Lane Closure on Hampstead Road
From March 24th through March 30th the northbound carriageway on Hampstead Road between Varndell Road and Granby Terrace will be closed.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Chamberlain // 1 thread
From March 24th through March 30th the northbound carriageway on Hampstead Road between Varndell Road and Granby Terrace will be closed.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00537/FUL | Demolition of existing dwelling and erection of five dwellings and associated landscaping | 29 High Street Chesterton Cambridge CB4 1NQ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00284/FUL | Erection of a detached building containing 1no. 2-bed and 1no. 1-bed duplex apartments, with associated car parking and landscaping | 1 Maitland Avenue Cambridge CB4 1TA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00442/FUL | Two storey side and single storey front and rear extensions to create one, two bed flat and one, one bed flat | 5 Davy Road Cambridge CB1 3QW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00358/FUL | Refurbishment and extensions to the existing building to provide 2 no. commercial units (Use Class E) at ground floor with 6 no. flats to the rear and on the upper floors along with cycle parking, landscaping and associated infrastructure | 78-80 Cherry Hinton Road Cambridge CB1 7BH
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00526/FUL | Retrospective for the existing rear L-shape extension and change of use of dwelling from small HMO C4 to large scale 8 no. person HMO (Sui Generis), including use of the existing rear L-shape extension. | 2 Galfrid Road Cambridge CB5 8ND
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00220/FUL | Construction of 1no. Detached 1 1/2 storey dwelling to the rear of no. 579 Newmarket Road | 579 Newmarket Road Cambridge CB5 8PA
Created by Steven Moseley // 1 thread
Demolition of dilapidated GP surgery building and replacing it with state of the art new medical centre with staff accommodation on first floor, parking, cycle and waste storage and ancillaries.
Created by Steven Moseley // 1 thread
Full planning application for a two-storey temporary school building (640m2) and single-storey admin block (66m2) for Trinity School at Gilberd School as part of Alpha Trust including minor alterations to landscaping + hard standing.
Created by Steven Moseley // 1 thread
The ABRO site (now called the DSG) forms part of the Defence Estate and was used as a military vehicle repair facility. The site was vacated in about 2019 and has not been used since that time. The Defence Estates have decided to dispose of the site as it is no longer required for military purposes.
Created by Stuart Johnson // 1 thread
Barriers blocking shared path in Tollgate, Colchester for cyclists, wheelchairs, mobility scooters etc.
Created by Steven Moseley // 1 thread
East Suffolk and North Essex NHS Foundation Trust (ESNEFT) are preparing two planning applications for a proposed Elective Orthopaedic Centre and Northern Approach Road access at Colchester Hospital, Turner Road, Colchester. The public is invited to comment on the development proposals in a consultation between 1 March and 12 March 2021.
The detailed elements of the works involved with the Elective Orthopaedic Centre comprise:
The detailed elements of the works involved with the Northern Approach Road access comprise:
The new Northern Approach Road access point is proposed to be located to the south‐western corner of the site, and will create a clearer, more legible and direct access for staff, patients and visitors from the strategic network in line with other local hospitals in Essex, and will provide improved highway safety and environmental benefits to residents residing along Turner Road, as well as encouraging improved sustainable travel behaviours.
More information on the plans can be downloaded here
Your views are very important to help us develop our proposals. Please use the SurveyMonkey comments form here, or alternatively email your response direct to Sam Hazell samhazell@lppartnership.co.uk
The consultation period will run from Monday 1 March 2021 until 5.00pm on Friday 12 March 2021.
Created by Steven Moseley // 1 thread
"When Colchester council approved the plan, in about 2007, it insisted that all private motor traffic enter and leave the estate via an access on to the A134 (Cordelia Drive), near to the A12 but at the farthest point from the town centre. ...
A year ago, the developers, Mersea Homes and Countryside, decided they didn't like this arrangement and applied to scrap the bus gate. They hedged their bets and also asked to move the bus gate into their estate, giving 160 homes access to Mile End Road.
Colchester council rejected the scrapping of the bus gate but granted a temporary access for five years to be covered by a legal agreement.
The developers decided to go to appeal." (blog)
Created by Stuart Johnson // 1 thread
The new shared path that runs parallel to Severalls Lane has obstructive chicane barriers and cyclist dismount signs where the path crosses the drive to Whitehouse Farm.
sound+fury // 1 thread
Created by Stuart Thomas // 1 thread
Barriers restrict access for people of all abilities, e.g. hand cycles, buggies for carers with disabled children, and for this that wish to cycle.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Plans for erection of cycle shelter
93 Regent Street Cambridge CB2 1AW
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00188/FUL:
Erection of a two storey dwelling, with associated amenity space, parking, bin and cycle store following demolition of garage.
Land R/o 207 Cherry Hinton Road, Cambridge, CB1 7DA
Created by Diane // 1 thread
There is a proposal to build 35 new homes on Sandy Lane (described by the developers as 26 'family houses' and 9 'affordable homes').
The project has a website: https://yoursay.online/sandy-lane#about-the-project
At 6pm today (23rd February 2021) there will be webinar about the development (hosted by the developers).
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00264/FUL: Erection of two new buildings comprising Class E(g)i/E(g)ii floorspace including ancillary accommodation/ facilities with associated plant and cycle parking for Block F2 and an Aparthotel (Class C1) with multi-storey car park for Network Rail, including car and cycle parking, for Block B2 with associated plant, hard and soft landscaping and permanent access from Devonshire Road to the Cambridge Station Car Park, utilising the existing pedestrian and cycle access, restricted to emergency access to the railway only.
Blocks B2 & F2, Devonshire Quarter, Devonshire Road, Cambridge
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00038/FUL
Erection of new 2 bedroom 1.5 storey dwelling, associated works along with new parking/cycle parking following demolition of existing outbuildings
199-201 Cherry Hinton Road, Cambridge, CB1 7BX
Created by nix // 1 thread
The bike lanes across Marble Arch have long been chaotic and poorly marked. Confusion has been increased by the hurried COVID additions. I have found taking my 14 year old to practice learning to ride on North Carriage Drive scary.
I have heard our Chair despair on the subject before.
Specifically there are no clearly marked lanes on the Marble Arch island, through an area mobbed in Summer with visitors, and with a table tennis table on the intuitive route. But a chance has emerged - see below. Link via Westminster web-site to oxfordst@westminster.gov.uk.
Views are sought to "stakeholderteam@murphycareyjv.co.uk by Friday 19 February
sound+fury // 1 thread
New 2 bedroom house being built close to an existing property.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.