Bicycle Culture
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by velocipedus@gmail.com // 12 threads
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
Created by Rohan Wilson // 2 threads
Next meeting is Thursday 6 Dec at Trumpington Village Hall
(Informal Drop-In 15:30 - 18:30, followed by Forum 19:00 - 20:30)
Though the above page indicates it's about residential developments, Addenbrooke's was covered in a presentation on previous 6 Sep meeting. Bell School was not covered.
The main discussion was around schools and young people.
Created by cobweb // 32 threads
e.g.
https://www.gov.uk/government/news/cash-boost-to-get-england-cycling--2
Govt announces £20 million for cycling infrastructure improvements.
Marshall reveals plan for 1,500 homes
http://www.cambridge-news.co.uk/News/New-plan-for-1500-homes-27112012.htm
Created by George Coulouris // 1 thread
Camden are contemplating a re-design of this junction (the one adjacent to Mornington Cresent Station). We hope to get in early and try to ensure that the junction and its surrounding streets are made as safe and pleasant for cycling as possible.
This CycleScape issue is intended as a forum for discussion of improvements or a total redesign.
Martin Lucas-Smith // 2 threads
There are rumours that the AJC will be scrapped.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jim Chisholm // 5 threads
There is a suggestion of a group looking at issues for those cycling in the A10 corridor between M11 J11 and Royston. This is, in part about cycling along the corridor, but mainly about access between villages and access to rail stations. Of course the A10 north of Cambridge has LSTF money, but there are currently few funds available for improvements in this area.
Created by David Earl // 1 thread
Road closures - but will cycle parking be OK?
Created by velocipedus@gmail.com // 1 thread
Forwarded message:
I noticed that half of the bicycle shelter was fenced off, and I wondered whether we may be getting some new racks. In Connect I read the Trust was considering two tier bike racks so I was half expecting we would get these. Today however I learnt that the area will be transformed into a smoking shelter! Is this true?
I think it is fair to state 30% of the people working in the S-block cycle into work. Losing half of our cycle parking facilities is not very helpful. The area is heavily used and often overflowing with bikes.
If the area will indeed be turned into a smoking shelter, can you please explain why this decision was made and why it was not communicated to the staff concerned?
This is outrageous and a good press story. Robin - are you up for this?
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals for further safety improvements at the junction of Battersea Park Road and Havelock Terrace. This follows the introduction of a new signalised pedestrian crossing and cyclist Advanced Stop Line at the junction in June 2012.
Why We Are Consulting
About the proposed changes:
Our review of the current junction layout showed that the two narrow general traffic lanes on Battersea Park Road southbound mean that cyclists are sometimes squeezed towards the kerb by motorists. It also identified conflict between cyclists and motorists merging across lanes when approaching the junction southbound from Battersea Park Road.
Our proposed improvements have been designed to address the above issues. They include:
A new central cycle lane to help cyclists turning right from Battersea Park Road into Prince of Wales Drive. This would mean two lanes of traffic on the southbound approach from Battersea Park Road instead of three. These proposals may mean a slight increase in journey times at busy periods.
One wider southbound general traffic lane on the Battersea Park Road exit instead of two narrow ones. This would reduce the likelihood of cyclists being squeezed against the kerb by motorists
A new traffic island at the junction of Prince of Wales Drive to segregate westbound cyclists and motorists
New sections of eastbound and westbound mandatory cycle lane on Prince of Wales Drive to provide more space for cyclists. The eastbound cycle lane would replace one of the general traffic lanes on the approach to the junction
Widening the existing mandatory cycle lane on Battersea Park Road (northbound) to provide more space for cyclists
Removing the existing yellow box marking from the junction, as the proposed new lane layout would mean it was no longer needed.
Please click here to see the attached map for further information on our proposals. We plan to start work in late December 2012.
How to comment on the proposals:
Please let us know your views completing the online consultation form below by 30 November 2012.
About the Better Junctions programme:
TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.
https://consultations.tfl.gov.uk/betterjunctions/battersea-park
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals to improve conditions for pedestrians and cyclists at the junction of Mile End Road and Burdett Road.
Why We Are Consulting
About the proposed changes:
Our review of the current junction layout showed that there is an above average level of collisions involving pedestrians and cyclists coming into conflict with turning vehicles.
The proposed improvements are shown on the attached plan and include:
Removal of the slip roads to reduce the potential for conflict between vehicles and cyclists.
