access path needs repair
The access path from Monk's close, incorrectly shown on the above map as Monk's Gate to the recently resurfaced Alban way on route 61 could also do with an upgrade
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Willem Hofland // 0 threads
The access path from Monk's close, incorrectly shown on the above map as Monk's Gate to the recently resurfaced Alban way on route 61 could also do with an upgrade
Created by Shaun McDonald // 0 threads
Further to http://www.cyclescape.org/issues/928-paper-mill-lane-alterations-planning-application I think it would be useful to campaign for a cycle and walking link from the site through to the retail park with major supermarket and other amenities, and also other links to that western part of Ipswich.
In my quick skim through the planning application I've not seen any consideration to this route.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by David Earl // 4 threads
The erection of new student housing (257 study bedrooms) and associated communal facilities, cycle parking, and external landscaping following demolition of the existing buildings. Wests Garage Ltd 217 Newmarket Road Cambridge CB5 8HD
(see in particular Ground Floor Plan under Documents)
Created by Tim Burford // 0 threads
I couldn’t tell from the Cyclescape map interface whether there is already a thread on the crossing at the northern junction to Sawston - but I see that it is now being rebuilt, and there seems to be a quite a sizeable central island. Did the inadequate plans get changed? (and why has there been no mention of this if so?)
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Jon_B // 1 thread
This junction has recently been "upgraded", but it still has a single lane at the lights, with a left filter arrow which turns green before the main light to proceed straight ahead.
If you are waiting to proceed straight ahead this effectively means you are marooned in the middle of the junction with traffic behind you waiting to turn left.
Not much fun in a car either, but it is considerably more unpleasant and dangerous on a bike.
I'm not sure if there is an answer other than removing the left filter cycle.
There is a general difficulty with decent routes from this area north up to Woodbridge Road in the rush hour, and this would seem like the best route if it were not for this issue.
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Matthew Phillips // 0 threads
The picture shows the view as a cyclist, waiting at the lights on Church Street. Considering the numbers cycling to the university it is extraordinary that the recent remodelling of the junction (2010, with further work on completion of the Palatine Centre) made no provision for cyclists.
It is not obvious how cyclists are meant to access the shared-use paths on campus from this junction, or how to rejoin the road from the campus.
Basic features like advanced stop lines would help, but even better would be a general "green phase", not permitted as yet in UK but under consideration by the DfT. This concept involves green lights for pedestrians and cyclists simultaneously for all directions and is very successful in the Netherlands. It's also what tends to happen, in reality, to some extent at this junction already. Couple it with cycle lanes approaching the junction from each direction instead of the wasteful dual car lanes, and this would be a big improvement.
Created by Matthew Phillips // 0 threads
The photo shows the entrance to Durham Johnston school. Sweeping curves allow fast access to/from the main road, and the cycle path basically gives out. OK, this is probably not a busy side-road, but why on earth can we not have a level, moderately straight route for the cycle path, with priority over the vehicles turning in or out of the school? A raised table to make it clear that motor vehicles should give way. There are plenty more examples along the A167 route of side roads that could do with similar treatment.
Created by Matthew Phillips // 0 threads
A generation ago, cars, lorries and buses drove up and down Silver Street and Elvet Bridge. Now it is pedestrianised (with lorry access for deliveries from 6pm till 10am or 11am). Unfortunately no-one considered cycling provision.
Although Silver Street is busy at lunch times and early evening, Elvet Bridge is never so busy as to make allowing cycling unduly risky for pedestrians. Cyclists are already allowed throughout the day on Saddler Street (as are cars) and that street is much busier. So I think cycling should be allowed on Elvet Bridge all the time, in both directions.
On Silver Street, cycling ought to be allowed, again in both directions, whenever deliveries are allowed. In the mornings this would be up to 10am. While there are pedestrians using the street, there are not vast numbers at that time, but opening it to cyclists would be very useful for people travelling to work.
Obviously, other factors would need to be addressed, such as some of the one-way streets approaching Framwellgate Bridge on the west side, and turning out of Elvet Bridge at the east end.
Relaxing these restrictions would open up a lot more options for cyclists.
Created by Matthew Phillips // 0 threads
New Elvet slopes up steeply as you travel south, so cycling is slow. There are two issues which make cyclists feel particularly vulnerable.
A. On the left there are diagonal parking bays by the shops, with vehicles sticking out into the road, particularly a large van which is often there. Cyclists have to give these a wide berth but then they feel vulnerable to cars wanting to overtake.
B. The second issue is the left filter on the lights to Hallgarth Street. As the road splits into two lanes, it is particularly tricky if you want to turn right into Church Street: if you stay too far left, cars overtake you and then turn across you to the left. If you manage to move over to the right the lanes are narrow and you're conscious of holding up all the cars.
Possible improvements:
A1) Remove the parking by the shops: it's not actually used much by shoppers as most vehicles have resident permits.
A2) Make the parking by the shops parallel to the road.
B1) Reduce the approach to the lights to a single lane, and abolish the left filter into Hallgarth Street. This would also make it easier for pedestrians crossing the mouth of Hallgarth Street where there is no pedestrian phase and no way to see any of the traffic lights to tell if you're safe to proceed.
Another, more radical, option would be to remodel the road layout by carving an uphill cycle lane of reasonable width through the pavement by the shops, to the left of the parking (probably realigning the parking to be parallel) and giving the cycle lane its own phase on the lights at Hallgarth Street so that cycles can get wherever they need to without conflicting with other traffic. Options for making Church Street one-way, or for private vehicle access only from the New Inn end, could also be considered.
Making Elvet Crescent two-way for bikes might reduce the need to cycle up New Elvet, but it's still the most direct route for various purposes so it's not an adequate solution on its own.
