  • Contractor's fencing part-blocking cycle path

    Created by Jon Warbrick // 1 thread

    Contractor's safety fencing for some of the work going on adjacent to Addenbrookes has been put up on the adjacent cycle path, presumably because it's easier to to that than put it up in the building site itself. Unfortunately this obstructs about a third of the path.

    Whoever did this obviously realised that this was problematic, since they have painted the path side of all the bases yellow. Unfortunately this doesn't help in the dark.

    I can't see any obvious contact details for the contractors, apart from 'Tamdown' on an attached 'Danger - Deep Excavation' sign. Anyone any idea how to get this addressed?

    Please sign in to vote.
  • Proposed removal of cycle path

    Created by Chrisj // 1 thread

    Notice is herby given that Southampton city council

    proposes to make the following

    The City of Southampton(various roads)

    (movement restrictions)(amendment no9)order 2013

    1. the effect of the order is to remove the contraflow cycle lane on

    second avenue between first avenue and the north-westernmost

    access to the NXP site, approximately 150metres south-east of allington

    road thus reverting this part of second avenue to two way traffic. The

    contraflow cycle lane will remain on the part of second avenue between

    the north-westernmost access to the NXP site and allington road.

    2.Copies of the order, relevant map and statement of reasons for

    proposing may be inspected during normal working hours at my enquiry

    office. Further information may also be obtained from the Southampton

    Highways Partnership (traffic management) on 02380798064

    3.Any person wishing to object to the order must write to at the

    address given below or email:

    Traffic.Orders.legal@southampton.gov.uk stating the grounds for

    objection within 21 days of this notice (i.e. by 2 August 2013)

    Dated 12 July 2013

    Richard Ivory Head Of Legal, HR and Democratic Services,

    Please sign in to vote.
  • Development of Brunel Mile, Bristol

    Created by Sam Saunders // 0 threads

    The Brunel Mile is a notional route between Millennium Square and Temple Meads Station. A video (date uncertain) on the Better By Bike website shows the intended journey. http://www.betterbybike.info/video-list/millennium-square-to-bristol-temple-meads-along-brunel-mile
    Some of the route shown in the video corresponds with Bristol Cycling Campaign's important orbital freeway: Fo1 Inner Loop Redcliffe Way to Triangle. (see https://maps.google.co.uk/maps/ms?msid=213139683046776952805.0004d820d652973f23c70&msa=0&ll=51.491805,-2.665343&spn=0.025758,0.032959&dg=feature) To enable a network to develop coherently as it grew, Fo1 would be our recommended route.

    As it stands (July 2013) there is only one short section of the Brunel Mile that meets a majority of the criteria that would characterise a cycling Freeway, namely the segregated cycle lane across Redcliffe Bridge which fails only on the "continuous" criterion. It seems important that all of it should do, as a priority, given that sections of the Brunel Mile are very heavily used by cyclists and pedestrians, especially at peak times. For many visitors coming by train with cycles or using the Brompton Dock at Temple Meads this will be a first experience of cycling in Bristol. It needs to make sense and to be easy to use first time.

