Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first, limited to the area of Cyclenation:

  • Dangerous Snakey Path trail

    Created by DB // 1 thread

    I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways. 

    Please sign in to vote.
  • Croxted Road Bus Lane

    Anon // 1 thread

    Overview

    Give us your views on proposals to introduce a new section of bus lane on Croxted Road.

    We want to improve bus journey times along Croxted Road, as it has been identified that buses experience delays along this section, in particular just south of the junction with the A205 South Circular Road - northbound buses are sometimes unable to access the bus stop due to a combination of queuing traffic and parked vehicles upstream of the bus.

    In order to support this, we are proposing to introduce a short length of northbound peak only bus lane installed between the junction of Ling’s Coppice and the bus stop south of the A205 South Circular Road (Stop WS). The bus lane will operate from 7am-7pm Monday to Saturday and would require introduction of new kerbside restrictions of no waiting and no loading to match the operational hours of the bus lane i.e 7am to 7pm Monday to Saturday.  To support these changes on the western kerbline, it is also proposed to introduce no waiting/no loading restrictions on the eastern kerbline during bus lane hours.

    These proposals should improve journey times for passengers using the route 3, which is a high frequency service between Crystal Palace and Trafalgar Square. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.

    We would appreciate your views on these plans, and whether there are any issues that we should take note of.

    Why We Are Consulting

    We would be grateful if you could take the time to review the proposal attached below and let us know what you think using the online questionnaire.

    Your views are really important to help us make sure the final design meets the needs of the local community.

    Please sign in to vote.
  • 19/0212/FUL St Chads - student accommodation and cycle parking

    Created by Matthew // 1 thread

    19/1212/FUL | Demolition of the existing octagonal building and erection of two new student accommodation buildings comprising 23 rooms. Replacement of existing gardeners accommodation with free-standing gardeners' building, replacement of cycle storage, new boundary and entrance treatment. | St Chads 48 Grange Road Cambridge Cambridgeshire CB3 9DH

    Please sign in to vote.
  • Ayot Greenway Greenspace Action Plan 2020-2025

    Created by JonC // 1 thread

    The Countryside Management Service is currently developing a Greenspace Action Plan for the Ayot Greenway. Attached (see thread) is the briefing document which explains more about the community engagement and plan production process. This briefing document is being sent to relevant local stakeholders. There will be further engagement on a draft plan during January and February 2020.

    We would welcome any comments you may have on the objectives proposed, or your thoughts on the future management of the Ayot Greenway. Should you have any questions, or if you would like to meet to discuss the plan, please get in touch with me using the contact details below.

    Rhiannon Barton, Trainee Land Management Projects Officer

    Countryside and Rights of Way, Environment and Infrastructure Department

    Hertfordshire County Council  I  County Hall  I  Pegs Lane, Hertford  I  SG13 8DN  I  Postal Point: CHN101

    ( 01992 555173 (Comnet 25173)  Email: Rhiannon.Barton@hertfordshire.gov.uk

    Please sign in to vote.
  • Coldhams Lane

    Created by Paula Downes // 4 threads

    The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.

    Please sign in to vote.
  • 19/1168/OUT Land between Wort's Causeway and Babraham Road

    Created by Matthew // 1 thread

    Outline application (all matters reserved except for means of access in respect of junction arrangements onto Worts' Causeway and Babraham Road) for erection of up to 230 residential dwellings (including affordable housing), community facilities within Use Classes A1/A2/A3/A4/B1/D1/D2, new landscaping and public realm, car and cycle parking, infrastructure, other associated works following the demolition of all existing buildings on the site. 

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=PWLDTYDXGHA00

    Please sign in to vote.
  • Oaklands Road Liveable Street Scheme

    Created by Sylvia Gauthereau // 1 thread

    Brent Council:

    Overview

    We are proposing to pedestrianise part of Oaklands Road (between Oaklands Passage and Cricklewood Broadway) and create a Liveable Street by removing general traffic and improving the urban realm.  

    Why We Are Consulting

    The proposed scheme aims to create a new, high quality, calm and interactive community space in the heart of Cricklewood. This supports the Council’s commitment to improving our town centre environments, encouraging walking and cycling and improving air quality.  It will also establish a less congested environment for the long-standing fruit and vegetable stall and an accessible and safe route for pedestrians, cyclists and people with mobility difficulties.

