SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
Removal of hazardous barrier on cycle path ending on Rose Lane; making turns from road onto path very hazardous!
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by North Devon Cycling Forum // 0 threads
Removal of hazardous barrier on cycle path ending on Rose Lane; making turns from road onto path very hazardous!
Created by North Devon Cycling Forum // 0 threads
Removal of hazardous barrier bars and severe cutting back of bushes on Hollowtree Cycle path; this is an hazarous obstruction on this narrow passage which gets intensely used.
Created by North Devon Cycling Forum // 0 threads
Severe cutting back of bushes on Hollowtree Cycle Path; this is an obstruction on this narrow passage which gets intensely used!
Created by North Devon Cycling Forum // 0 threads
Hazardous side road crossing Coney Avenue on Hollowtree Road, priority change required; turning drivers should give way to cyclists!
Created by North Devon Cycling Forum // 0 threads
Button Toucan Crossing Hollowtree Road not working (Lidl side, button north side)
Created by North Devon Cycling Forum // 0 threads
The Square: signage required to guide cyclists into subway (for Town Centre, Braunton and Tarka Trail) and onto Square (for Sticklepath via Long Bridge and bike parking "The Square")
Created by North Devon Cycling Forum // 0 threads
Rock Park corner: arrow on cycle path to direct cyclists onto road before the New Road Roundabout. This to clarify cycling route FROM Town Centre TO Newport.
Created by North Devon Cycling Forum // 0 threads
Replacement of last yellow “No entry to the Square from 23rd May” sign on Glouster Rd by signs with just “No entry to the Square”.
This makes clear that traffic calming of the Taw Vale route in favour of sustainable transport is PERMANENT and not temporarily!
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by North Devon Cycling Forum // 0 threads
Open or remove barrier to make use of Richmond Street as connecting route easier
Created by North Devon Cycling Forum // 0 threads
Gate under Western Bypass was closed two years ago, only to annoy cyclists? Incovenenient and annoying; re-open gate please!
Created by North Devon Cycling Forum // 0 threads
Removal of annoying gate on ramp Western Bypass-Tarka Trail; where is the cattle which needs to be held back by this gate?
Created by North Devon Cycling Forum // 0 threads
Surface and lighting improvements route Rugby Ground Alley Way/Car Park
20 mph speed limit on Fair View Road/Pilton Quay between Abbey Road and Pilton Causeway (Yeo Dale Hotel)
Upgrade footpath on river bank to shared path (with new shared path signs), making the full connection between Abbey Road and Rolle Quay.
Created by North Devon Cycling Forum // 0 threads
This NCN sign on North Walk has been wrong aligned for several years! "Welcome to Barnstaple"; great impression for visitors on NCN3 and NCN27!
New high-profile bike parking at main entrance Civic Centre
New bike parking Boutport Street at Green Lanes shopping entrance
New bike parking Boutport Street near Post Office/Butchers Row (also to reduce illegal pavement parking!)
New bike parking Church alley way (next to co-op on High Street); info signs at this location already regularly informally used as stands
More capacity bike parking Cattle Market (end of Holland Walk)
Re-allocate benches and bike-park on pavement next to the Square and removal of first taxi rank space; all required to create a logical off-road route connecting Boutport St
Allow cyclists to cycle on pavement next to the Square FROM Boutport Street TO The Strand
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn right from Boutport Street onto Boutport Street (in front of the Post Office) - arrow signage on tarmac?
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn left from Butchers Row onto Boutport Street (current sign only allows taxis to do this!)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.