    Issues and suggestions, as things stand, are as follows

    1. Pero's Bridge already has too much pedestrian and cycle traffic. It is often uncomfortable for pedestrians and for cyclists. Keeping it as part of a major cycle route through the city is unacceptable. Route Fo1 uses Prince Street instead, where a wide segregated cycle lane would be feasible.
    2. The Royal Oak Avenue, Queen Square and Bell Avenue sections would benefit from clear segregation of pedestrians and cyclists, along the lines suggested by the de facto segregation that tends to happen at peak times.
    3. The pedestrian and cycle crossing at Welsh Back might benefit from an analysis of behaviour at that junction and consideration of standards adopted in other places. Casual observation suggests a great deal of uncertainty among all road users as to what is supposed to happen and who has priority.
    4. At the end of Redcliffe Bridge cyclists are faced with uncertainty as to whether to continue along the paved area beside Freshford House or use the pavement alongside Redcliffe Way. Signage at that point (as it is all along the route) is confusing, inconsistent and unspecific.
    5. Crossing Redcliffe Street by cycling straight over the zebra crossing and expecting cars to stop seems to be condoned, and practised. This doesn't feel right and matches no standards that I am aware of. A clear decision needs to be made about how cyclists and pedestrians can cross here without arcane knowledge of "Bristol Rules". Many of those using this (as on the other crossings on the Brunel Mile) are visitors to the city on their first mile of city cycling.
    6. The following section of Portwall Lane could be made into a fully segregated cycle lane, with a better crossing at Phippen Street. The numbers of pedestrians, cyclists and out-of-office smokers on this section can be very high and leaving the traffic to fend for itself is inimical to a genuine 8-80 environment.
    7. At the end of the Portway there is great ambiguity about how to reach Temple Meads on a bike. The Better By Bike video shows the least satisfactory option that ends abruptly on the wrong side of Temple Way with two busy pedestrian crossings and an unsatisfactory cobbled road to negotiate before reaching the front of the station. Most cyclists seem to use one of the more direct routes over light controlled crossings to The Friary, thence to the side entrance of Temple Meads where the presence of the Brompton Docks and the Cycle Hub van give a natural welcome.
    8. Development work on the derelict "island" around Portwall Road East should take full account of the existing use of that section as a crossing point for cyclists and pedestrians getting to and from Temple Meads Station.

    In conclusion, A cyclist coming off the platforms at Temple Meads should be able to see very clear signs about which exit to use, and which path to use to get to Bristol City Centre. At present there is nothing at all. Once they have made an exit they should be able to see cycling specific signs that are prominent and clear. They should then be able to follow a designated route that is self-evident and waymarked. The current pedestrian signs are elegant and have good maps, but they are no more use to cyclists than they are to motorists.

    A cyclist wanting to get to Temple Meads Station from Bristol City Centre should be able to find the Brunel Mile (on Fo1) from wherever they are without too much difficulty, and then follow it confidently all the way to the railway platforms.

    Please sign in to vote.
  • Proper cycle provision on Cherry Hinton Road needed

    Martin Lucas-Smith // 1 thread

    Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.

    Please sign in to vote.
  • Blocked Cycle infrastructure Johnsons Lane, Whitehall

    Created by Eric Booth // 1 thread

    I need to report a problem with a route in Whitehall. The council made a hoohaa about linking the cycle path to St George Park. They installed a contraflow in Stretford Road, a bike crossing over Whitehall Road and signage between the cycle path and the park. Laudable. I have used this route to take my daughter to Whitehall Primary School on Johnsons Road for the last year. She had her first Bikeability Lesson on Sunday and is now riding to school (aged 6 - v. proud!!). However, where the link goes through a snicket between the Kings Head pub and Packers Field it is being blocked by cars. This is making navigating a blind corner even more dangerous. Links to pictures below.

    A lot of money was spent on this link and its being rendered unusable.

    Please sign in to vote.
  • Roadworks on the guided busway

    Created by Clare Causier // 1 thread

    This afternoon the guidedbusway was closed from Cambridge Regional College to Histon. There was a security guard in a car who provided information on the closure and diversion. However, there was no diversion signage for cyclists or pedestrians.

    When I returned home I checked cambridgeshire roadworks for further information but drew a blank.

    Is anyone aware if works on the busway is covered by any public notification system?

    Saturday afternoon is not a bad time for maintenance, but I imagine commuters would appreciate notice of works which affect their journeys.

    Please sign in to vote.
  • Poor towpath surface

    Created by Chris Lowe // 1 thread

    This section of towpath has been reported as having a poor surface. (Not sure how far north of Bournville Station the issue extends)

    Using tarmac rather than breedon gravel has been requested, to be harder wearing and retain a good surface longer.

    Please sign in to vote.
  • Lack of safe room for cycles, terrible road surface

    Created by DavidTheScientist // 1 thread

    While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
    Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.

