Radegund Road additional parking restrictions proposed
Cambridgeshire County Council order proposing additional parking restrictions outside Coleridge college on Radegund Road
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by David Earl // 1 thread
Cambridgeshire County Council order proposing additional parking restrictions outside Coleridge college on Radegund Road
Created by Sarah Wood // 1 thread
Park Road is one way to motorised traffic at this point. There is a contra flow on road cycle path to allow cyclists to travel S. This path is far less that 1 metre wide and parked cars are allowed to the right of the cycle lane. The issues here are: high risk of being doored; wobbling into gutter; knocking wing mirrors; being hit by vehicles turning right into entrances because of poor sight lines between motorists and cyclists created by the barrier of parked cars. This is shown in the photo.
Created by Peter Loader // 4 threads
This issue involves working out the SPOKES response to a draft version of the forthcoming public consultation for Clarendon Road Phase 2, Watford.
If you are a member of SPOKES and do not yet have a copy of the draft document, please contact a member of the SPOKES committee.
When creating a new thread to discuss this issue, you’ll be asked whether this thread is private to the group or not. Please keep it private to the group.
Created by Simon Redding // 0 threads
Spital is an area of high cycle ownership. To cycle to town, Spital residents have to currently either traverse a dangerous junction & road bridge to join the Hasland Road cycle route, cycle on the A632 under a dangerous bridge, or cycle a long diversion around the back of the station. With this short spur from the proposed station link, Spital residents would be able to access the town cycling hub at the Spire Business Park and easily cross into town in a number of ways.
Created by Jon_B // 1 thread
The cycle link from Bramley Hill to Haslemere Drive has opened up a route via Lacey Street, Haslemere Drive and Bramley Hill as a much quieter parallel route to Woodbridge Road for cycles.
However, to proceed to North East Ipswich from here means cycling (or indeed walking or driving) via Woodbridge Road at the point where it crosses the railway line. There are no other crossings for a considerable distance to the North or South.
The land fronting Woodbridge Road to the North is currently for sale for residential development.
If this land is developed I believe that this should include an additional cycle and pedestrian bridge over the railway to Belvedere Road to open up access to the residential areas NE of this (as well as Sidegate Lane Primary School) without having to use Woodbridge Road.
Sam // 1 thread
Herbert St is one of the closest streets to the centre of town that has free on-road parking. As a result, it's a little chaotic.
Councillors are working towards resident only parking (and seem to have been for some time).
Given that it's part of the cycle route from Midsummer common, and has small gardens, narrow pavements etc, is it worth seeing if there can be some cycle stands added or some other improvements at the same time?
There are some by the co-op on Chesterton Road, of which about half seem to be used by residents.
Created by Phillip Barnett // 2 threads
As part of the station redevelopments, the existing cycleparking is being replaced through June-August 2014 with two-tier stacks 'with the same capacity as the current arrangements'
Created by Simon Hewison // 0 threads
On this stretch of CS7, there's mandatory cycle lanes, which motor vehicles aren't allowed in, but it seems that Southwark Council forgot to include double-yellow lines, or any segregation, just blue paint with a solid white line. This leaves cyclists swerving into the road to avoid multiple badly parked vehicles (often HGVs taking their lunch, and in many cases, unmarked police vehicles at the unmarked police office)
Quick fix: Armadillos and/or double-yellow lines.
Created by Simon Redding // 0 threads
The previously offroad cycle lane has a missing 100m section that turns on to a main road, climbs up along it steeply and then has to turn right to proceed to turn. This is not safe for adults, never mind taking the kids into town.
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by David Earl // 1 thread
Changes are proposed to this junction (thread and attachment to follow)
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's new Go Outdoors shop is spaced too close together. It should comply with the Kent Vehicle Parking Standards which detail a one metre separation of stands.
Created by Al Storer // 1 thread
Cambridge City Council planning application 14/0713/FUL. Nursery to be demolished and replaced by housing
Created by Matthew Phillips // 1 thread
See planning application at: http://publicaccess.durham.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=N3SZPOGDGB000
Good points: plans include secure covered cycle places at a ratio of 1:2 which is exactly what we have recently been asking for.
Bad points: Council officers have suggested this is too many and 1:5 would be appropriate. This is despite the fact this accommodation is relatively far off from most University sites.
Issues:
1) cycle access over footbridge
2) ensuring development is connected to all local footpaths
3) bike contraflow needed on Station Lane
4) navigating Gilesgate roundabout
Created by Heather Coleman // 1 thread
I'm getting reports of a very serious accident at the crossing of the Addenbrooke's Trumpington cycleway and the Guided busway from the city centre to the Park and Ride, and the Addenbrooke's spur.
As you approach the end of this particular stretch of NCN 72 past the Egger factory, you suddenly emerge onto a very busy road. This is one of the major arterial routes in and out of Hexam as it leads to and from the A69 bypass, one of the major transpennine links. It is not suitable for adults to ride on never mind young children.( I have a son aged 10)
The route leads across the main road bridge into Hexham, swings around a small roundabout by the Tyne Green park, and then brings you directly onto another roundabout by Tesco and the Wentworth Leisure Centre. It is as though cyclists have been designed out of the picture on this one. Its a shame as my son would use this route to school if it were safe.
Created by Al Storer // 1 thread
A local campaign group has been formed to push for improvements to this busy roundabout
Created by Gregory // 0 threads
Not an issue but good news I thought worth sharing here. I regularly use the Gala/Walkergate cycle racks outside Clayport Library. Today I was confused, they had been replaced with a slightly different style and moved closer to the wall. The concrete looked wet/new but they are firmly in place, perhaps that's why they were empty but a bicycle was locked to a nearby lamp post.
An old gentleman walked by and commented it was a better place for them. I thought he referred to being out of the way, but he said the seat won't get wet (if I had parked my bike facing the other way!).
I have updated the cycle capacity on OpenStreetMap, there are almost double the number of racks as before!!! I don't know what happened to the old style racks, hopefully they are being installed somewhere new. I might ask.
http://www.openstreetmap.org/node/744912599
Created by Hester Wells // 1 thread
Consultation on road markings and traffic signs at https://www.gov.uk/government/consultations/traffic-signs-regulations-and-general-directions-2015
There are a number of things which I believe affect cyclists, see http://www.bikebiz.com/news/read/dft-to-allow-better-signage-for-cyclists-including-removing-asl-lanes/016336
This is really a national issue, but didn't want to spam all users.
Created by Hester Wells // 1 thread
s106 money has been set aside from the West Cambridge development for a route into Central Cambridge.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by Heather Coleman // 1 thread
I've just spotted a County Council public notice on the post at the point noted, but applying to various areas as far as I can tell. Was in a bit of a hurry - stupidly didn't think of taking a photo of it. But the Council appear to be suggesting putting bus lane enforcement cameras in! I think this has to be good news, and ought to help cyclists - what do other people think?
Created by James Gilbert // 1 thread
New barriers will be used to prevent cars driving into the ford when the river is too high. Almost all of the time when the ford is in flood it is still passable by cyclists and pedestrians on the footbridge. On the Duxford side (pictured), cyclists will have to squeeze past on the verge next to a ditch to get round. This will be hard for cyclists with trailers, children in seats etc...
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream