Ashton Vale to Temple Meads Metro Bus excl Centre Loop
Cycling provision totally inadequate in proposals.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Cycling provision totally inadequate in proposals.
Created by Jon Warbrick // 1 thread
Contractor's safety fencing for some of the work going on adjacent to Addenbrookes has been put up on the adjacent cycle path, presumably because it's easier to to that than put it up in the building site itself. Unfortunately this obstructs about a third of the path.
Whoever did this obviously realised that this was problematic, since they have painted the path side of all the bases yellow. Unfortunately this doesn't help in the dark.
I can't see any obvious contact details for the contractors, apart from 'Tamdown' on an attached 'Danger - Deep Excavation' sign. Anyone any idea how to get this addressed?
Notice is herby given that Southampton city council
proposes to make the following
The City of Southampton(various roads)
(movement restrictions)(amendment no9)order 2013
1. the effect of the order is to remove the contraflow cycle lane on
second avenue between first avenue and the north-westernmost
access to the NXP site, approximately 150metres south-east of allington
road thus reverting this part of second avenue to two way traffic. The
contraflow cycle lane will remain on the part of second avenue between
the north-westernmost access to the NXP site and allington road.
2.Copies of the order, relevant map and statement of reasons for
proposing may be inspected during normal working hours at my enquiry
office. Further information may also be obtained from the Southampton
Highways Partnership (traffic management) on 02380798064
3.Any person wishing to object to the order must write to at the
address given below or email:
Traffic.Orders.legal@southampton.gov.uk stating the grounds for
objection within 21 days of this notice (i.e. by 2 August 2013)
Dated 12 July 2013
Richard Ivory Head Of Legal, HR and Democratic Services,
Created by Sam Saunders // 0 threads
The Brunel Mile is a notional route between Millennium Square and Temple Meads Station. A video (date uncertain) on the Better By Bike website shows the intended journey. http://www.betterbybike.info/video-list/millennium-square-to-bristol-temple-meads-along-brunel-mile
Some of the route shown in the video corresponds with Bristol Cycling Campaign's important orbital freeway: Fo1 Inner Loop Redcliffe Way to Triangle. (see https://maps.google.co.uk/maps/ms?msid=213139683046776952805.0004d820d652973f23c70&msa=0&ll=51.491805,-2.665343&spn=0.025758,0.032959&dg=feature) To enable a network to develop coherently as it grew, Fo1 would be our recommended route.
As it stands (July 2013) there is only one short section of the Brunel Mile that meets a majority of the criteria that would characterise a cycling Freeway, namely the segregated cycle lane across Redcliffe Bridge which fails only on the "continuous" criterion. It seems important that all of it should do, as a priority, given that sections of the Brunel Mile are very heavily used by cyclists and pedestrians, especially at peak times. For many visitors coming by train with cycles or using the Brompton Dock at Temple Meads this will be a first experience of cycling in Bristol. It needs to make sense and to be easy to use first time.
Issues and suggestions, as things stand, are as follows
1. Pero's Bridge already has too much pedestrian and cycle traffic. It is often uncomfortable for pedestrians and for cyclists. Keeping it as part of a major cycle route through the city is unacceptable. Route Fo1 uses Prince Street instead, where a wide segregated cycle lane would be feasible.
2. The Royal Oak Avenue, Queen Square and Bell Avenue sections would benefit from clear segregation of pedestrians and cyclists, along the lines suggested by the de facto segregation that tends to happen at peak times.
3. The pedestrian and cycle crossing at Welsh Back might benefit from an analysis of behaviour at that junction and consideration of standards adopted in other places. Casual observation suggests a great deal of uncertainty among all road users as to what is supposed to happen and who has priority.
4. At the end of Redcliffe Bridge cyclists are faced with uncertainty as to whether to continue along the paved area beside Freshford House or use the pavement alongside Redcliffe Way. Signage at that point (as it is all along the route) is confusing, inconsistent and unspecific.
5. Crossing Redcliffe Street by cycling straight over the zebra crossing and expecting cars to stop seems to be condoned, and practised. This doesn't feel right and matches no standards that I am aware of. A clear decision needs to be made about how cyclists and pedestrians can cross here without arcane knowledge of "Bristol Rules". Many of those using this (as on the other crossings on the Brunel Mile) are visitors to the city on their first mile of city cycling.
6. The following section of Portwall Lane could be made into a fully segregated cycle lane, with a better crossing at Phippen Street. The numbers of pedestrians, cyclists and out-of-office smokers on this section can be very high and leaving the traffic to fend for itself is inimical to a genuine 8-80 environment.