Created by Paul L // 0 threads
At the end of Adelaide Rd is a large GP Practice and a dentist. There is no space immediately here but there is space on the opposite side of Park Rd. accessed by a zebra.
Created by Jack Thurston // 0 threads
Frogmore Street is one-way (SE to NW). It needs a cycle contraflow to allow cyclists access from the north/west end of the town to this main commerce street.
A cycle contraflow would achieve this objective. It would also be necessary to reconfigure the junction at the north end of Frogmore Street.
Created by Jack Thurston // 1 thread
There are currently around 6 or 8 cages for cycle parking. One bike per cage. While this is great for anyone lucky manages to find an unused cage, often they're all used. Some additional Sheffield type stands required.
Created by TMiles // 0 threads
Cyclists benefit from an almost continuous cycle or bus lane along the A660 from the city centre. This route is much used by students cycling between central university campuses and accommodation in north-west Leeds.
After the central traffic lights in Headingley, the cycle lane ends and the road narrows. Although the road later widens out to two lanes, there is a stretch (marked on the map) where cyclists have insufficient space on what is a busy radial road.
There are two possible solutions here. The first would be to widen the north-west bound lane to allow a standard width cycle lane to be marked out. The second option would be to add a phase into the traffic light sequence that grants cyclists a ~10 second head start to clear this narrow stretch. This solution could involve detectors in the cycle lane upstream of the lights to avoid its unnecessary activation. It would also allow cyclists to position themselves better for the next junction, where traffic is split into two lanes.
Created by TMiles // 0 threads
West bound traffic on Burley Road approaching the crossroads is segregated into one lane of buses and cycles and one lane of all other traffic. A set of traffic lights 100m from the crossroads gives alternating priority to these two streams: one sequence holds back cars to allow buses to pass through, the other sequence retains the bus lane.
Under the current layout, cyclists that wish to turn left into Willow Road can find themselves detained for some time. They are held back by red lights and lack the room to trickle forward to the later set of traffic lights without coming into conflict with other road users.
However, left-turning cyclists would be able to trickle forward if works were carried out to:
• Reprofile the pavement to allow the installation of a cycle lane following the line on the map.
• Create a bypass to the left of the bus lane lights so that cyclists can legally make headway.
It should be noted that the above measures are only intended for cyclists turning south. Under such measures the stream of traffic is always to the right of the cyclist.
Those going straight ahead (into Burley Rd.) or turning right (into Cardigan Rd.) should remain subject to the bus lane signals because their path crosses that of the other stream.
The current situation constitutes a bottle-neck on routes from the universities and parts of the city centre to Kirkstall and South Leeds. This crossover allows cyclists to access the higher-quality facilities on Kirkstall Road, and avoid the narrower Burley Road (where there is no cycle lane).
Created by MJR // 0 threads
There's a plan to redesign this street which has quite a bit of covered cycle parking at the moment, but no cycle parking is shown on the proposed layout.
An analysis appears at http://blog.jofftastic.co.uk/2013/12/peterborough-city-council-anti-cycling/
Comments on/to http://www.peterborough.gov.uk/community_information/consultation_and_engagement/current_consultations/long_causeway_scheme.aspx by 20 December
Martin Lucas-Smith // 1 thread
Corn Exchange Street contraflow is to close temporarily.
Advanced notice of temporary cycle lane closure (aka Woodburn Way) has been published in the Cambridge News. Cars apparently able to proceed, which I find puzzling.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Gregory // 0 threads
New road layout has been finished here, unfortunately I didn't get a chance to look at any plans before they started work. Despite cycling past on a weekly basis, I saw no notices.
It's not too bad, and extra lanes mean more space. However, I think it would be good to paint an ASL (cycle box) on at the Belmont Industrial Estate Junction. This will make cyclists feel a lot safer and give them a chance to cross the junction then get into a left-hand lane so motorists/lorries can over take after the junction (not dangerously overtake while turning).
On the industrial estate is a local church, two sports centres, the Royal Mail sorting office, and a number of small businesses. As a result, there is a lot more cycling here than there was 5 years ago. Yet there are lorries and now buses(the bus depot has moved here) causing possible space-tensions between road users.
Created by Shaun McDonald // 1 thread
https://consultations.tfl.gov.uk/streets/a1-holloway-road
A1 Holloway Road - Nag's Head
Overview
Transport for London (TfL) has developed proposals to improve road safety for pedestrians and cyclists on the A1 Holloway Road in the Nag’s Head area.
The main objective of the scheme is to put in place a pedestrian crossing on the A1 Holloway Road, enabling people to cross the road easily and safely and to improve access to businesses on the south-western side of the road.
In summary, the proposed measures include the following:
New signalised pedestrian crossing outside the Nag’s Head Shopping Centre
New cycle lanes in both directions
Advanced stop lines added to the junctions of Holloway Road and Tollington Road/Camden Road and Seven Sisters/Parkhurst Road
Resurfacing of the footway and carriageway
In order to make space for these improvements some other changes are required. These include
Relocation of the northbound bus stop (Stop L) approximately 50m north of its existing location
Changes to parking and loading provision, with and overall slight reduction in parking and loading availability
Loss of one small tree on the median island where the crossing will be located. There may also be the potential loss of one other small tree and two relatively mature trees due to kerb cutbacks required in order to relocate the bus stop.
Relocation of several items of street furniture including the removal of a redundant telephone box
The proposals are shown on the attached map. In addition to these proposals, an informal pedestrian crossing with a central refuge island is planned for the A1 Holloway Road adjacent to Jackson Road.
All of the measures that we propose are subject to change as a result of this consultation. Given no unforeseen issues, it is anticipated that the scheme will be implemented in Spring 2014.
Please gives us your views by completing our online consultation form below by Monday 6 January 2014.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.