Convert footpath across The Wick to dual use.
Convert footpath across The Wick to dual use.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Angela Dyer // 0 threads
Convert footpath across The Wick to dual use.
Created by Angela Dyer // 0 threads
Yellow lines to discourage parking on Ridgeway on-road cycle lane
Created by Angela Dyer // 0 threads
Cycleway/footway alongside A4147 St Albans to Hemel Hempstead
Created by Angela Dyer // 0 threads
Reduce vegetation to improve visibility on Alban Way between Camp Rd and London Rd. This is particularly an issue where footpath from Vanda Way crosses Alban Way
Provide a link from the Alban Way to hatfield road via the Hatfield road cemetry.
STACC member request May 2011
Created by mike1727 // 0 threads
Contraflow cycle lane on Marlborough Road from Victoria Street to London Road.
STACC member request May 2011.
Provides a connection to Sustrans route 6 and London Road cycle route at the Beehive juntion avoiding Lattimore Road and the Lattimore Road/London road junction.
Created by mike1727 // 0 threads
Provide a ramp alongside the steps to access the York Road railway bridge.
STACC member request from May 2011.
Enables a low traffic E/W link paralleling Hatfield road linking Fleetville to the north of the city centre.
Created by mike1727 // 0 threads
STACC member survey in May 2011 asked that this junction should be changed to allow cycles to use the "buses only" turning into St Michaels coming down Bluehouse Hill.
It provides a useful link from Bluehouse Hill into the Verulalium cycle routes.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Simon Nuttall // 3 threads
The annual university societies' fair is an opportunity to suggest to the student body the existence of the campaign.
Historically we get few students joining, but it can be a useful networking opportunity.
Created by Paul L // 1 thread
Raising and re-surfacing path that we have been complaing about since forever. Pity it isn't wider, doesn't go all the way to Mortlake Brewery and the White Hart has obstructive seating but still worth celebrating.
Martin Lucas-Smith // 0 threads
The Virgin Gym trade entrance is being used by drivers as a shortcut.
Created by Jim Chisholm // 5 threads
Issues regarding sharing of space on commons in central Cambridge
Created by Jon Warbrick // 1 thread
The link from Barton Road to the Lammas Land car park (and the car park itself) have been closed to all use by the County Council for some development work. This is a buisy cycle route, and no effort has been put into providing a diversion. Currently most people are cycling across the grass behind the hedge beside the road (though how long this will remain possible if it rains is unclear); an alternative is to use other paths across Lammas Land, but they are narrow, not actually marked for cycling, and it's further.
According to a notice at the junction with Barton Road this work will continue to the start of December. There was and is no warning when approaching from east of the river.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Richard G // 1 thread
At a recent BUG-WAG* meeting, the Trust reported that the council will be modifying the Long Road/Adrian way junction.
Those of you that know the area will know that the exit from Addenbrooke's is 'no right turn' with a small shaped island to direct traffic westbound onto Long Rd
plans were shown to create a cutout in the small island for bikes to exit eastbound. Presuamably with signs to indicate this too
The trust said that suggestions to the junction would be welcome in the planning of further changes to Long Rd
Richard
*BUG-WAG - the Bicycle User Group, Walking Action Group of interested parties on the Addenbrooke's campus
Created by mike1727 // 0 threads
Reported in the Herts Advertiser w/s 30/09/13 http://www.hertsad.co.uk/news/secret_plan_for_new_school_on_harpenden_green_belt_1_2818938
"On Monday, the Herts county council’s (HCC) cabinet agreed to press ahead with the compulsory acquisition of up to 15 hectares of farm land on the corner of Common Lane, off Lower Luton Road."
"The acquisition would provide a development site for a new school with a capacity of six to eight forms of entry." <...>
"Cllr Chris Hayward, cabinet member for education, said if a decision is made to build on the site, it would go through a full planning application."
The site is on a busy road but close to route 57. Planning should include at least a good link to route 57 as well as more local routes to the north- and possibly off road route next to Lower Luton road.
Created by alpaca // 0 threads
TFL have a consultation open until 18th October 2013.
https://consultations.tfl.gov.uk/streets/tottenham-hale-20mph
Blog posts:
http://cyclelondoncity.blogspot.co.uk/2013/10/something-has-got-to-change-cycling-is.html
http://rachelaldred.org/writing/where-is-the-space-for-cycling-on-broad-lane/
Created by Jose Ferraro // 0 threads
Coombe Lane West heading towards Raynes Park: There is a long downhill slope which has new potholes appearing frequently which after a long while are filled with blobs of tarmac creating equally dangerous lumps. Grit fallen from HGVs and parked cars narrowing the lane make this a very risky road to cycle along at speed. A cyclist needs to slow down to be prepared to manoeuvre these hazards which puts them into conflict with motorised traffic behind them who wish to pass but lack the room. This is especially true when cycling uphill over the flyover (in either direction).
There is a short piece of cycle lane only at the base of the hill which does not continue over the flyover and leaves slower cyclists to mix in with the much faster flow of motorised traffic.
The result is frequent close passes unless you cycle in a primary position which invites further conflict (tailgating and intimidation) from impatient motorists.
Created by Heather Coleman // 1 thread
Dropped bike off for service at Grand Arcade and walked to get Uni4 bus from outside Pembroke at around 8.30am today. At least four separate lorries stopped on double yellow lines between Little St Mary's Lane and Fitzwilliam Museum, causing traffic chaos. This is really dangerous for cyclists since even if a cyclist has had the courage to get past the obstruction, or has right of way, drivers just don't seem to see them or think they really are only about six inches wide. This also causes massive traffic hold-ups. Congestion (where there is no mandatory or advisory cycle lane) is generally dangerous for cyclists as it tends to lead to "white lining" or squeezing through gaps. This is a busy cycle route. I'm sure Peterhouse have a back entrance for lorries for example.
Why is loading allowed on double yellow lanes on busy cycle and bus routes during the rush hours? OK, I know there's an alleged loading ban on Hills Road which is rarely, or if ever enforced, but at least there is a ban there. I've highlighted that bit of Trumpington St as road users were having to do a slalom there this morning, but this is a Cambridge-wide problem and I'm sure members can also provide evidence of other examples.
I can't quite believe that certain businesses being allowed to hold up the traffic willy-nilly is good for the Cambridge-wide economy in general.
Do we have a position on this? Should the new Police and Crime Commissioner have a position on this? Should Stagecoach (who probably find it causes them a problem, even though they're not our favourite people) have a position on this? Is there a Chamber of Commerce? What do they think about employees who are late for work or deliveries they are expecting being delayed by these sort of hold-ups?
I have lots of photos which will tell me how long I was standing at the bus stop observing these lorries, which I will unload when I have the means.
There is a short section of the Alban Way where it is significantly narrowed as a result of encroachment from the morissons supermarket dite, leaving a width of no more than 1.5m. To the side the land falls away down to the caravan park road. It could be eaily widened with gabbions on the caravan park road side subject to land ownership and approval.
Created by mike1727 // 1 thread
At the back of Morrisons there is a large tree which obstructs the Alban Way, narrowing an already narrow stretch down to approx 750mm at the tree and causing obstructions.
This tree needs removing asap.
Created by mike1727 // 0 threads
The Stonecross/Avenue road junction is to be redesigned. It is rounoured there may be a ban on bikes turning right from Stonecross onto Avenue road, which makes bike journeys W-E using Avenue road difficult. It would be better to redesign the junction to allow bikes through since many people will continue to ride/use the pavement as this is a desire line route.
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream