Potential route Beacon to Station
Often talked about
aspiration in FifePlan
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Often talked about
aspiration in FifePlan
Created by M Stanley // 1 thread
West Yorkshire combined authority are consulting on improvements to cycling and walking links in Pudsey with the aim of improving access to New Pudsey station
Anon // 1 thread
Borough Road - Healthy Streets
Closes 4 Nov 2019
Opened 8 Oct 2019
Contact
Joanna Lesak
(Project Manager)
Overview
We would like to know your views on proposals for Borough Road. We are proposing improvements to the environment to encourage cycling and walking in line with the Healthy Streets approach. Borough Road is part of London's wider strategic cycle network as well as the council's Southwark Spine route, and together with Harper Road links Cycleway 6 at St George's Circus to Cycleway 17 at Falmouth Road creating a strategic east-west route.
The key measures proposed are
Please respond to the online questionnaire below by 4 November 2019.
Background
In 2014 over 1400 people in Southwark were consulted by the council on cycling, and the proposed Southwark Spine cycle route was a key feature of the proposals, linking the north and south of the borough. The 2015 cycle strategy subsequently identified the Southwark Spine as a key deliverable to offer a direct, safe, attractive, comfortable and easy cycle route, for all ages and abilities.
Borough Road and Harper Road comprise the northern section of the Southwark Spine. Street improvements in Harper Road between the junction with Borough Road and Falmouth Road have been consulted on separately to link in with the proposed refurbishment of Dickens Square Park; a link to the informal consultation and updates on timescales of projects in the area are provided in www.southwark.gov.uk/harperroad.
Why We Are Consulting
We have identified a number of issues with the current road layouts that make Borough Road and Harper Road feel unsafe and intimidating for vulnerable road users, particularly cyclists, and that affect bus journey times.
Our proposals
We would like your views on the following proposals which aim to reduce these issues.
The proposals improve Healthy Street indicators including making it easier to cross the road, improving the environment for pedestrians from all walks of life, helping people feel relaxed and safe, and encouraging people to walk, cycle and use public transport. The results of the draft Healthy Streets check (subject to change) are shown in the spider graph below
Well used, but narrow, path.
Downhill section owned by FC, rest Forth Ports.
Before the railway came the Lammerlaws (Lamberlaws on some maps) stretched inland almost as far as the Parish Church.
Now it’s mostly thought of as the name for the ‘wild’ bit of the peninsula at the of Lammerlaws Road.
The Community Council produced an improvement plan for the area in 2018.
http://www.burntislandcc.org.uk/Index.asp?MainID=25915
The ambition has since been scaled back.
https://burgh.buzz/2019/09/17/burntisland-small-improvements-planned-for-the-lammerlaws/
The area is part of an SSSI so any work requires permission from SNH. It is expected to be given.
Created by chdot // 1 thread
WW2 pillbox
Has survived for 80 years and has recently attracted a small amount of vandalism
http://burgh.buzz/2019/09/04/vandalism-on-the-lammerlaws/
Needs a plan for conservation/interpretation
Presumed to be owned by FC
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Anon // 1 thread
Overview
Give us your views on proposals to introduce a new section of bus lane on Croxted Road.
We want to improve bus journey times along Croxted Road, as it has been identified that buses experience delays along this section, in particular just south of the junction with the A205 South Circular Road - northbound buses are sometimes unable to access the bus stop due to a combination of queuing traffic and parked vehicles upstream of the bus.
In order to support this, we are proposing to introduce a short length of northbound peak only bus lane installed between the junction of Ling’s Coppice and the bus stop south of the A205 South Circular Road (Stop WS). The bus lane will operate from 7am-7pm Monday to Saturday and would require introduction of new kerbside restrictions of no waiting and no loading to match the operational hours of the bus lane i.e 7am to 7pm Monday to Saturday. To support these changes on the western kerbline, it is also proposed to introduce no waiting/no loading restrictions on the eastern kerbline during bus lane hours.
These proposals should improve journey times for passengers using the route 3, which is a high frequency service between Crystal Palace and Trafalgar Square. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
We would appreciate your views on these plans, and whether there are any issues that we should take note of.
Why We Are Consulting
We would be grateful if you could take the time to review the proposal attached below and let us know what you think using the online questionnaire.
Your views are really important to help us make sure the final design meets the needs of the local community.
Concern at September Community Council about need for barrier to discourage young people from running into the road on way to Music Hall.