     

    Please sign in to vote.
  • South Chiswick Liveable Neighbourhood

    Created by Hounslow Cycling Campaign // 1 thread

    The Liveable Neighbourhoods project in south Chiswick combines a range of schemes across the Grove Park and Dukes Meadows area that focus on increasing the number of trips made by foot, bike and public transport while improving local public space.

    Hounslow Council has secured funding through Transport for London’s Liveable Neighbourhood programme to progress this project. Certain elements of the project are well defined, such as the proposed pedestrian bridge under Barnes Bridge and a new public square in Grove Park near to Chiswick Station. Alongside this there are also broader aims to provide improved walking and cycling links across the area while also looking to address well known issues of excessive traffic volumes and speeds in residential areas, which are often used as cut-through to access major roads.

    Please sign in to vote.
  • Cambridge South West Travel Hub

    Created by Roxanne (CEO) // 1 thread

    GCP project:

    Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.

    Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.

    By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.

    A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.

    The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.

    Please sign in to vote.
  • Proposed New Healthy School Street Zone

    Created by Jean Dollimore // 1 thread

    Camden is consulting on a proposed Healthy School Street zone around the following schools:

    • South Hampstead High School (both junior and senior sites),
    • North Bridge House Pre-Preparatory School,
    • Southbank International School
    • Holy Trinity Primary School.

    Please sign in to vote.
  • Armley Gyratory Changes

    Created by M Stanley // 1 thread

    Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.

    Please sign in to vote.
  • Central London Cycle Grid Section 1: Queensbridge Rd b/w Hackney Rd & Whiston Rd

    From Hackney council:

    Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road

    We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.

    Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:

    • Section I: Hackney Road – Whiston Road
    • Section II: Whiston Road – Middleton Road
    • Section III: Middleton Road – Dalston Lane

    Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.

    Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.

    The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.

    What are the proposals?

    The following measures are proposed:

    Queensbridge Road raised cycle tracks

    • Installing two metre wide raised cycle tracks between Hackney Road and Whiston Road. These will be next to the existing pavements on both sides of the road. The raised cycle tracks will be separated from motorised traffic by a kerb and from pedestrians by a pedestrian/cycle separator (see example of a separator on page 11 in the FAQs section).
    • Installing a mandatory cycle lane on the carriageway next to the cycle hire scheme at Kent Street.

    Dunloe Street shared zebra crossing

    • Installing a raised table with a parallel pedestrian/cycle crossing (shared zebra crossing for pedestrians and cyclists) at the junction of Dunloe Street and Queensbridge Road. The parallel crossing will allow cyclists and pedestrians to cross Queensbridge Road under the controlled conditions of a zebra crossing. The raised junction table will provide a step-free pedestrian crossing and help with encouraging drivers to keep to the 20mph speed limit.
    • Closing Dunloe Street on both arms with Queensbridge Road to motor traffic to reduce the potential conflict between turning traffic and pedal cyclists and reduce rat running.

    Hackney Road junction improvements

    • Installing a raised entry table at the junction of Hackney Road and Horatio Street to provide pedestrians with step-free crossing facilities.
    • Replacing the existing traffic islands on Hackney Road with wider pedestrian-friendly traffic islands.
    • Refurbishing the road and pavements around the junction.
    • Removing clutter such as redundant guard railings and signs at the junction. Installing double yellow lines between the pedestrian crossings at the junction.
    • Installing low level cycle signals with early release crossing facilities for cyclists at Queensbridge Road and Horatio Street, subject to junction capacity.

    Kent Street raised entry table and zebra crossing

    • Installing a raised entry table at the junction of Kent Street and Queensbridge Road for a step-free pedestrian/cycle crossing at this location.
    • Installing a raised table for the existing zebra crossing at Edith Street to provide controlled step-free crossing facilities for pedestrians when crossing Queensbridge Road. Due to the nature of the road at this location, a parallel pedestrian/ cycle crossing was considered unsuitable.

    Refurbishment of pavements and carriageways

    • The existing pavements adjacent to the raised cycle tracks will be refurbished using standard paving materials. Blended pedestrian crossings will be installed at Kent Street and Dunloe Street side road junctions to highlight the priority of pedestrians over pedal cycles and motorised traffic from the side roads (see example of a blended crossing on page 11 in the FAQs section).

    Whiston Road junction

    • Installing ‘advanced stop lines’ (ASLs) for cyclists at the southern arm of Queensbridge Road connected to the raised cycle track with road markings.
    • Low level cycle signals with early release crossing facilities for cyclists will be considered as part of Section II between Whiston Road and Middleton Road.

