'Quick Win' cycling permeability improvements in Westminster
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Dominic Fee // 1 thread
Westminster Cycling Campaign is compiling a list of possible 'Quick Win' cycling permeability improvements in the borough.
Created by Jon Warbrick // 1 thread
Cambridgeshire Insight have just released data from a set of 'smart' traffic sensors installed to monitor the effect of the Mill Road bridge closure: https://data.cambridgeshireinsight.org.uk/story/monitoring-impact-mill-road-bridge-closure
This data is particularly interesting because it provides classified counts of pedestrians, cyclists and various classes of motor vehicle in both directions across 15 locations in Cambridge.
Conversion and extension of 3 bed detached dwelling into 2 x 2-bed and 3 x 1-bed apartments including a part 3 storey, part 2 storey and part single storey rear extension incorporating balconies on 1st and 2nd floor, extension to roof from hip to gable, conversion of garage to living space and associated alterations. Erection of bin and cycle storage in front garden.
25A Mowbray Road Cambridge CB1 7SR
Cambridge
Application reference : 19/0698/FUL
Anon // 1 thread
Overview
We want to hear your views on the planned controlled parking zone for the Rotherhithe and Surrey Docks area.
Up to 3,000 new homes in the area mean that a controlled parking zone is essential - in particular, this is the only way to enforce the permit-free planning conditions for the Canada Water development, and prevent intolerable additional parking pressures.
Anon // 1 thread
We are consulting on creating two way streets in the Lower Road area and Cycleway 4.
The existing road layout creates a sense of motor-vehicle dominance, one way streets encourage fast vehicle speeds, which adds to unpleasant conditions for both pedestrians and cyclists.
Anon // 1 thread
Overview
We are consulting on creating a cycleway in the Rotherhithe area.
Future cycling demand is predicting there will be a significant desire to\from Peckham and beyond, with up to 150 cyclists using the route during the peak period, in the event of a free ferry crossing being developed.
We have developed proposals to link Cycleway 4 and Quietway 14 as a first phase and we are exploring potential connections towards Peckham.
Anon // 1 thread
Transport for London has awarded Southwark funding to improve streets in South Bermondsey to make this a more “Liveable Neighbourhood”. The council wants to hear your ideas on how to spend £30,000 this year to improve the look and feel of your streets and make it easier to walk and cycle.
Improvements could include new crossing points and other safety features, new green spaces, cycle routes or cycle parking.
The council also plans to bid for more money for the next year three years to provide more street improvements and to make this area even more pleasant and healthy for you and your family.
Created by John Chamberlain // 1 thread
From late July till end November, Robert Street will be closed between Stanhope Street and Hampstead Road for HS2 related water main replacement. All traffic including cycles will be diverted.
Update October 2019: Works extended to end of year.
Created by FrenchyF // 1 thread
It can take up to 5 minutes to cross from the east side of Little France Drive to the west side of ODR, as there are four stages of pedestrian crossings.
Created by Simon Still // 1 thread
In the last three years, there were 61 collisions, with 71 casualties, 19 of which were people cycling and eight of which involved pedestrians. (Data available up until the end of November 2018).
The scheme aims to address identified and perceived safety concerns at these junctions, as well as at George’s Road and the turning into the petrol filling station south of Palmer Place. The scheme will introduce new, signalised pedestrian crossings at the Drayton Park/Palmer Place junction, replace the zebra crossing at the junction of Liverpool Road with a signalised crossing and simplify all the existing staggered crossings to straight across crossings at the Hornsey Road/Hornsey Street junction.
We consulted on a proposal that sought to deliver signalised pedestrian crossings at Drayton Park/Palmer Place and Liverpool Road in 2010. This was not taken ahead because of concerns raised during the consultation about the impact of the scheme on local roads arising from proposed banned turns. This consultation was also launched shortly after the recently opened Emirates stadium, the effects of which were felt to have an impact on the response to the consultation. When developing our new proposal we took this feedback into account and have now amended the scheme to address these concerns. The details can be found below.
Our proposals
We would like your views on the following proposals which aim to provide new signalised crossings and address identified safety concerns.
