Radegund Road additional parking restrictions proposed
Cambridgeshire County Council order proposing additional parking restrictions outside Coleridge college on Radegund Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by David Earl // 1 thread
Cambridgeshire County Council order proposing additional parking restrictions outside Coleridge college on Radegund Road
Created by Sarah Wood // 1 thread
Park Road is one way to motorised traffic at this point. There is a contra flow on road cycle path to allow cyclists to travel S. This path is far less that 1 metre wide and parked cars are allowed to the right of the cycle lane. The issues here are: high risk of being doored; wobbling into gutter; knocking wing mirrors; being hit by vehicles turning right into entrances because of poor sight lines between motorists and cyclists created by the barrier of parked cars. This is shown in the photo.
Created by Peter Loader // 4 threads
This issue involves working out the SPOKES response to a draft version of the forthcoming public consultation for Clarendon Road Phase 2, Watford.
If you are a member of SPOKES and do not yet have a copy of the draft document, please contact a member of the SPOKES committee.
When creating a new thread to discuss this issue, you’ll be asked whether this thread is private to the group or not. Please keep it private to the group.
Created by Simon Redding // 0 threads
Spital is an area of high cycle ownership. To cycle to town, Spital residents have to currently either traverse a dangerous junction & road bridge to join the Hasland Road cycle route, cycle on the A632 under a dangerous bridge, or cycle a long diversion around the back of the station. With this short spur from the proposed station link, Spital residents would be able to access the town cycling hub at the Spire Business Park and easily cross into town in a number of ways.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Sam // 1 thread
Herbert St is one of the closest streets to the centre of town that has free on-road parking. As a result, it's a little chaotic.
Councillors are working towards resident only parking (and seem to have been for some time).
Given that it's part of the cycle route from Midsummer common, and has small gardens, narrow pavements etc, is it worth seeing if there can be some cycle stands added or some other improvements at the same time?
There are some by the co-op on Chesterton Road, of which about half seem to be used by residents.
Created by Phillip Barnett // 2 threads
As part of the station redevelopments, the existing cycleparking is being replaced through June-August 2014 with two-tier stacks 'with the same capacity as the current arrangements'
Created by Simon Hewison // 0 threads
On this stretch of CS7, there's mandatory cycle lanes, which motor vehicles aren't allowed in, but it seems that Southwark Council forgot to include double-yellow lines, or any segregation, just blue paint with a solid white line. This leaves cyclists swerving into the road to avoid multiple badly parked vehicles (often HGVs taking their lunch, and in many cases, unmarked police vehicles at the unmarked police office)
Quick fix: Armadillos and/or double-yellow lines.
Created by Simon Redding // 0 threads
The previously offroad cycle lane has a missing 100m section that turns on to a main road, climbs up along it steeply and then has to turn right to proceed to turn. This is not safe for adults, never mind taking the kids into town.
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by David Earl // 1 thread
Changes are proposed to this junction (thread and attachment to follow)
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's new Go Outdoors shop is spaced too close together. It should comply with the Kent Vehicle Parking Standards which detail a one metre separation of stands.
Created by Al Storer // 1 thread
Cambridge City Council planning application 14/0713/FUL. Nursery to be demolished and replaced by housing
Created by Matthew Phillips // 1 thread
See planning application at: http://publicaccess.durham.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=N3SZPOGDGB000
Good points: plans include secure covered cycle places at a ratio of 1:2 which is exactly what we have recently been asking for.
Bad points: Council officers have suggested this is too many and 1:5 would be appropriate. This is despite the fact this accommodation is relatively far off from most University sites.
Issues:
1) cycle access over footbridge
2) ensuring development is connected to all local footpaths
3) bike contraflow needed on Station Lane
4) navigating Gilesgate roundabout
Created by Heather Coleman // 1 thread
I'm getting reports of a very serious accident at the crossing of the Addenbrooke's Trumpington cycleway and the Guided busway from the city centre to the Park and Ride, and the Addenbrooke's spur.
As you approach the end of this particular stretch of NCN 72 past the Egger factory, you suddenly emerge onto a very busy road. This is one of the major arterial routes in and out of Hexam as it leads to and from the A69 bypass, one of the major transpennine links. It is not suitable for adults to ride on never mind young children.( I have a son aged 10)
The route leads across the main road bridge into Hexham, swings around a small roundabout by the Tyne Green park, and then brings you directly onto another roundabout by Tesco and the Wentworth Leisure Centre. It is as though cyclists have been designed out of the picture on this one. Its a shame as my son would use this route to school if it were safe.
Created by Al Storer // 1 thread
A local campaign group has been formed to push for improvements to this busy roundabout
Created by Gregory // 0 threads
Not an issue but good news I thought worth sharing here. I regularly use the Gala/Walkergate cycle racks outside Clayport Library. Today I was confused, they had been replaced with a slightly different style and moved closer to the wall. The concrete looked wet/new but they are firmly in place, perhaps that's why they were empty but a bicycle was locked to a nearby lamp post.
An old gentleman walked by and commented it was a better place for them. I thought he referred to being out of the way, but he said the seat won't get wet (if I had parked my bike facing the other way!).
I have updated the cycle capacity on OpenStreetMap, there are almost double the number of racks as before!!! I don't know what happened to the old style racks, hopefully they are being installed somewhere new. I might ask.
http://www.openstreetmap.org/node/744912599
Created by Hester Wells // 1 thread
Consultation on road markings and traffic signs at https://www.gov.uk/government/consultations/traffic-signs-regulations-and-general-directions-2015
There are a number of things which I believe affect cyclists, see http://www.bikebiz.com/news/read/dft-to-allow-better-signage-for-cyclists-including-removing-asl-lanes/016336
This is really a national issue, but didn't want to spam all users.
Created by Hester Wells // 1 thread
s106 money has been set aside from the West Cambridge development for a route into Central Cambridge.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Heather Coleman // 1 thread
I've just spotted a County Council public notice on the post at the point noted, but applying to various areas as far as I can tell. Was in a bit of a hurry - stupidly didn't think of taking a photo of it. But the Council appear to be suggesting putting bus lane enforcement cameras in! I think this has to be good news, and ought to help cyclists - what do other people think?
Created by James Gilbert // 1 thread
New barriers will be used to prevent cars driving into the ford when the river is too high. Almost all of the time when the ford is in flood it is still passable by cyclists and pedestrians on the footbridge. On the Duxford side (pictured), cyclists will have to squeeze past on the verge next to a ditch to get round. This will be hard for cyclists with trailers, children in seats etc...
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.