    Please sign in to vote.
  • Whiteladies tree removal

    Created by aSemy // 0 threads

    A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.

    There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.

    Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.

    Please sign in to vote.
  • Whiteladies Rd/Blackboy Hill new signalised crossing for St John's School - detailed drawings

    Created by Eric Booth // 1 thread

    Another pinch point issue being installed on Whiteladfies Rd as part of the St. John’s Primary School Expansion which links the school in Worrall Road to the new site at the old police station at Lower Redland Road. Looks bad at the moment as there's just the buildout but signals will follow.

    BCC Engineer states:
    "In terms of specific cycle facilities we are making a number of improvement to the area:

    Adding a 1.5 metre uphill cycle lane on Whiteladies Road near the Grove Road area (existing signalised crossing is to be removed).

    Adding a 1.5m uphill red surfaced cycle lane (without markings) through the crossing on Whiteladies Road near Lower Redland Road.

    Adding a continuous contra-flow cycle lane through the 2 one-way sections of Lower Redland Road (which was requested by cyclists in the area).

    Please sign in to vote.
  • Temporary Traffic lights West site without cycle detection

    Created by Hester Wells // 0 threads

    Temporary traffic lights for building works between High Cross and Charles Babbage Road.

    I have received the following from our building facilities manager as these lights affect access to our building, and two others.

    "1. With effect from Monday 22 July there will be 3-way traffic lights positioned between the existing Charles Babbage Road and new CBR. This will last for 1 week. The lights will be installed on Friday ready for operation on Monday. These lights will have an operator to monitor traffic flow during peak periods (8.30am – 9.30am and 4.30pm to 5.30pm). Outside of these times the lights will operate on sensor detection for queued vehicles to avoid unnecessary queuing, and will automatically sequence between the roads when no traffic is present. Unfortunately the lights will not detect and activate for cyclists and cyclists will need to wait for the lights to operate on the normal sequenced rotation.

    2. Following the initial works and as work progresses along CBR, the traffic management will become 2 way light operation along the High Cross Access Road the CBR and this is expected to commence from Monday 29 July for a further 2 weeks.

    3. During the above the New CBR and Access Road to Schlumberger are being prepared and tarmacked – kerbs are being installed etc. Surfacing is to be complete by 12 August ready to opened for use by all to access via the New CBR after 12th August.

    4. Also after 12 August works will commence on finalising the junction at AVEVA/New Data Centre access and this will have 3 way traffic management and is expected to take 3 weeks.

    5. Finally the access road into site via High Cross will close from week commence 19 August and this will be for approximately 7 weeks. This closure will be fully diversion signed from Madingley Road and around the site with diversion management (sighs) taking us via JJ Thompson Road and round to AVEVA from there. However there will be a trial closure of the High Cross Road entrance on the Thursday/Friday 15th & 16th August prior to the work starting on 19th, just to ensure all the signage is correct and easily followed. "

    I am interpreting this as at least 6 weeks of temporary traffic lights which will not detect people on bikes.

    I suspect cycle detection was only mentioned because I had specifically asked this question when the issue of temporary traffic lights first came up.

    I have sent a message back to our facilities manager saying that I don't think this is acceptable as:
    1) Cycle usage is nearly as high has car usage here in summer
    2) I also see people using this as a through-route for Coton
    3) We are on a side road off a through-route for buses, so I suspect the lights on their normal sequence will not be at all favourable for a person on a bike trying to get out, as the normal sequence will not want to disrupt bus flow too much.
    4) I fear that the complete lack of provision will lead to some people breaking the rules, which could be dangerous.

    However, she is merely relaying these details to us and is not responsible for it. She can contact the site project managers about any issues, which I hope she will do.

    Any other ideas?

    Please sign in to vote.
  • Badly phased lights

    Created by christhebull // 0 threads

    Heading westbound along Bridge Road towards the junction with Rownham Hill, one sees a narrow (90 cm wide) cycle lane leading to an ASL (lacking the appropriate markings), however, the main issue with this junction is the time given to cyclists heading across Rownham Hill into Ashton Court Estate. A slow cyclist who passes the stop line just after the signals turn amber will struggle (uphill) to cross towards the gatehouse before traffic coming up Rownham Hill gets a green light. As cyclists will have previously navigated the debacle that exists on both sides of the Suspension Bridge, this is hardly a welcoming introduction to what is actually a very nice estate to ride around.

    Please sign in to vote.
  • Dangerous cycle lanes in Ipswich Town Centre

    Created by Andrea // 3 threads

    In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?

    Please sign in to vote.
  • South Gloucestershire A38 consultation

    Created by christhebull // 1 thread

    South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:

    Northville Road Roundabout
    Filton Roundabout
    A38 / Filton Avenue Junction
    A38 Patchway Slips

    The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.

    What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!

    Please sign in to vote.
  • North Cambridge 20mph consultation closes today

    Created by Ian Jackson // 0 threads

    DUPLICATE ISSUE OF
    http://www.cyclescape.org/issues/74-20mph-limits-in-cambridge
    - PLEASE RESPOND THERE.

    ---

    The Cambridge City Council's consultation on 20mph speed limits in North Cambridge closes today.

    Here is the URL:
    https://www.cambridge.gov.uk/20mph-speed-limit
    If you haven't already done this survey, please do so.

    (I have said that I agree with all the proposals, and indeed that they don't go far enough.)

    Please sign in to vote.
  • Cyclists Dismount (Golden Hind Post Office)

    Created by Ian Jackson // 1 thread

    There are "Cyclists dismount and use footway" signs at some roadworks on Kings Hedges Road SE-bound outside the Post Office near the Golden Hind.

    I spoke to a worker who said the sign had been put in by their traffic management team, after getting permission from Cambridgeshire County Council.

    I have phoned the County who say one of their traffic management people will phone me back.

    I have also made this FOI request:
    https://www.whatdotheyknow.com/request/roadworks_traffic_management_cor

    Please sign in to vote.
  • Redevelopment of Ida Darwin site: SCDC planning application S/1066/13/OL

    Created by David Earl // 1 thread

    Ida Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE

    Approval is sought for a. A development brief for the Fulbourn and Ida Darwin hospital sites and b. Outline Planning Permission for the redevelopment of the Ida Darwin Hospital site with up to 180 dwellings (C3) including affordable housing, a 70 unit Extra Care facility (C2) with access and associated works, open space and landscaping, following the demolition of existing buildings on site.

    Please sign in to vote.
  • Cycle route not obvious from road

    Created by ambrosen // 0 threads

    Turning right, eastbound from Weston Road to Victoria Park the cycle path (marked as a footpath on the map above, but signed in roundels once in the park) is not marked at all from the road.

    A pointer showing the existence of the path would be great. Even better would be a turn refuge from the centre of Weston Road.

    Please sign in to vote.
  • Joining Bath Spa Uni with Bristol-Bath Railway Path

    Created by ambrosen // 1 thread

    For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.

    I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.

    Please sign in to vote.
  • Potholes on Cumberland Road

    Created by carlystevens1989 // 1 thread

    There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.

    Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.

    It would also be useful if this side of the road had cycle markings like the other side.

    Please sign in to vote.
  • Roundabout by Radnor Gardens

    I think I’m correct in saying that several months ago the kerb at the junction of Strawberry Vale and Waldegrave Road was realigned with the result that the cycle lane that had previously continued up to the stop line was cut short at the point where the kerb was realigned. Photo 1341 -1 shows this quite clearly. I cycle along this road fairly frequently and had recognised this as a dangerous point for a cyclist but did nothing about it other than taking care. On Monday however my alertness paid off as a large lorry overtook me about 8 – 9 metres back from the stop line. Had I not braked hard it would have undoubtedly have hit me. The alignment of the kerb creates a pinch point which a cyclist is funnelled into without any warning.

    It appears to me that the needs of cyclists have been ignored in the redesign of this junction and that a road safety hazard has been created.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top