We propose to provide new, signalised pedestrian crossings at the Holloway Road/Palmer Place/Drayton Park junction and the Holloway Road/Liverpool Road junction. The existing signalised pedestrian crossing outside the London Metropolitan University Clocktower building would move south and be brought into the new junction.
We propose to simplify the Holloway Road/Hornsey Street/Hornsey Road junction. We would convert the existing staggered signalised pedestrian crossings to straight across crossings. We also propose to remove the small triangular pedestrian island and slip road into Hornsey Road to create more space for people walking, reduce the crossing distance and simplify traffic movements.
To allow for the proposed crossing changes to be introduced, changes to some bus stops, loading bays and parking locations between Hornsey Street/Hornsey Road and Ronalds Road would be required.
To provide the new crossings, we propose to make changes to some permitted turning arrangements for traffic at the Drayton Park/Palmer Place and Liverpool Road junctions. All movements through the area would still be possible in the new road layout, but it might be necessary for road users to take a different route. These changes are necessary to allow the crossings to be delivered without displacing traffic on to local roads.
In detail:
We need to remove two trees to ensure the new signals at Liverpool Road are visible to drivers. We have identified locations to plant new trees elsewhere within the scheme extents, subject to ground conditions.
We propose to change the traffic signals at the Drayton Park/Palmer Place junction so that the side roads run separately to reduce the risk of conflict between road users at this junction.
To provide the new pedestrian crossings at the Drayton Park/Palmer Place junction and on Liverpool Road, all the junctions in the scheme must be addressed together. This is to ensure the road network operates effectively in this area for all users.
Traffic modelling
Our traffic modelling data shows that the overall effect of our proposals on buses is generally neutral. The majority of bus routes will experience a change in journey time of between 0 and 30 seconds, however there are also some considerable improvements, of up to 5 minutes, expected for buses using Liverpool Road in both directions, particularly during the PM peak. There is an overall small impact on northbound general traffic, with improved journey times for southbound general traffic. These impacts result from the need to balance the network for all vehicular modes affected by the proposals.
Bus service changes
As a result of changes to the turning movements at the junction of Palmer Place to Holloway Road, we are also proposing to reroute the 153 bus route in a northbound direction from Palmer Place on to Liverpool Road. This is required because of the changes at the Palmer Place junction but is also expected to increase reliability and simplicity for passengers.
Cycleway consultation
The London Borough of Islington, in partnership with Transport for London, are also currently consulting on a new Cycleway adjacent to this scheme. The new Cycleway will connect Finsbury Park and Highbury Fields, where the improved route will help cyclists cross Holloway Road at the existing cycle crossing at Fieldway Crescent. More details are available at: www.islington.gov.uk/highburycycleway.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Our Liveable Streets programme will improve the look and feel of public spaces in your neighbourhood. By creating a better environment, we can make it more convenient to get around by foot, bike and public transport.
From creating new green spaces to rethinking how our streets work, we want your creative ideas, thoughts and feedback.
Tell us what matters to you by completing our online survey towards the bottom of this page. You can also plot your ideas on the interactive map below.
Please talk to your neighbours, friends and family and encourage them to take part.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Residents of Beaumont Square and the surrounding area raised concerns about rat-running and the problems it causes in local streets. You may remember that the Council previously consulted residents on traffic management proposals to reduce traffic speed in the area; many of which were strongly supported and have now been implemented. A number of additional ideas were also put forward by residents which have now been considered and we would appreciate your opinion on whether they should be introduced.
One of the problems is the level of traffic trying to avoid the traffic lights at the A11 Mile End Road/White Horse Lane junction. Drivers cut through either Beaumont Square or Eastbury Terrace through to Beaumont Grove to join A11 Mile End Road junction causing safety concerns, particularly for the nursery and nuisance to local properties. In addition, Beaumont Grove suffers problems relating to parking for surrounding shops and takeaways.
Created by Matthew // 1 thread
The central portion of Hills Road seems to be a kind of 'forgotten' area, with nothing more than narrow mandatory cycle lanes in miserable shape, and terrible junction design for people walking and cycling.
If GCP is looking for an area that needs improvement, this is one that needs doing, and it is fairly central and high-profile.
Created by David Lincoln // 1 thread
Compton Street (from Agdon Street to Goswell Road) and Cyrus Street - School Street Scheme
St. Peter & St. Paul Catholic Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around St. Peter & St. Paul Catholic Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Compton Street and Cyrus Street?
The proposal is to trial a temporary road closure on Compton Street (from Agdon Street to Goswell Road) and Cyrus Street into a School Street Scheme between 8.30am to 9.15am plus 2.45pm to 3.45pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Moreland Street, Pickard Street and Gard Street - School Street Scheme Moreland Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Moreland Primary School and create a safer, more pleasant environment for everyone. The Council would like to hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools this will help to reduce congestion and pollution at the school gates as well as make it easier and safer for children to get to and from school.
What is proposed for Moreland Street, Pickard Street and Gard Street?
The proposal is to trial a temporary road closure on Moreland Street, Pickard Street and Gard Street between 8.30am to 9.15am plus 3.00pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an exemption. Residents and businesses who live and work on a school street will be able to register for an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered vehicles entering the street during the times of operation may be identified by camera and issued a penalty charge notice.
Created by David Lincoln // 1 thread
Noel Road (from Danbury Street to St Peter’s Street) - School Street Scheme
Hanover Primary School
Islington Council is planning to introduce a School Street Scheme to improve air quality around Hanover
Primary School and create a safer, more pleasant environment for everyone. The Council would like to
hear your thoughts on the proposal.
What is a School Street Scheme?
A School Street Scheme is where a road with a school temporarily closes to become a pedestrian and
cycle zone during the school’s opening and closing times. By temporarily closing roads outside schools
this will help to reduce congestion and pollution at the school gates as well as make it easier and safer
for children to get to and from school.
What is proposed for Noel Road?
The proposal is to trial a temporary road closure on Noel Road (from Danbury Street to St Peter’s
Street) between 8.30am to 9.15am plus 3.15pm to 4.00pm during school term time.
Vehicles will not be able to enter the streets between these times unless they have been given an
exemption. Residents and businesses who live and work on a school street will be able to register for
an exemption as well as Blue Badge holders. The scheme will not operate in the school holidays or at
weekends.
Signs will inform drivers of the restrictions before the entrance to the closed street. Non-registered
vehicles entering the street during the times of operation may be identified by camera and issued a
penalty charge notice.
Hanover Primary School is being looked at as part of the wider School Street Scheme Programme
across the borough. An 18 month trial is proposed. The Council will be working with the school and local
community to develop the scheme.
Change of use from 8 bedroom guest house (Use C1) to 9 bedroom guest house (Use C1) and associated refurbishment works including:- installation of roof lights, replacement canopy, installation of railings and dwarf wall to front elevation and cycling parking.
4 Huntingdon Road Cambridge CB3 0HH
Cambridge
Application reference : 19/0830/FUL
Created by Anoop // 1 thread
Minor roads in Kenton such as Kingshill Avenue are used inappropriately by through traffic. This is a consultation on options to reduce through motor traffic whilst maintaining access for walking and cycling
Created by M Stanley // 1 thread
Leeds city council are proposing to reduce the speed limit from 60mph to 40mph
Created by Marcus Howarth // 1 thread
Doing a quick scan of the document see some enoughing comments on segregated cycleway in high st, parking and a cycle networks.
Unfortunately skip to the table at the end and it seems to be Medium to Long term objectives so real actions lacking.
see p53 Guideline SS4: The Northern Side of the High Street
Any redevelopment should take the opportunity to create a
segregated cycle path parallel to the High Street.
p61
7.29 Assisting a shift to more sustainable modes of transport would also be
beneficial. Expanding the cycle network to create a segregated cycle way and
increasing the pedestrian access and wayfinding for pedestrians to and from
the High Street and Grove Park would also be welcome by-products, should a
comprehensive redevelopment of the north side of the High Street take place.
Guideline G9: Traffic and Transport
The council will seek to improve the cycling network and pedestrian
network throughout the Conservation Area as opportunities arise.
Temporary highway works on the northern side of Newmarket Road for a period of up to five years.
Land north of, NEWMARKET ROAD, Cambridge
South Cambridgeshire
Application reference : S/1605/19/FL
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream