20/03704/FUL: 1no. dwelling, Lovers Walk, Cambridge
Demolition of existing car port and storage area and erection of 1no. dwelling and associated curtilage
Land Adjacent 1 Lovers Walk, Cambridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of existing car port and storage area and erection of 1no. dwelling and associated curtilage
Land Adjacent 1 Lovers Walk, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use from a small house in multiple occupation (C4) to a large house in multiple occupation (sui generis)
102 Chesterton Road, Cambridge, CB4 1ER
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Demolition of 1 no. building (Barmore) and erection of a four-storey building providing student accommodation, college cafe and social learning space, ancillary facilities and external works.
Lucy Cavendish College, Lady Margaret Road, Cambridge, CB3 0BU
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of a one bedroom bungalow and associated works, 17 Mere Way Cambridge CB4 2JP
Created by M Stanley // 1 thread
Traffic regulation orders for the A647 Bus priority scheme.
Proposals for trial infrastructure along the A660
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03519/FUL | Change of use of an existing two-storey residential extension to form a separate two-bed dwelling. | 72 Ramsden Square Cambridge CB4 2BL
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03535/FUL | Demolition of existing and construction of eight dwellings and associated external works | Good Technology 355 Newmarket Road Cambridge CB5 8JG
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/03501/FUL | Demolition of existing garages and hardstanding and the construction of 7 No. modular homes. | Land At Barnes Close Cambridge CB5 8RR
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The government said that it expects Combined Authorities to lead the restart of the transport system following the Covid lockdown. The Transport Restart Group is chaired by the Combined Authority (its leads are James Palmer and Paul Raynes) and brings together the two highways authorities, police and public health colleagues, the two main city councils, a representative bus operator, Network Rail, Highways England, and the Department for Transport. It has met weekly since 1 June.
The group has three main tasks:
(a) ensuring the public transport restarts to as near 100% of pre-Covid network as possible;
(b) ensuring a package of active travel measures is implemented to mitigate potential increases in private car use;
(c) monitoring data in relation to the impact of Covid – 19 on transport and considering what further measures might be needed to maintain the transport recovery.
Outline Planning with all matters reserved, except for the vehicular accesses onto Station Road, for the demolition of a single dwelling and associated buildings and development of up to 107 dwellings (including affordable housing) and employment/ community/ cafe/ development together with parking areas, landscaping and all associated infrastructure.
Land West Of Station Road Longstanton Cambridge CB24 3DS
Cambridge
Application reference : 20/03598/OUT
Created by Roxanne (CEO) // 1 thread
Redevelopment of office building
Created by Steven Moseley // 1 thread
"We’re widening the A12 between junction 19 (Chelmsford) and junction 25 (A120 interchange) to ease congestion and cope with increasing traffic demands."
Created by Steven Moseley // 0 threads
This single carriageway section of the A120 is regularly very busy and there have long been calls for it to be improved, as the section between the M11 and Braintree was in the early 2000s.
ECC has worked up and consulted on its favoured route to "create a modern dual carriageway link connecting Braintree and the A12" to recommend to Highways England.
Given that the proposed route bypasses the current A120, there should be scope for improving provision for cyclists and pedestrians both along the new road and along the newly de-prioritised `old'-A120, especially around Marks Tey and its station.
Construction is currently slated for 2023-6.
Created by Simon Still // 1 thread
https://www.lcc.org.uk/articles/finding-your-way-on-londons-cycle-infrastructure-1
none of the apps that use OpenStreetMap as a base - Citymapper, Cyclestreets and Cycle.Travel amongst them - offer a great user experience and they all tend to prioritise complex back street rat run routes over Londons main road infrastructure. There's a real need to tweak these app routing algorithms so that new cyclists can benefit from the high quality infrastructure thats being built.
In future theres also the potential to do more with OSM - we would love to see “accessibility graded” routing as a future capability using information about path surfaces, gradients or things like width restrictions that are a problem for some types of cycle or rider
Created by John Chamberlain // 0 threads
From 17th August to 2nd October North Gower Street will be closed to all except pedestrians at the Euston Road junction. This blocks the signed cycle route between the Hampstead Road and the Euston Road pop-up lanes.
Created by John Chamberlain // 0 threads
From September 14th for 6-8 weeks, Tavistock Place will be closed to motor traffic between Herbrand Street and Marchmont Street. Cyclists will be diverted into the main carriageway.
20/03254/OUT | Outline planning with all matters reserved except for access for redevelopment of land for 44 residential units with public open space provision, landscaping, means of access and associated works following demolition of No's. 30 and 32 New Road, Over - Resubmission of S/1279/18/FL | Land At And To The Rear Of 30 & 32 New Road Over Cambridgeshire
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Conversion of garage to habitable space and erection of bike store in front garden.
2 Wilding Walk Cambridge CB4 1RH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Construction of Community Cafe.
Chesterton Methodist Church, Green End Road, Cambridge, CB4 1RW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Erection of 2no. 1.5 storey dwellings and retention of existing flats, together with bin & cycle store and landscaping.
30 Davy Road Cambridge CB1 3QW
Created by Steven Moseley // 0 threads
EIA Scoping Opinion Request for a new link road between the A120 and A133 comprising dual two-lane carriageway; at grade junction connecting the proposed link road to the A133; two potential intermediate roundabout locations giving access between Allen’s Farm and the Garden Community development, and Tye Road (NW) and the Garden Community development; an underpass for future proposed Rapid Transit System and a diverted public right of way (PRoW); one grade separated dumbbell junction (two roundabouts linked by a single bridge) connecting the link road to the A120; new access road to Colchester Waste Transfer Station north west of the proposed A120 junction; and new two-way access to an existing petrol station west of the proposed A120 junction
Land between the A120 and A133, to the east of Colchester and west of Elmstead Market
Essex
Application reference : CC/TEN/94/20/SPO
sound+fury // 1 thread
This unusual application is just for the cycle parking and bollards for the former Sally Ann's shop.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
The Cambridgeshire and Peterborough Road Safety Partnership has been renamed 'Vision Zero Partnership' for the next stage in its strategy, spanning 2020-2030.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.