19/1212/FUL | Demolition of the existing octagonal building and erection of two new student accommodation buildings comprising 23 rooms. Replacement of existing gardeners accommodation with free-standing gardeners' building, replacement of cycle storage, new boundary and entrance treatment. | St Chads 48 Grange Road Cambridge Cambridgeshire CB3 9DH
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
As part of the City Council's plan to build 500 new homes in Cambridge by 2022, Cambridge Investment Partnership (CIP) is proposing to build around 78 new council-rented homes and a new community facility on Campkin Road.
Tom McKeown // 1 thread
Planning for a direct action to close Station Road.
Created by JonC // 1 thread
The Countryside Management Service is currently developing a Greenspace Action Plan for the Ayot Greenway. Attached (see thread) is the briefing document which explains more about the community engagement and plan production process. This briefing document is being sent to relevant local stakeholders. There will be further engagement on a draft plan during January and February 2020.
We would welcome any comments you may have on the objectives proposed, or your thoughts on the future management of the Ayot Greenway. Should you have any questions, or if you would like to meet to discuss the plan, please get in touch with me using the contact details below.
Rhiannon Barton, Trainee Land Management Projects Officer
Countryside and Rights of Way, Environment and Infrastructure Department
Hertfordshire County Council I County Hall I Pegs Lane, Hertford I SG13 8DN I Postal Point: CHN101
( 01992 555173 (Comnet 25173) Email: Rhiannon.Barton@hertfordshire.gov.uk
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Outline application (all matters reserved except for means of access in respect of junction arrangements onto Worts' Causeway and Babraham Road) for erection of up to 230 residential dwellings (including affordable housing), community facilities within Use Classes A1/A2/A3/A4/B1/D1/D2, new landscaping and public realm, car and cycle parking, infrastructure, other associated works following the demolition of all existing buildings on the site.
Created by Sylvia Gauthereau // 1 thread
Brent Council:
Overview
We are proposing to pedestrianise part of Oaklands Road (between Oaklands Passage and Cricklewood Broadway) and create a Liveable Street by removing general traffic and improving the urban realm.
Why We Are Consulting
The proposed scheme aims to create a new, high quality, calm and interactive community space in the heart of Cricklewood. This supports the Council’s commitment to improving our town centre environments, encouraging walking and cycling and improving air quality. It will also establish a less congested environment for the long-standing fruit and vegetable stall and an accessible and safe route for pedestrians, cyclists and people with mobility difficulties.
Created by Hounslow Cycling Campaign // 1 thread
The Liveable Neighbourhoods project in south Chiswick combines a range of schemes across the Grove Park and Dukes Meadows area that focus on increasing the number of trips made by foot, bike and public transport while improving local public space.
Hounslow Council has secured funding through Transport for London’s Liveable Neighbourhood programme to progress this project. Certain elements of the project are well defined, such as the proposed pedestrian bridge under Barnes Bridge and a new public square in Grove Park near to Chiswick Station. Alongside this there are also broader aims to provide improved walking and cycling links across the area while also looking to address well known issues of excessive traffic volumes and speeds in residential areas, which are often used as cut-through to access major roads.
Richard G // 1 thread
Default traffic light phase is for red on the vastly more used busway/cyclepath, rather than for the infrequent crossings of Hobson Avenue.
How to go about changing it
Created by Roxanne (CEO) // 1 thread
GCP project:
Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.
Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.
By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.
A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.
The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.
Created by Jean Dollimore // 1 thread
Camden is consulting on a proposed Healthy School Street zone around the following schools:
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Simon Munk // 1 thread
From Hackney council:
Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road
We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.
Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:
Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.
Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.
The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.
What are the proposals?
The following measures are proposed:
Queensbridge Road raised cycle tracks
Dunloe Street shared zebra crossing
Hackney Road junction improvements
Kent Street raised entry table and zebra crossing
Refurbishment of pavements and carriageways
Whiston Road junction
Please download the plans below for more details
Layout plans from Hackney Road to Whiston Road
Layout plans from Hackney Road to Whiston Road
Detail 1: Dunloe Street junction
Detail 2: Hackney Road junction
What are the potential impacts of the proposals?
Parking
Future schemes
The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:
What happens next?
Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk
To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations
Permanent works
If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.
Frequently Asked Questions
Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?
A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.
Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?
A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings
Created by Edward Leigh // 1 thread
We know we need thousands more cycle parking spaces in future to meet ambitions to reduce car trips into the city and cope with the huge population and employment growth that the region is already committed to in its Local Plans. There is very little highway space available in the city centre, so we need to re-purpose other spaces, such as multi-storey car parks. I want to see if we can develop a policy to put to the City Council that they could act on. We've been discussing locations for new cycle parks for years (see linked Camcycle article), so what's the hold-up?
