21/00027/FUL: change use to 8 bed HMO and a 2bed flat, 1 Hurrell Road, CB4 3RQ
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00027/FUL | Change of use from Class C3(a) to C4 turning a 7bed dwelling to a large no 8bed HMO and 1no 2bed self-contained flat.
1 Hurrell Road Cambridge CB4 3RQ
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/05396/FUL
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).
Trinity Hall Farm Industrial Estate, Nuffield Road, Cambridge, CB4 1TG
Created by Jean Dollimore // 1 thread
The Camden Square area is bounded by Camden Road, Camden Park Road-York Way, Agar Grove and St Pancras Way. Most of this area already benefits from some road closures made in the 1970s at junctions with Agar Grove (St Augustines Road, St Paul’s Crescent and Stratford Villas) and at junctions with Camden Road (Rochester Square and Cantelowes Road). But Murray Street is still used as a rat-run between Camden Road and Agar Grove.
This consultation focuses on
The rat-run reduction scheme proposes two filters:
The proposals for improving the cycle route are:
Created by Marcus Howarth // 1 thread
The plans involve East/West road with multiple signage for entry/exit of 20/30mph zones plus the Byway cul-de-sac.
Plan (pdf) is embedded on consultation page.
To the North of route shown in blue is existing 20mph
This forms part of the NCN77 route.
Created by Marcus Howarth // 1 thread
The draft document is linked right at the bottom of the consulation page, again here
https://drive.google.com/file/d/15a9o8nCb5R9rs5iPINp8M2zrr3Qm-Axr/view
from 1.3
Everyone benefits from sustainable transport because it means that we are:
• Keeping the air cleaner through alternative travel choices, such as walking, cycling to work, using public transport or using electric vehicles, while improving public health;
• Improving safety for travellers, especially for people with disabilities, children, older residents and other vulnerable road users such as pedestrians and cyclists;
1.13 In July 2019, the London Borough of Sutton declared a climate emergency, and pledged to make the borough carbon neutral. Air quality improvements and carbon reduction are byproducts of, and some of many reasons for, sustainable transport.
from section 4
Cycle mode share is low, 1.1% of all journeys and among the lowest share in London.
5.7 Essentially, more people in Sutton are choosing to use their car for journeys of less than 2km than anywhere else in London.
See Section 6 re. cycling.
6.12 The existing number of cycling trips made each year in Sutton is 7,700, out of a total in outer London of 208,200 trips.
However, there is a potential for 234,900 daily cyclable trips, which would mean that 3% of all borough journeys would be by cycle. This
figure is higher than boroughs of similar size and population such as Harrow, Merton and Richmond upon Thames.
6.13 As with walkable trips, Sutton also has the highest number of potentially cyclable trips per resident that are currently made by a motorised mode of travel22.
Targets include
Appendix F : no mention of cycleways
also saw under Developer checklists:
Cycling
G6g) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the place-based projects in the Sutton Public Realm Design Guide Supplementary Planning Document (adopted January 2020).
G6h) The Council, landowners, developers, infrastructure providers and funding agencies will work together to implement the Liveable Neighbourhoods schemes and to bid for and implement future schemes where possible.
Created by Steve Crapper // 1 thread
An obvious link between the very well publicised and used Brierley trail and Skegby Trail is required in this plot of land to enable circular routes to be created
Created by Steven Moseley // 1 thread
Created by Jean Dollimore // 1 thread
All of the schemes operate timed road closures on Mondays to Fridays e.g. from 8.15am-9.15am and 3pm-4pm in term time.
In all but one of the schemes, it is stated that the restrictions will be enforced using Automatic Number Plate Recognition (ANPR) cameras.
Each scheme would be introduced as a trial for a maximum of 18 months with a further consultation After 12 months.
Exemptions: properties and businesses in the closed section of the affected road, emergency services, bin lorries, blue badge and pupils of the school that have a disability that prevents them from using active travel.
A few nice surprises here, marked with asterisks ***
Brookfield School
A Healthy School Street on Croftdown Road, between the junction with Chester Road and the east side of the junction with St. Albans Road.
And close with planters and bollards the west side of the junction Croftdown Road/ St Albans Road
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-brookfield/
Kentish Town Church of England Primary School
A Healthy School Street on Islip Street, from Frideswide Place to the junction with Hammond Street.
*** Create a permanent restriction on Hammond Street by placing planters halfway between Islip Street and Caversham Road.
Temporary widening of footway outside school. Why temporary?
Removal of some guard rails
Consultation on Camden’s website:
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-kentish-town/
Christopher Hatton Primary School
1. A Healthy School Street On Mount Pleasant, between the junction with Grays Inn Road and the junction with Elm Street.
No mention of the use of ANPR cameras.
*** 2. Make permanent the trial scheme in Laystall Street north of Rosebery Avenue which implemented a mid-point closure and allowed two-way cycling.
Consultation on Camden’s website
Argyle Primary School
A Healthy School Street road on Bidborough Street, Hastings Street and Tonbridge Street.
*** The one-way systems on all three streets would remain in place, with the addition of a contraflow for cycles.
Consultation on Camden’s website
https://consultations.wearecamden.org/supporting-communities/healthy-school-streets-argyle/
St Mary and St Pancras School
A Healthy School Street on Polygon Road between Chalton Street and Werrington Street.