Reducing crossing distances and number of crossings for pedestrians
New mandatory cycle lanes on Mile End Road and Grove Road to allow cyclists easier access to the advanced stop line.
Increased cycle parking around the junction.
Wider traffic islands, new trees and levelled footways.
New street lighting system to be combined with traffic signals to create more space on the footways.
To incorporate the above benefits, we will also need to change the traffic lights operation to allow vehicles to exit Grove Road and Burdett Road at the same time.
Please click here to view the map for further information on our proposals. We plan to begin works in early 2013.
How to comment on the proposals:
Please give us your views by completing the online consultation form below. You can also contact TfL’s Consultation Team at: STengagement@tfl.gov.uk. Please let us know your views by 10 December 2012
About the Better Junctions programme:
TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.
https://consultations.tfl.gov.uk/betterjunctions/mileendburdett
Created by cobweb // 1 thread
An application to extend the cycleways within the West Cambridge site including some shared use paths.
Created by cobweb // 1 thread
http://www.dft.gov.uk/news/press-releases/dft-press-20121109a
A DfT consultation to see whether speed limits on single carriageways should be introduced for HGV's. This will clearly have implications for cycle safety.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we are developing proposals to improve safety at the junction of Tower Bridge Road and Abbey Street.
What we’re proposing and why
We are proposing to ban the left turn from Tower Bridge Road into Abbey Street to reduce the potential for conflict between cyclists and left-turning vehicles. Traffic counts show that fewer than 4 vehicles per hour make this turn at peak time.
We intend to ban the left turn towards the end of December 2012 and will advertise the changes to the Traffic Order in November.
Other planned changes at the Tower Bridge Road/Abbey Street junction
We are also developing proposals for more substantial improvements for cyclists and pedestrians at this junction, including improved pedestrian crossing facilities. More information will be available early next year, once these proposals have been developed further.
Earlier this year we marked-out Advanced Stop Lines (ASLs) in green and put blind spot safety mirrors on the signals at the junction so cyclists are more visible to vehicles turning.
Please click here to view map for further information on the proposals.
Have your say
Please give us your views by completing the online consultation form below by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/tower-bridge-abbeyst
Winter gritting is essential for many cycleways and there have been problems in recent years.
Created by Matthew Phillips // 2 threads
There are no cycle racks at the main car park for the University Botanic Gardens. There is plenty of car park space, so some of it could be converted to have cycle racks installed.
Created by Richard Taylor // 1 thread
A new development is proposed behind 231-247 Milton Road in Cambridge.
The entrance driveway / road will need to cross the popular off-road cyclepath on Milton Road.
The crossing needs to be designed to be cycle friendly; ie. level for cyclists, with good visibility for cars to be able to see cyclists on the path, and with cars required to give way for cyclists.
There is a need to watch this development through the planning process.
Alternatively an access to the development from Woodhead Drive might be the safer option.
There appears to be potential for a cycle and pedestrian route through the site; but that is not currently planned for.
My article on the proposals is at:
Created by Richard Taylor // 0 threads
The path between Wadloes Road and Ditton Fields is popular with pedestrians and cyclists.
It is unlit though, and as it has buildings and high hedges on either side sofeels enclosed and it is much darker on the pathway than it is out in the open.
Lighting on this pathway would I think make it feel safer, and I think would actually improve safety for example through helping cyclists spot pedestrians earlier.
Created by Gregory Williams // 0 threads
Cycle travel details need to be added to the Sheppey college website for their Swale site:
http://www.cant-col.ac.uk/about-canterbury-college/travel-information
Created by Gregory Williams // 0 threads
A link to the CycleStreets cycle journey planner is needed on the Canterbury college website for their Canterbury site:
http://www.cant-col.ac.uk/about-canterbury-college/travel-information
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by MJR // 2 threads
There was a Heritage Lottery Fund stage 1 project hoping to progress to stage 2 and work for 5 years from June 2014 to regenerate the "old town" around the Saturday Market Place. The initial draft contains no cycle measures but does mention cycle access policy, so may be persuaded to reinstate lost public cycle parking in places like opposite the old Post Office and might even be a way to fill in the missing link in National Cycle Network Route 1. The consultation papers are online at http://www.west-norfolk.gov.uk/default.aspx?page=26919 and open until 16 December.
The key cycling problem in this area is the difficulty of accessing Saturday Market Place without passing through the poor junction at its east end and the lack of signs telling cyclists to use Priory Lane to reach SMP.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.