    Please download the plans below for more details

    Layout plans from Hackney Road to Whiston Road

    Location plan

    Layout plans from Hackney Road to Whiston Road

    Detail 1: Dunloe Street junction

    Detail 2: Hackney Road junction

    Detail 3: Kent Road junction

    What are the potential impacts of the proposals?

    • If approved, these proposals would provide safe, protected cycling facilities for cyclists between Hackney Road and Whiston Road. Six collisions resulting in slight personal injuries were recorded in 2017 between Hackney Road and Whiston Road, three of which involved pedal cyclists.
    • They would also provide step free crossing facilities for pedestrians at side roads and at controlled pedestrian crossing points.
    • The reduced road width would help reduce the average traffic speeds (outside Haggerston School) to under 20mph.
    • The proposals would help improve accessibility for pedal cyclists and pedestrians at major junctions such as at Hackney Road.
    • Schemes of this nature are expected to contribute to improved air quality as they both regulate private motor vehicle traffic and reduce capacity. The introduction of cycle lanes also increases the distance between polluting vehicles and pedestrians and residents, reducing the effects of pollution.

    Parking

    • The proposals would affect all the parking on Queensbridge Road between Hackney Road and Whiston Road where the existing parking bays will be removed.
    • The existing car club and loading bay at Queensbridge Road will be relocated to Dunloe Street (east). A new electric charging point will also be installed on the same bay.
    • A parking stress survey confirmed that the existing parking bays on the side roads are able to absorb the impact of displaced cars from Queensbridge Road.
    • The existing residents parking bay on Horatio Street would be changed slightly to create space for passing cyclists.
    • The single yellow line between pedestrian crossings at the Hackney Road junction would be converted to double yellow lines.
    • Parking for visitors to the Columbia Road Flower Market would still be available at the ‘pay and display’ parking bays on Yorkton Street, Scawfell Street and Thurtle Road.

    Future schemes

    The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:

    • Section II: Whiston Road to Middleton Road (2020–2021)
    • Section III: Middleton Road to Dalston Lane (2021–2022)

    What happens next?

    Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk  

    To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations

    Permanent works

    If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.

    Frequently Asked Questions

    Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?

    A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.

    Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?

    A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings

    Please sign in to vote.
  • Charging for cycle parking in multi-storey car parks

    Created by Edward Leigh // 1 thread

    We know we need thousands more cycle parking spaces in future to meet ambitions to reduce car trips into the city and cope with the huge population and employment growth that the region is already committed to in its Local Plans. There is very little highway space available in the city centre, so we need to re-purpose other spaces, such as multi-storey car parks. I want to see if we can develop a policy to put to the City Council that they could act on. We've been discussing locations for new cycle parks for years (see linked Camcycle article), so what's the hold-up?

    Please sign in to vote.
  • Dog Kennel Hill Bus Lane Widening

    Anon // 1 thread

    Dog Kennel Hill Bus Lane Widening

    Closes 29 Sep 2019

    Opened 23 Aug 2019

    Contact

    Lola Olanlokun

    (Project Manager)

    Highways

    highways@southwark.gov.uk

    Overview

    We want to improve bus journey times along Dog Kennel Hill, as it has been identified that the bus lane is on a steep hill in this section and cyclists can hold up buses significantly as the lane is currently too narrow for buses to safely overtake cyclists travelling up the hill.

    In order to support this, we are proposing to widen the northbound bus lane on Dog Kennel Hill, either side of the junction with Albrighton Road. We are also considering changing the bus lane hours of operation to 24 hours a day 7 days a week. This will reduce conflict with other vehicle types and help buses keep to timetable.

    These proposals should improve journey times for passengers using the 40, 176, 185 and 484 bus routes. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.

    To do this and maintain the carriageway width for other vehicles, we plan to reduce the width of the central reservation. This will involve the transplanting of one tree, but we plan to plant an additional new tree, so the net impact would be additional tree cover.

    Please see the plan for these works here:

    If the project goes ahead, works will be undertaken in early 2020. We would try to minimise any disruption, and no full road closure should be required.

    Why We Are Consulting

    As there may be some disruption for local residents during construction, we want to make sure you have the opportunity to review the proposals and let us know if you have any concerns.

    Please sign in to vote.
  • 'Southwark Spine' (North)

    Anon // 1 thread

    Traffic order has been raised for the Southwark Spine North section we need to gather feedback for any objections and urgent suggestions. 

    Focus only on issues that are serious as its going to go in most as is.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top