21/00027/FUL: change use to 8 bed HMO and a 2bed flat, 1 Hurrell Road, CB4 3RQ
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/05396/FUL
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).
Trinity Hall Farm Industrial Estate, Nuffield Road, Cambridge, CB4 1TG
Created by Jean Dollimore // 1 thread
The Camden Square area is bounded by Camden Road, Camden Park Road-York Way, Agar Grove and St Pancras Way. Most of this area already benefits from some road closures made in the 1970s at junctions with Agar Grove (St Augustines Road, St Paul’s Crescent and Stratford Villas) and at junctions with Camden Road (Rochester Square and Cantelowes Road). But Murray Street is still used as a rat-run between Camden Road and Agar Grove.
This consultation focuses on
The rat-run reduction scheme proposes two filters:
The proposals for improving the cycle route are:
Created by Marcus Howarth // 1 thread
The plans involve East/West road with multiple signage for entry/exit of 20/30mph zones plus the Byway cul-de-sac.
Plan (pdf) is embedded on consultation page.
To the North of route shown in blue is existing 20mph
This forms part of the NCN77 route.
Created by Marcus Howarth // 1 thread
The draft document is linked right at the bottom of the consulation page, again here
https://drive.google.com/file/d/15a9o8nCb5R9rs5iPINp8M2zrr3Qm-Axr/view
from 1.3
Everyone benefits from sustainable transport because it means that we are:
• Keeping the air cleaner through alternative travel choices, such as walking, cycling to work, using public transport or using electric vehicles, while improving public health;
• Improving safety for travellers, especially for people with disabilities, children, older residents and other vulnerable road users such as pedestrians and cyclists;
1.13 In July 2019, the London Borough of Sutton declared a climate emergency, and pledged to make the borough carbon neutral. Air quality improvements and carbon reduction are byproducts of, and some of many reasons for, sustainable transport.
from section 4
Cycle mode share is low, 1.1% of all journeys and among the lowest share in London.
5.7 Essentially, more people in Sutton are choosing to use their car for journeys of less than 2km than anywhere else in London.
See Section 6 re. cycling.
6.12 The existing number of cycling trips made each year in Sutton is 7,700, out of a total in outer London of 208,200 trips.
However, there is a potential for 234,900 daily cyclable trips, which would mean that 3% of all borough journeys would be by cycle. This
figure is higher than boroughs of similar size and population such as Harrow, Merton and Richmond upon Thames.
6.13 As with walkable trips, Sutton also has the highest number of potentially cyclable trips per resident that are currently made by a motorised mode of travel22.
Targets include
Appendix F : no mention of cycleways
also saw under Developer checklists:
Cycling
G6g) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the place-based projects in the Sutton Public Realm Design Guide Supplementary Planning Document (adopted January 2020).
G6h) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the Liveable Neighbourhoods schemes and to bid for and implement future schemes where possible.
Created by Steve Crapper // 1 thread
An obvious link between the very well publicised and used Brierley trail and Skegby Trail is required in this plot of land to enable circular routes to be created
Created by Steven Moseley // 1 thread
Created by Jean Dollimore // 1 thread
All of the schemes operate timed road closures on Mondays to Fridays e.g. from 8.15am-9.15am and 3pm-4pm in term time.
In all but one of the schemes, it is stated that the restrictions will be enforced using Automatic Number Plate Recognition (ANPR) cameras.
Each scheme would be introduced as a trial for a maximum of 18 months with a further consultation After 12 months.
Exemptions: properties and businesses in the closed section of the affected road, emergency services, bin lorries, blue badge and pupils of the school that have a disability that prevents them from using active travel.
A few nice surprises here, marked with asterisks ***
Brookfield School
A Healthy School Street on Croftdown Road, between the junction with Chester Road and the east side of the junction with St. Albans Road.
And close with planters and bollards the west side of the junction Croftdown Road/ St Albans Road
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-brookfield/
Kentish Town Church of England Primary School
A Healthy School Street on Islip Street, from Frideswide Place to the junction with Hammond Street.
*** Create a permanent restriction on Hammond Street by placing planters halfway between Islip Street and Caversham Road.
Temporary widening of footway outside school. Why temporary?
Removal of some guard rails
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-kentish-town/
Christopher Hatton Primary School
1. A Healthy School Street On Mount Pleasant, between the junction with Grays Inn Road and the junction with Elm Street.
No mention of the use of ANPR cameras.
*** 2. Make permanent the trial scheme in Laystall Street north of Rosebery Avenue which implemented a mid-point closure and allowed two-way cycling.
Consultation on Camden’s website
Argyle Primary School
A Healthy School Street road on Bidborough Street, Hastings Street and Tonbridge Street.
*** The one-way systems on all three streets would remain in place, with the addition of a contraflow for cycles.
Consultation on Camden’s website
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-argyle/
St Mary and St Pancras School
A Healthy School Street on Polygon Road between Chalton Street and Werrington Street.
Consultation on Camden’s website:
Ecole Jeanine Manuel
A Healthy School Street on the south side of Bedford Square which is one-way westbound.
from the junction with Bloomsbury Street to Adeline Place
*** Add a contraflow cycle lane to the southern side of Bedford Square
Consultation on Camden’s website:
Created by Jean Dollimore // 1 thread
The proposal is to made a Tiger crossing over Mansfield Road between Estelle Roads and the cut-through to Elaine Grove. This will replace the existing zebra crossing. The following supporting measures are also proposed:
The improvement of this crossing is in preparation for the extension of C6 from Kentish Town via Castle Road, Castelehaven Road and Grafton Road to reach Hampstead Heath at Savernake bridge.
