SMALL SCHEMES, BIG CHANGES - BARNSTAPLE
Removal of hazardous barrier on cycle path ending on Rose Lane; making turns from road onto path very hazardous!
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by North Devon Cycling Forum // 0 threads
Removal of hazardous barrier on cycle path ending on Rose Lane; making turns from road onto path very hazardous!
Created by North Devon Cycling Forum // 0 threads
Removal of hazardous barrier bars and severe cutting back of bushes on Hollowtree Cycle path; this is an hazarous obstruction on this narrow passage which gets intensely used.
Created by North Devon Cycling Forum // 0 threads
Severe cutting back of bushes on Hollowtree Cycle Path; this is an obstruction on this narrow passage which gets intensely used!
Created by North Devon Cycling Forum // 0 threads
Hazardous side road crossing Coney Avenue on Hollowtree Road, priority change required; turning drivers should give way to cyclists!
Created by North Devon Cycling Forum // 0 threads
Button Toucan Crossing Hollowtree Road not working (Lidl side, button north side)
Created by North Devon Cycling Forum // 0 threads
The Square: signage required to guide cyclists into subway (for Town Centre, Braunton and Tarka Trail) and onto Square (for Sticklepath via Long Bridge and bike parking "The Square")
Created by North Devon Cycling Forum // 0 threads
Rock Park corner: arrow on cycle path to direct cyclists onto road before the New Road Roundabout. This to clarify cycling route FROM Town Centre TO Newport.
Created by North Devon Cycling Forum // 0 threads
Replacement of last yellow “No entry to the Square from 23rd May” sign on Glouster Rd by signs with just “No entry to the Square”.
This makes clear that traffic calming of the Taw Vale route in favour of sustainable transport is PERMANENT and not temporarily!
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by North Devon Cycling Forum // 0 threads
Open or remove barrier to make use of Richmond Street as connecting route easier
Created by North Devon Cycling Forum // 0 threads
Gate under Western Bypass was closed two years ago, only to annoy cyclists? Incovenenient and annoying; re-open gate please!
Created by North Devon Cycling Forum // 0 threads
Removal of annoying gate on ramp Western Bypass-Tarka Trail; where is the cattle which needs to be held back by this gate?
Created by North Devon Cycling Forum // 0 threads
Surface and lighting improvements route Rugby Ground Alley Way/Car Park
20 mph speed limit on Fair View Road/Pilton Quay between Abbey Road and Pilton Causeway (Yeo Dale Hotel)
Upgrade footpath on river bank to shared path (with new shared path signs), making the full connection between Abbey Road and Rolle Quay.
Created by North Devon Cycling Forum // 0 threads
This NCN sign on North Walk has been wrong aligned for several years! "Welcome to Barnstaple"; great impression for visitors on NCN3 and NCN27!
New high-profile bike parking at main entrance Civic Centre
New bike parking Boutport Street at Green Lanes shopping entrance
New bike parking Boutport Street near Post Office/Butchers Row (also to reduce illegal pavement parking!)
New bike parking Church alley way (next to co-op on High Street); info signs at this location already regularly informally used as stands
More capacity bike parking Cattle Market (end of Holland Walk)
Re-allocate benches and bike-park on pavement next to the Square and removal of first taxi rank space; all required to create a logical off-road route connecting Boutport St
Allow cyclists to cycle on pavement next to the Square FROM Boutport Street TO The Strand
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn right from Boutport Street onto Boutport Street (in front of the Post Office) - arrow signage on tarmac?
Created by North Devon Cycling Forum // 0 threads
Allow cyclists to turn left from Butchers Row onto Boutport Street (current sign only allows taxis to do this!)
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream