About page on CCC web site
Final version at https://www.ensembling.com/68508
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Hall // 0 threads
Final version at https://www.ensembling.com/68508
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Gregory Williams // 1 thread
The cycle route warning signs on lighting columns QAD014 and QAD011 haven't been reinstated following the replacement of lampposts in Queens Avenue. These Google StreetView images show them on the old lampposts:
http://goo.gl/maps/QDqt8
http://goo.gl/maps/KNzNY
The signs should be reinstated to ensure that other road users are aware that they should expect to see cyclists emerging from the section of cycle path adjoining Queens Avenue.
Created by Shaun McDonald // 1 thread
There is a new something being installed in the middle of a shared cycle pavement (see photo), yet there is already limited space, especially at peak times.
South Glos Council have published a consultation for extending the cyclepath from Emersons Green to Yate - the Yate Spur
https://consultations.southglos.gov.uk/consult.ti/YateSpurWesterleighRd/consultationHome
Funding has been secured through the Local Sustainable Transport Fund to deliver elements of the Yate Spur cycle path. When complete, the route will connect the Bristol to Bath Railway path with Yate.
The proposed road crossing will provide an informal crossing facility at Westerleigh Road for cyclists, walkers and horse riders using the Yate Spur Cycle Path and Fishing Lakes Link.
At the lower end of the cycle path that runs from Church Lane, up Madley Brook to Madley Park, is a bridge set at a weirdly sharp angle to everything else.
Coming from Church Lane, it is immediately after a blind corner, requiring a sharp right turn; then the bridge requires a sharp left turn. At this very point, before the wood of the bridge, the road surface is uneven and has collapsed.
While the cycle path apparently has to briefly join the footpath - no permission given for a way through on the south side of Madley Brook? - it does so in a very dangerous way, which is difficult even for experienced cyclists to negotiate, and provides no visibility of other route users including pedestrians.
When it rains, Skippet Lane between Ramsden and Finstock fills with gravel, soil and other associated rubble. It has collected at the bottom of the hill, and is particularly hazardous on the left-hand bend there.
This road - a useful route for cyclists wanting to avoid the main Witney-Charlbury B road - needs regular checking and clearing of detritus, as it has been like this now for at least a year.
Created by Gregory Williams // 1 thread
Parking over the shared cycle / foot path appears to be a routine occurrence in the Bluebell Road / Orchid Court / Poppy Mead area of Park Farm. This makes the path difficult to use as a cyclist.
Created by Gregory Williams // 1 thread
Inconsistent and incorrect No Cycling signs exist at the Sheepfold Lane end of the Great Oak Row cycle / foot path. Cycling is permitted here, as can be seen from the cycle symbol on the ground. These signs should be replaced with shared-use cycle / foot path signs to avoid causing confusion.
Created by Gregory Williams // 1 thread
A lamppost is positioned in the way of a cycle path beside Bluebell Road at its junction with Sheepfold Lane. It is particularly hazardous if cycling along Bluebell Road west-to-east and then transitioning onto the cycle path beside Sheepfold Lane just before the road junction.
Created by Gregory Williams // 0 threads
There is no cycle parking at Chilham railway station, thus discouraging people to cycle to the station. The photo shows that there is plenty of room on the platform for a few stands to be installed.
Created by Gregory Williams // 1 thread
Chilham village is currently somewhat isolated from the cycle network by the busy A28 and A252 roads. It should be linked to the NCR18 route being developed linking Chartham and Godmersham.
Created by velocipedus@gmail.com // 1 thread
This issue offers resources for a dialogue with motorist, through the media, through their organisations, etc.
http://camcycle.cyclescape.org/issues/67 already offers some threads on taxi drivers (could be united)
Created by David Wilcox // 0 threads
This is a busy rat run and a bus route! As evidenced by the google street view, a pedestrian desire line runs through from Butterfield Road to Bishop Manor Road. The consultation is at: https://www.citizenspace.com/bristol/city-development/bishopthorpe
Pavement Parking is the issue here, blocking sight lines. The proposed road markings and build outs will help. If they are enforced.
As specified in the website below there is a consultation on Satchfield Close in Henbury Bristol.
https://www.citizenspace.com/bristol/city-development/satchfieldclose
Looks like parking is a problem for the locals as they can't seem to drive a car onto their driveways.
The council is keeping the large tree in the scheme and hopefully it will stop the inhabitant's from parking on the pavement.
Created by Gregory Williams // 1 thread
The Conningbrook Lakes development proposes 300 dwellings together with the creation of a country park and water sports facilities. The development offers the opportunity to improve the alignment of NCR18 by making it shorter and removing the blind junction at Blackwall Road North / Willesborough Road and the uncontrolled crossing of the A2070 near Premier Foods.
Created by Chris Howell // 1 thread
http://www.cambridge-news.co.uk/News/Future-of-two-more-pubs-hangs-in-balance-02012013.htm
Comment from highways:
"The application claims provision of 24 cycle parking spaces; however I am unable to locate the proposed spaces on the plans. Please require the applicant to show the proposed parking provision, with dimensions on the plans and submit same for comment by the Highway Authority prior to determination of this application."
I looked round this site when it was for sale - the building occupies almost the entire plot - I can't imagine how they would get 24 cycle parking spaces on site (let alone with bin storage as well). Highways point definitely needs addressing.
Closing date for comments 8th Jan.
Created by Gregory Williams // 1 thread
The cycle filter lane markings on South Canterbury Road for the right turn into Stuppington Lane need to be refreshed. The cycle lane markings in Stuppington Lane also need to be refreshed. These markings make it clear to drivers that they should expect to encounter cyclists here and should adapt their driving accordingly.
Created by cobweb // 1 thread
Flagging this up as the city's cycle parking standards basically say racks are provided on merit for hospitals so it could be useful to check what they're offering.
Created by velocipedus@gmail.com // 9 threads
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
Created by cobweb // 1 thread
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
Created by Gregory Williams // 1 thread
Both ends of the new cycle path between George Roche Road and Stuppington Lane in Canterbury do not have properly dropped kerbs. This makes joining / leaving the cycle path dangerous. Properly dropped kerbs should be installed.
Additionally the visibility to the SW at the junction with Stuppington Lane is poor due to a hedge immediately adjacent to the junction. The sightline needs to be improved here, since road users approaching from the SW will not be able to see cyclists and pedestrians about to emerge from the path. Likewise cyclists and pedestrians turning into the path will not be able to see anybody else on the path that's approaching the junction.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.