12/0603/FUL | Construction of a cycle shed to existing car park area
80-cycle prefab shed using sheffield stands, replaces 7 car spaces. Need to check the application and welcome it if this is as positive as it sounds.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Martin Lucas-Smith // 1 thread
80-cycle prefab shed using sheffield stands, replaces 7 car spaces. Need to check the application and welcome it if this is as positive as it sounds.
Created by Heather Coleman // 2 threads
This is a planning application variation for 42 Fen Road, Milton. Application no (south cambs) is S/0756/12/VC
Permission had been given, but I noted as I passed the other day, that there was an application for a variation. Looking at this, one item seems to be to vary the "cycle storage".
From the description in Addendum to Design, Access & Herigage Statement in plans and docs:
I quote
"The bin / cycle store has been relocated and enlarged to allow for a tool shed. It was felt that
the proximity of the previous store to the proposed dwelling had an adverse impact on the
street scene and cluttered up the entrance area. By setting it back within the garden space it
was felt this would positively enhance the character of the area. Additionally, as a temporary
structure it is felt this would not have any more of an impact on the surrounding trees than
the current position of the bin store."
Or if you look at the map, the cycle "storage" (should that be parking?) now appears to be round the back end of the garden, and as a hedge is shown surrounding the car parked at the front of the property, I am at a loss as to how it would be at all convenient to ever get a bike out of this shed, rather than just getting into the car.
Of note is the fact that this proposed house is about 15 yards off NCN 11. In one direction*; this gives a virtually traffic-free route almost into Cambridge city centre or to Waterbeach railway station. In the other direction, NCN 11 heads through Milton Country Park, leading almost directly to the local Tesco superstore as well as to the Coston bridge, Science Park, Guided Busway. Thus, it could be possible to live an almost entirely car-free existence at this location.
*Fen Road is erroneously described as a cul-de-sac in the application. It is to motor vehicles, but is in fact a through route to the city centre for cycles and pedestrians.
From the 2004 South Cambs local plan
"To promote the use of more sustainable modes of transport, such as public transport,
walking and cycling by making such modes more accessible, safer and more attractive
to use.," and "To promote sustainable travel by ensuring new development takes place in highly
accessible locations."
" To limit the amount of car parking provided in new developments, where appropriate,
to reduce over-reliance on the car." "adopting on-site and/or off-site design features that promote
access by non-car modes as far as practicable (including
walking and cycling) and facilitate and encourage their use"
Of course there appears to be nothing about accessibility of cycle parking cf car parking, unlike the City Council local plan.
Is it worth putting in an objection? The publicity end date is 5th June.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by David Earl // 1 thread
Application to build a bridge over the brook to provide rear foot/cycle access to the school.
Martin Lucas-Smith // 1 thread
Speeding can be a problem on Granchester Road.
Created by Rohan Wilson // 1 thread
Existing building to be rearranged internally for surgery and medical admin. There is locked-away cycle parking for staff (quantity not spec), but none proposed for patients/ visitors. See thread for Sustrans' objection.
Created by Rohan Wilson // 10 threads
Turnstone, a consortium, is hoping to build a new town, to be named Denny St Francis, adjacent to Waterbeach (the barracks site, plus). Like any large development, cycling conditions need to be good.
Converting one-way streets to two-way cycling has long been a Cambridge Cycling Campaign priority.
Progress has been made, with Hope Street being made into a two-way street with a no motor vehicles exemption at one end.
Now that Except Cycles signs under No Entry signs are permitted there is scope for extending this to Romsey Streets.
Created by Klaas Brümann // 1 thread
South Cam is working on a cycling project between Haslingfield and Grantchester, proposed by the Haslingfield Parish.
Martin Lucas-Smith // 1 thread
The Cambridge East development is in the 2006 Cambridge Local Plan and would have a big effect on cycling and traffic more generally in the area.
Martin Lucas-Smith // 1 thread
The City Council will be designating Sheep's Green & Coe Fen as a local nature reserve in 2012, in recognition of the site’s value for both wildlife and recreation.
As part of the process, a management plan has been prepared to establish a long-term vision for the site and to guide ongoing maintenance and habitat-restoration works.
They are seeking public comments on the draft plan, prior to formal adoption and designation of the site.
It is important that the proposals are scrutinised to check whether this will have any effects in the longer term on cycling and path improvements.
Martin Lucas-Smith // 1 thread
Now that the East Road gas works have finished, the road has been patched up, but in a very bumpy way. Although the tarmac is smooth, it is not at the same height as the original road so riding along is continually bumpy.
Created by Rohan Wilson // 1 thread
A further application following several rejections.
Planning application to demolish 32-38 Station Road and build two office blocks. This is a revised application.
Application is called 'Fifty & Sixty Station Road'.
Documents are completely inadequate for this listed building. I submitted this objection:
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The application form indicates that there is currently no cycle parking and that none is intended. This is unacceptable - the development must conform to the Council's standards in quantity, location and type.
There are insufficient graphic details on which to assess the application.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We note that 3 Sheffield stands are shown within the cycle shelter - good provision for a site which is on the city's Signed Primary Cycle Network. It is important that they should not be installed too close to the rear wall, and that the spacing between each and between stands and side wall should meet the City Council's standards - see Cycle Parking Guide.
Only 3 bins are shown - is this acceptable, for recycling etc?
RW for Sustrans 3 May 2012
Objected.
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
We are concerned that there may not be sufficient space in the rear "bikes and bins" (unattractive combination!) room. It is important that the Sheffield stands indicated should be installed as shown, and to park or remove a bike, rearward space is essential (See the City Council Cycle Parking Guide), adequate as drawn. But only five refuse bins are shown, one for each apartment. Normally each would need 3 bins (black, blue, green), for which there would clearly be insufficient space.
RW for Sustrans 3 May 2012
Created by Rohan Wilson // 0 threads
This comment is on behalf of Sustrans, the charity that’s enabling people to travel by foot, bike or public transport for more of the journeys we make every day.
The documents state that cycle parking is to be increased to 4 spaces (staff) and 6 spaces (pupils), but gives no indication as to its type, location, or whether it is sheltered.
We consider the quantity to be provided seems unambitious, especially considering the site is in a quiet street close to routes on the city's signed primary cycle network. The cycle parking should be of Sheffield stands, convenient to the building's entrances, in a clearly visible location, and sheltered. See the City Council's Cycle Parking Guide for information.
We recommend that more spaces should also be provided, better to encourage a healthy alternative to car use. We note that the site is a listed building whose character and surroundings are not likely to be enhanced by full occupation of the "ample" car parking mentioned in the D+A Statement.
RW for Sustrans 3 May 2012
Created by Kevin Hickman // 0 threads
Poor provision for cycling in the submitted plans.
Created by David Earl // 1 thread
BBC R Cambs want to interview someone at 07.05 tomorrow (May 1) about the potholed condition of Mill Road.
Created by cobweb // 1 thread
Plans are mooted to paint directional signs on the roads in the city centre to alert bike users to the legal direction of travel.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Martin Lucas-Smith // 3 threads
Cambridge United are proposing a new stadium in Trumpington, near the Park and Ride site. Clearly this will have major traffic generation effects.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.