Consultation on Camden’s website:
Ecole Jeanine Manuel
A Healthy School Street on the south side of Bedford Square which is one-way westbound.
from the junction with Bloomsbury Street to Adeline Place
*** Add a contraflow cycle lane to the southern side of Bedford Square
Consultation on Camden’s website:
Created by Jean Dollimore // 1 thread
The proposal is to made a Tiger crossing over Mansfield Road between Estelle Roads and the cut-through to Elaine Grove. This will replace the existing zebra crossing. The following supporting measures are also proposed:
The improvement of this crossing is in preparation for the extension of C6 from Kentish Town via Castle Road, Castelehaven Road and Grafton Road to reach Hampstead Heath at Savernake bridge.
Implement on 18 month ETO,
Created by Rosamund Humphrey (Admin Officer) // 1 thread
Change of use to large HMO (8 bed) including conversion of existing garage to make the 8th bedroom with ensuite.
189 Arbury Road, Cambridge, CB4 2JJ
Created by Rosamund Humphrey (Admin Officer) // 1 thread
21/00182/PRI03O | Prior approval for change of use of offices (Class B1(a) to 3 No. dwellinghouses (Class C3)
175-179 Newmarket Road, Cambridge, CB5 8HA
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04992/FUL: Conversion of bungalow to a two storey dwelling comprising of 4 flats
538 Newmarket Road, Cambridge, CB5 8LL
Created by Jean Dollimore // 1 thread
This scheme is intended to reduce through traffic on King Henry’s Road and Elsworthy Road, both of which have ~ 2000 motor vehicle movements per day in each direction, 74% of which is through traffic. In addition, average speeds are well in excess of 20 mph.
To stop the rat-running and to reduce the traffic volumes and speeds on King Henry’s Road and Elsworthy Road, Camden proposes the following point closures:
In addition, Camden proposes:
It's hard to know where (and when) all the future cycling-related developments are, so a map showing them could be very useful. This issue is to discuss this idea, if it is useful, or already exists somewhere, and how it might be done.
20/05040/FUL | The erection of a new building comprising E(g) floorspace with car and cycle parking, landscaping and associated infrastructure | Land To The West Of Peterhouse Technology Park Fulbourn Road Cambridge CB1 9NJ
Created by Steven Moseley // 1 thread
Development of 102 dwellings with associated parking, landscaping, open space, drainage and infrastructure and the formation of a vehicular access onto London Road
Created by Roxanne (CEO) // 1 thread
Issue to collect various government strategies related to transport that might impact cycling but are not specifically related to cycling.
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by George Coulouris // 1 thread
The proposals will trial a motor traffic-free environment that reduces traffic volumes and speeds, supports the existing market and local businesses, and allows more space for social distancing, walking, and cycling. The proposals also include measures at the junction of Queen’s Crescent and Grafton Road to prevent rat running traffic from using Grafton Road and Vicar’s Road and create a safer and quieter environment for residents in that area.
Camden have announced a consultation trial closures of Queen's Crescent (the market area) and Grafton Road. The resulting reduction in motor traffic will improve cycling conditions massively on Grafton Road in particular and in adjacent streets to a lesser extent. This, in conjunction with this scheme including the closure of Anglers Lane (decision to go ahead) should result in a sizeable LTN in all but name.
The contra-flow (westbound) cycle lane on Plender Street has been closed by the building works to the former Methodist Chapel. There is signage up saying "cycle lane closed".
Created by George Coulouris // 1 thread
Change of use from industrial (Class B2) to flexible industrial (Class B2)/ storage or distribution (Class B8)/ light industrial (Class E),
If this is approved it will result in a continual flow of vans all day on Holmes Road and Grafton Road, both of which are already overloaded with traffic and have primary schools on them. Grafton Road is part of a Cycling Quiet Way between Camden Town and Highgate also connecting to Hampstead Heath (Constantine Road) and it is planned to upgrade this route to be part of cycleway C6
We intend to submit an objection to the application and to coordinate our response with Inkerman Area Residents Association.
Below is a first draft for our response. Please comment and suggest further points for inclusion.
Created by JohnP // 1 thread
The Office of Road and Rail has put out a Consultation on ‘Principles for managing level crossing safety’. See https://www.orr.gov.uk/sites/default/files/2021-01/consultation-on-principles-for-managing-level-crossing-safety-guidance.pdf
I became aware of this when checking out the reason why a stupid 'Cyclists Dismount' sign has appears at one of the Queen Adelaide level crossings. Dismounting on this narrow road that has lots of agricultural vehicle and heavy goods vehicles on it is unwise. On the other hand, the angle at which the rail track crosses the road eats up cycle front wheels regularly. But changing the nature of the hazard is not a sensible way forward.
Created by Roxanne (CEO) // 1 thread
There is a new Living Streets group in Cambridge.
To find out more visit: https://www.livingstreets.org.uk/get-involved/local-groups/cambridge
What can we do to help promote the group and support campaigns for more, better and safer walking?
Created by Jean Dollimore // 1 thread
Camden Council is consulting on changes to Baynes Street which will prevent motor traffic (except buses, emergency and refuse vehicles) from using Baynes Street as a cut-through between St Pancras Way and Royal College Street. They will be able to use Georgiana Street instead.
Baynes Street will be made two-way for all vehicles (including cycles) but no motor vehicles will be able to enter Baynes Street from Royal College Street. Motor vehicles can enter from St Pancras Way to access properties and some parking will be removed to facilitate turning round.
On St Pancras Way - a proposal to widen the northbound cycle lane and to remove the turning pocket.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.