 thread
We are consulting on creating two way streets in the Lower Road area and Cycleway 4.
The existing road layout creates a sense of motor-vehicle dominance, one way streets encourage fast vehicle speeds, which adds to unpleasant conditions for both pedestrians and cyclists.
Anon // 1 thread
Overview
We are consulting on creating a cycleway in the Rotherhithe area.
Future cycling demand is predicting there will be a significant desire to\from Peckham and beyond, with up to 150 cyclists using the route during the peak period, in the event of a free ferry crossing being developed.
We have developed proposals to link Cycleway 4 and Quietway 14 as a first phase and we are exploring potential connections towards Peckham.
Anon // 1 thread
Transport for London has awarded Southwark funding to improve streets in South Bermondsey to make this a more “Liveable Neighbourhood”. The council wants to hear your ideas on how to spend £30,000 this year to improve the look and feel of your streets and make it easier to walk and cycle.
Improvements could include new crossing points and other safety features, new green spaces, cycle routes or cycle parking.
The council also plans to bid for more money for the next year three years to provide more street improvements and to make this area even more pleasant and healthy for you and your family.
Created by John Chamberlain // 1 thread
From late July till end November, Robert Street will be closed between Stanhope Street and Hampstead Road for HS2 related water main replacement. All traffic including cycles will be diverted.
Update October 2019: Works extended to end of year.
Created by FrenchyF // 1 thread
It can take up to 5 minutes to cross from the east side of Little France Drive to the west side of ODR, as there are four stages of pedestrian crossings.
Created by Simon Still // 1 thread
In the last three years, there were 61 collisions, with 71 casualties, 19 of which were people cycling and eight of which involved pedestrians. (Data available up until the end of November 2018).
The scheme aims to address identified and perceived safety concerns at these junctions, as well as at George’s Road and the turning into the petrol filling station south of Palmer Place. The scheme will introduce new, signalised pedestrian crossings at the Drayton Park/Palmer Place junction, replace the zebra crossing at the junction of Liverpool Road with a signalised crossing and simplify all the existing staggered crossings to straight across crossings at the Hornsey Road/Hornsey Street junction.
We consulted on a proposal that sought to deliver signalised pedestrian crossings at Drayton Park/Palmer Place and Liverpool Road in 2010. This was not taken ahead because of concerns raised during the consultation about the impact of the scheme on local roads arising from proposed banned turns. This consultation was also launched shortly after the recently opened Emirates stadium, the effects of which were felt to have an impact on the response to the consultation. When developing our new proposal we took this feedback into account and have now amended the scheme to address these concerns. The details can be found below.
Our proposals
We would like your views on the following proposals which aim to provide new signalised crossings and address identified safety concerns.
We propose to provide new, signalised pedestrian crossings at the Holloway Road/Palmer Place/Drayton Park junction and the Holloway Road/Liverpool Road junction. The existing signalised pedestrian crossing outside the London Metropolitan University Clocktower building would move south and be brought into the new junction.
We propose to simplify the Holloway Road/Hornsey Street/Hornsey Road junction. We would convert the existing staggered signalised pedestrian crossings to straight across crossings. We also propose to remove the small triangular pedestrian island and slip road into Hornsey Road to create more space for people walking, reduce the crossing distance and simplify traffic movements.
To allow for the proposed crossing changes to be introduced, changes to some bus stops, loading bays and parking locations between Hornsey Street/Hornsey Road and Ronalds Road would be required.
To provide the new crossings, we propose to make changes to some permitted turning arrangements for traffic at the Drayton Park/Palmer Place and Liverpool Road junctions. All movements through the area would still be possible in the new road layout, but it might be necessary for road users to take a different route. These changes are necessary to allow the crossings to be delivered without displacing traffic on to local roads.
In detail:
We need to remove two trees to ensure the new signals at Liverpool Road are visible to drivers. We have identified locations to plant new trees elsewhere within the scheme extents, subject to ground conditions.
We propose to change the traffic signals at the Drayton Park/Palmer Place junction so that the side roads run separately to reduce the risk of conflict between road users at this junction.
To provide the new pedestrian crossings at the Drayton Park/Palmer Place junction and on Liverpool Road, all the junctions in the scheme must be addressed together. This is to ensure the road network operates effectively in this area for all users.
Traffic modelling
Our traffic modelling data shows that the overall effect of our proposals on buses is generally neutral. The majority of bus routes will experience a change in journey time of between 0 and 30 seconds, however there are also some considerable improvements, of up to 5 minutes, expected for buses using Liverpool Road in both directions, particularly during the PM peak. There is an overall small impact on northbound general traffic, with improved journey times for southbound general traffic. These impacts result from the need to balance the network for all vehicular modes affected by the proposals.
Bus service changes
As a result of changes to the turning movements at the junction of Palmer Place to Holloway Road, we are also proposing to reroute the 153 bus route in a northbound direction from Palmer Place on to Liverpool Road. This is required because of the changes at the Palmer Place junction but is also expected to increase reliability and simplicity for passengers.
Cycleway consultation
The London Borough of Islington, in partnership with Transport for London, are also currently consulting on a new Cycleway adjacent to this scheme. The new Cycleway will connect Finsbury Park and Highbury Fields, where the improved route will help cyclists cross Holloway Road at the existing cycle crossing at Fieldway Crescent. More details are available at: www.islington.gov.uk/highburycycleway.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
Created by Matthew // 1 thread
The central portion of Hills Road seems to be a kind of 'forgotten' area, with nothing more than narrow mandatory cycle lanes in miserable shape, and terrible junction design for people walking and cycling.
If GCP is looking for an area that needs improvement, this is one that needs doing, and it is fairly central and high-profile.
Created by David Lincoln // 1 thread
Compton Street (from Agdon Street to Goswell Road) and Cyrus Street - School Street Scheme
St. Peter & St. Paul Catholic Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around St. Peter & St. Paul Catholic Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Compton Street and Cyrus Street?
The proposal is to trial a temporary road closure on Compton Street (from Agdon Street to Goswell Road) and Cyrus Street into a School Street Scheme between 8.30am to 9.15am plus 2.45pm to 3.45pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Moreland Street, Pickard Street and Gard Street - School Street Scheme Moreland Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Moreland Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Moreland Street, Pickard Street and Gard Street?
The proposal is to trial a temporary road closure on Moreland Street, Pickard Street and Gard Street between 8.30am to 9.15am plus 3.00pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Noel Road (from Danbury Street to St Peter’s Street) - School Street Scheme
Hanover Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Hanover
Primary School and create a safer, more pleasant environment for everyone. The Council would like to
hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and
cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools
this will help to reduce congestion and pollution at the school gates as well as make it easier and safer
for children to get to and from school.
What is proposed for Noel Road?
The proposal is to trial a temporary road closure on Noel Road (from Danbury Street to St Peter’s
Street) between 8.30am to 9.15am plus 3.15pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an
exemption. Residents and businesses who live and work on a school street will be able to register for
an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at
weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered
vehicles entering the street during the times of operation may be identified by camera and issued a
penalty charge notice.
Hanover Primary School is being looked at as part of the wider School Street Scheme Programme
across the borough. An 18 month trial is proposed. The Council will be working with the school and local
community to develop the scheme.
Change of use from 8 bedroom guest house (Use C1) to 9 bedroom guest house (Use C1) and associated refurbishment works including:- installation of roof lights, replacement canopy, installation of railings and dwarf wall to front elevation and cycling parking.
4 Huntingdon Road Cambridge CB3 0HH
Cambridge
Application reference : 19/0830/FUL
Created by Anoop // 1 thread
Minor roads in Kenton such as Kingshill Avenue are used inappropriately by through traffic. This is a consultation on options to reduce through motor traffic whilst maintaining access for walking and cycling
Created by M Stanley // 1 thread
Leeds city council are proposing to reduce the speed limit from 60mph to 40mph
Created by Marcus Howarth // 1 thread
Doing a quick scan of the document see some enoughing comments on segregated cycleway in high st, parking and a cycle networks.
Unfortunately skip to the table at the end and it seems to be Medium to Long term objectives so real actions lacking.
see p53 Guideline SS4: The Northern Side of the High Street
Any redevelopment should take the opportunity to create a
segregated cycle path parallel to the High Street.
p61
7.29 Assisting a shift to more sustainable modes of transport would also be
beneficial. Expanding the cycle network to create a segregated cycle way and
increasing the pedestrian access and wayfinding for pedestrians to and from
the High Street and Grove Park would also be welcome by-products, should a
comprehensive redevelopment of the north side of the High Street take place.
Guideline G9: Traffic and Transport
The council will seek to improve the cycling network and pedestrian
network throughout the Conservation Area as opportunities arise.
Temporary highway works on the northern side of Newmarket Road for a period of up to five years.
Land north of, NEWMARKET ROAD, Cambridge
South Cambridgeshire
Application reference : S/1605/19/FL
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.