Created by Jean Dollimore // 1 thread
Camley Street Neighbourhood Forum proposes a neighbourhood plan for the area shown in the image with this issue
Demolition of existing building and construction of 3no two storey dwellings, with additional living accommodation in the roof of each, and 1no 2 storey detached dwelling, with private access drives to the front and rear, amenity space and landscaping.
https://idox.cambridge.gov.uk/online-applications/simpleSearchResults.do?action=firstPage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The route through Verulamium Park towards the museum was built to substandard width. There is a considerable risk that this will cause conflict between walkers and cyclists.
Route widening is not due until the Green Ring is built in 2015.
STACC will campaign for widening of the route to begin as as soon as possible since we see no need to delay waiting for the Green Ring.
Resurfacing of the Alban Way begins in September 2013- this project draws upon Green Ring funding so why can't Green Ring funding be deployed now to widen the Ver Park route?
Created by Angela Dyer // 0 threads
Convert footpath between Watling St & Coningsby Bank, near the Park St roundabout, to a bridleway & resurface.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Andrew Woodward // 0 threads
The towpath from Richmond to Teddington lock is currently unappealing and dangerous. These photos were taken in May and the path is a lot worse after in winter or after a spring tide.
It is sufficient for people on mountain bikes who do not mind getting muddy, but not easy for children, older people, less confident cyclists, pedestrians with buggies, cyclists on cargo bikes etc to navigate - basically all the vulnerable road users who would most benefit from avoiding the busy, fast moving traffic on the narrow winding Petersham Road.
I take this route to work and I have to plan for the fact that I will get covered in mud every morning, and take it very slowly because it is so bumpy. I have seen pedestrians and those with child buggies climbing over the flood wall and walking on the grass on Petersham field in order to avoid this path. When I have my child in the bike seat I get off and walk the section between Ham House and River Lane that is pictured as I don't feel safe.
With a bit of thought this path has the potential to be an excellent car-free cycling and walking route that would tempt people out of their traffic jammed cars on Petersham Road.
See also the discussion at http://www.cyclescape.org/threads/811
Created by Paul L // 0 threads
The demand for cycle parking exceeds the supply in this important shopping area.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Charlie Halliday // 1 thread
Proposed changes to Elles Road crossing creating a corral style refuge and improving sight lines by removing vegetation.
Proposed changes to centre of roundabout to create cycle paths.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
The link is scheduled to be closed for water main installation for six weeks from 30 September.
Nearest alternative ways to cross the railway line are Sandpit Lane (busy road with splitter islands!) or bridge link to York Road (nice and quiet but steps to bridge)
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by Andrew Woodward // 1 thread
Dear RCC - I have written because of a junction which is a frequent danger spot to cycle through. It is the junction where Dukes Avenue and Tudor Drive intersect with the A307 Upper Ham Road and Richmond Road.
1. The painted arrows in the middle of the junction suggest that turning traffic should pass on each other's left. This creates a serious blind spot for oncoming traffic and for the cyclist turning. Traffic code 181 suggests vehicles can pass either way but highlight that left to left is the more dangerous for this reason. 90% of the time motorists pass according to how the arrows are painted leaving a cyclist who is turning blind to oncoming traffic. The 10% of the time when a vehicle decides to turn right to right this puts them head on with a vehicle who may have decided to pass left to left. Very dangerous for a cyclist in either situation, there does't seem to be a safe way to tackle this junction as what ever you do.
https://www.gov.uk/using-the-road-159-to-203/road-junctions-170-to-183
2. Recently I was waiting to turn right on this junction (left to left position) when a motorist behind me undertook me to place himself to my left blocking oncoming traffic to pass on my left and therefor forcing them to drive at me and pass on my right. Simply because he didn't want to wait behind me until the coast was clear that I could turn.
3. Needless to say the ASL's at this junction are almost completely ignored.
I hate cycling past and turning at this junction. Is there any way it can be improved to become safer for cyclists? A short head start (green light for cyclists) would be ideal but I doubt this will ever happen.
Google Streetview shows the problem nicely: http://goo.gl/maps/8gdo2
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
Created by Gerhard Weiss // 0 threads
Superhighway 3 on cable street is also a rat run. Cell 1 marks the area bounded by 'logical' cell boundary streets. There should be no through motor traffic within this area