7. At the end of the Portway there is great ambiguity about how to reach Temple Meads on a bike. The Better By Bike video shows the least satisfactory option that ends abruptly on the wrong side of Temple Way with two busy pedestrian crossings and an unsatisfactory cobbled road to negotiate before reaching the front of the station. Most cyclists seem to use one of the more direct routes over light controlled crossings to The Friary, thence to the side entrance of Temple Meads where the presence of the Brompton Docks and the Cycle Hub van give a natural welcome.
8. Development work on the derelict "island" around Portwall Road East should take full account of the existing use of that section as a crossing point for cyclists and pedestrians getting to and from Temple Meads Station.
In conclusion, A cyclist coming off the platforms at Temple Meads should be able to see very clear signs about which exit to use, and which path to use to get to Bristol City Centre. At present there is nothing at all. Once they have made an exit they should be able to see cycling specific signs that are prominent and clear. They should then be able to follow a designated route that is self-evident and waymarked. The current pedestrian signs are elegant and have good maps, but they are no more use to cyclists than they are to motorists.
A cyclist wanting to get to Temple Meads Station from Bristol City Centre should be able to find the Brunel Mile (on Fo1) from wherever they are without too much difficulty, and then follow it confidently all the way to the railway platforms.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by Eric Booth // 1 thread
I need to report a problem with a route in Whitehall. The council made a hoohaa about linking the cycle path to St George Park. They installed a contraflow in Stretford Road, a bike crossing over Whitehall Road and signage between the cycle path and the park. Laudable. I have used this route to take my daughter to Whitehall Primary School on Johnsons Road for the last year. She had her first Bikeability Lesson on Sunday and is now riding to school (aged 6 - v. proud!!). However, where the link goes through a snicket between the Kings Head pub and Packers Field it is being blocked by cars. This is making navigating a blind corner even more dangerous. Links to pictures below.
A lot of money was spent on this link and its being rendered unusable.
Created by Clare Causier // 1 thread
This afternoon the guidedbusway was closed from Cambridge Regional College to Histon. There was a security guard in a car who provided information on the closure and diversion. However, there was no diversion signage for cyclists or pedestrians.
When I returned home I checked cambridgeshire roadworks for further information but drew a blank.
Is anyone aware if works on the busway is covered by any public notification system?
Saturday afternoon is not a bad time for maintenance, but I imagine commuters would appreciate notice of works which affect their journeys.
Created by Chris Lowe // 1 thread
This section of towpath has been reported as having a poor surface. (Not sure how far north of Bournville Station the issue extends)
Using tarmac rather than breedon gravel has been requested, to be harder wearing and retain a good surface longer.
Created by Chris Lowe // 0 threads
Path reported to be poorly surfaced and in need of resurfacing.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Eric Booth // 1 thread
Another pinch point issue being installed on Whiteladfies Rd as part of the St. John’s Primary School Expansion which links the school in Worrall Road to the new site at the old police station at Lower Redland Road. Looks bad at the moment as there's just the buildout but signals will follow.
BCC Engineer states:
"In terms of specific cycle facilities we are making a number of improvement to the area:
Adding a 1.5 metre uphill cycle lane on Whiteladies Road near the Grove Road area (existing signalised crossing is to be removed).
Adding a 1.5m uphill red surfaced cycle lane (without markings) through the crossing on Whiteladies Road near Lower Redland Road.
Adding a continuous contra-flow cycle lane through the 2 one-way sections of Lower Redland Road (which was requested by cyclists in the area).
Created by Hester Wells // 0 threads
Temporary traffic lights for building works between High Cross and Charles Babbage Road.
I have received the following from our building facilities manager as these lights affect access to our building, and two others.
"1. With effect from Monday 22 July there will be 3-way traffic lights positioned between the existing Charles Babbage Road and new CBR. This will last for 1 week. The lights will be installed on Friday ready for operation on Monday. These lights will have an operator to monitor traffic flow during peak periods (8.30am – 9.30am and 4.30pm to 5.30pm). Outside of these times the lights will operate on sensor detection for queued vehicles to avoid unnecessary queuing, and will automatically sequence between the roads when no traffic is present. Unfortunately the lights will not detect and activate for cyclists and cyclists will need to wait for the lights to operate on the normal sequenced rotation.
2. Following the initial works and as work progresses along CBR, the traffic management will become 2 way light operation along the High Cross Access Road the CBR and this is expected to commence from Monday 29 July for a further 2 weeks.
3. During the above the New CBR and Access Road to Schlumberger are being prepared and tarmacked – kerbs are being installed etc. Surfacing is to be complete by 12 August ready to opened for use by all to access via the New CBR after 12th August.
4. Also after 12 August works will commence on finalising the junction at AVEVA/New Data Centre access and this will have 3 way traffic management and is expected to take 3 weeks.
5. Finally the access road into site via High Cross will close from week commence 19 August and this will be for approximately 7 weeks. This closure will be fully diversion signed from Madingley Road and around the site with diversion management (sighs) taking us via JJ Thompson Road and round to AVEVA from there. However there will be a trial closure of the High Cross Road entrance on the Thursday/Friday 15th & 16th August prior to the work starting on 19th, just to ensure all the signage is correct and easily followed. "
I am interpreting this as at least 6 weeks of temporary traffic lights which will not detect people on bikes.
I suspect cycle detection was only mentioned because I had specifically asked this question when the issue of temporary traffic lights first came up.
I have sent a message back to our facilities manager saying that I don't think this is acceptable as:
1) Cycle usage is nearly as high has car usage here in summer
2) I also see people using this as a through-route for Coton
3) We are on a side road off a through-route for buses, so I suspect the lights on their normal sequence will not be at all favourable for a person on a bike trying to get out, as the normal sequence will not want to disrupt bus flow too much.
4) I fear that the complete lack of provision will lead to some people breaking the rules, which could be dangerous.
However, she is merely relaying these details to us and is not responsible for it. She can contact the site project managers about any issues, which I hope she will do.
Any other ideas?
Created by christhebull // 0 threads
Heading westbound along Bridge Road towards the junction with Rownham Hill, one sees a narrow (90 cm wide) cycle lane leading to an ASL (lacking the appropriate markings), however, the main issue with this junction is the time given to cyclists heading across Rownham Hill into Ashton Court Estate. A slow cyclist who passes the stop line just after the signals turn amber will struggle (uphill) to cross towards the gatehouse before traffic coming up Rownham Hill gets a green light. As cyclists will have previously navigated the debacle that exists on both sides of the Suspension Bridge, this is hardly a welcoming introduction to what is actually a very nice estate to ride around.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Ian Jackson // 0 threads
DUPLICATE ISSUE OF
http://www.cyclescape.org/issues/74-20mph-limits-in-cambridge
- PLEASE RESPOND THERE.
---
The Cambridge City Council's consultation on 20mph speed limits in North Cambridge closes today.
Here is the URL:
https://www.cambridge.gov.uk/20mph-speed-limit
If you haven't already done this survey, please do so.
(I have said that I agree with all the proposals, and indeed that they don't go far enough.)
Created by David Earl // 1 thread
Cambridgeshire County Council proposes traffic lights on Sawston bypass where NCN11 and the northern link to Sawston meets it. However, the plan is for cyclists to have to cross three separate sets of lights.
Created by Ian Jackson // 1 thread
There are "Cyclists dismount and use footway" signs at some roadworks on Kings Hedges Road SE-bound outside the Post Office near the Golden Hind.
I spoke to a worker who said the sign had been put in by their traffic management team, after getting permission from Cambridgeshire County Council.
I have phoned the County who say one of their traffic management people will phone me back.
I have also made this FOI request:
https://www.whatdotheyknow.com/request/roadworks_traffic_management_cor
Created by David Earl // 1 thread
Ida Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE
Approval is sought for a. A development brief for the Fulbourn and Ida Darwin hospital sites and b. Outline Planning Permission for the redevelopment of the Ida Darwin Hospital site with up to 180 dwellings (C3) including affordable housing, a 70 unit Extra Care facility (C2) with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Created by ambrosen // 0 threads
Turning right, eastbound from Weston Road to Victoria Park the cycle path (marked as a footpath on the map above, but signed in roundels once in the park) is not marked at all from the road.
A pointer showing the existence of the path would be great. Even better would be a turn refuge from the centre of Weston Road.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream
Created by Shaun McDonald // 1 thread
Improving the connectivity from Bourne Hill over the A14 to Wherestead with dropped kerbs, allowing cycling and signing as a cycle route would be a step in the process to improving cycle access south from Ipswich to various places including Jimmy's Farm (a family leisure venue, which should be cycleable to by a family with young children), Shotley Peninsula, and the land route to Harwich International ferry port for cycling to The Netherlands.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Andrew Woodward // 1 thread
The bridge between Dean Rd and Longford Close is currently a pedestrian only bridge, marked no cycling. Coupled with other improvements, provision of a decent facility here that could be used by cyclists with minimal conflict with pedestrians would open up a decent quiet route from the schools in Hampton (Hampton Academy, Hampton Boys, LEH) to the A316 cycle route.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...