Implement on 18 month ETO,
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to large HMO (8 bed) including conversion of existing garage to make the 8th bedroom with ensuite.
189 Arbury Road, Cambridge, CB4 2JJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00182/PRI03O | Prior approval for change of use of offices (Class B1(a) to 3 No. dwellinghouses (Class C3)
175-179 Newmarket Road, Cambridge, CB5 8HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04992/FUL: Conversion of bungalow to a two storey dwelling comprising of 4 flats
538 Newmarket Road, Cambridge, CB5 8LL
Created by Jean Dollimore // 1 thread
This scheme is intended to reduce through traffic on King Henry’s Road and Elsworthy Road, both of which have ~ 2000 motor vehicle movements per day in each direction, 74% of which is through traffic. In addition, average speeds are well in excess of 20 mph.
To stop the rat-running and to reduce the traffic volumes and speeds on King Henry’s Road and Elsworthy Road, Camden proposes the following point closures:
In addition, Camden proposes:
It's hard to know where (and when) all the future cycling-related developments are, so a map showing them could be very useful. This issue is to discuss this idea, if it is useful, or already exists somewhere, and how it might be done.
20/05040/FUL | The erection of a new building comprising E(g) floorspace with car and cycle parking, landscaping and associated infrastructure | Land To The West Of Peterhouse Technology Park Fulbourn Road Cambridge CB1 9NJ
Created by Steven Moseley // 1 thread
Development of 102 dwellings with associated parking, landscaping, open space, drainage and infrastructure and the formation of a vehicular access onto London Road
Created by Roxanne (CEO) // 1 thread
Issue to collect various government strategies related to transport that might impact cycling but are not specifically related to cycling.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by George Coulouris // 1 thread
The proposals will trial a motor traffic-free environment that reduces traffic volumes and speeds, supports the existing market and local businesses, and allows more space for social distancing, walking, and cycling. The proposals also include measures at the junction of Queen’s Crescent and Grafton Road to prevent rat running traffic from using Grafton Road and Vicar’s Road and create a safer and quieter environment for residents in that area.
Camden have announced a consultation trial closures of Queen's Crescent (the market area) and Grafton Road. The resulting reduction in motor traffic will improve cycling conditions massively on Grafton Road in particular and in adjacent streets to a lesser extent. This, in conjunction with this scheme including the closure of Anglers Lane (decision to go ahead) should result in a sizeable LTN in all but name.
The contra-flow (westbound) cycle lane on Plender Street has been closed by the building works to the former Methodist Chapel. There is signage up saying "cycle lane closed".
Created by George Coulouris // 1 thread
Change of use from industrial (Class B2) to flexible industrial (Class B2)/ storage or distribution (Class B8)/ light industrial (Class E),
If this is approved it will result in a continual flow of vans all day on Holmes Road and Grafton Road, both of which are already overloaded with traffic and have primary schools on them. Grafton Road is part of a Cycling Quiet Way between Camden Town and Highgate also connecting to Hampstead Heath (Constantine Road) and it is planned to upgrade this route to be part of cycleway C6
We intend to submit an objection to the application and to coordinate our response with Inkerman Area Residents Association.
Below is a first draft for our response. Please comment and suggest further points for inclusion.
Created by JohnP // 1 thread
The Office of Road and Rail has put out a Consultation on ‘Principles for managing level crossing safety’. See https://www.orr.gov.uk/sites/default/files/2021-01/consultation-on-principles-for-managing-level-crossing-safety-guidance.pdf
I became aware of this when checking out the reason why a stupid 'Cyclists Dismount' sign has appears at one of the Queen Adelaide level crossings. Dismounting on this narrow road that has lots of agricultural vehicle and heavy goods vehicles on it is unwise. On the other hand, the angle at which the rail track crosses the road eats up cycle front wheels regularly. But changing the nature of the hazard is not a sensible way forward.
Created by Roxanne (CEO) // 1 thread
There is a new Living Streets group in Cambridge.
To find out more visit: https://www.livingstreets.org.uk/get-involved/local-groups/cambridge
What can we do to help promote the group and support campaigns for more, better and safer walking?
Created by Jean Dollimore // 1 thread
Camden Council is consulting on changes to Baynes Street which will prevent motor traffic (except buses, emergency and refuse vehicles) from using Baynes Street as a cut-through between St Pancras Way and Royal College Street. They will be able to use Georgiana Street instead.
Baynes Street will be made two-way for all vehicles (including cycles) but no motor vehicles will be able to enter Baynes Street from Royal College Street. Motor vehicles can enter from St Pancras Way to access properties and some parking will be removed to facilitate turning round.
On St Pancras Way - a proposal to widen the northbound cycle lane and to remove the turning pocket.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Footpath 32 is to be converted to be a bridleway. The footpath runs at the edge of a field parallel to the Wheathampstead road from the Hertswood Forest car park entrance to Nomansland. It will have a garpack surface for cycling/walking and a larger strip of grass for horse riding.
Funding comes largely from a Paths For Communities grant with other contributions from local sources.
Created by mike1727 // 1 thread
The King Harry lane end of the Causeway route is currently a no cycling area, making the route less effective and dangerous since many people will cycle this part of the route regardless.
Action is required by HCC/SADC to plan and install a bridge and change the route to allow the full length to be used.
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)