Roadworks: Calthorpe Street
Emergency gas works on Calthorpe Street from 1st January until 7th January.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by John Chamberlain // 1 thread
Emergency gas works on Calthorpe Street from 1st January until 7th January.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Demolition of single storey dwelling and erection of part 2/ part 3 storey building containing 2 no. 1 bed flats and 3 no. 2 bed flats
138 Brooks Road Cambridge CB1 3HR
Cambridge
Application reference : 19/1505/FUL
Demolition of 32no existing flats and garages, and erection of 75no new affordable dwellings, including 4no houses and 71no apartments, a new community facility, car parking, landscaping and associated works.
67 - 97A Campkin Road Cambridge Cambridgeshire CB4 2NP
Cambridge
Application reference : 19/1616/FUL
sound+fury // 1 thread
Proposed football stadium move.
Created by Hounslow Cycling Campaign // 1 thread
London Borough of Hounslow is consulting on the provision of secure cycle parking in residential streets around the borough.
The council has recently installed an on-street bikehangar in Chiswick at Ashbourne Grove and has received further requests from several residents nearby. Bikehangars offer secure cycle parking for residents in areas where the ability to safely store bikes within a property, or the front/rear garden, is limited. This is part of the council’s commitment to encourage more sustainable forms of transport for daily journeys. The council covers the installation cost of new bikehangars via an annual grant allocation from Transport for London to increase cycle parking provision in the borough, there is a rental fee per year of £72 per space, plus a deposit for a key (£25). The allocation of spaces is managed by the council’s contractor, Cyclehoop, who also look after ongoing maintenance.
Each new installation is the subject of a separate consultation. This is presumably because of the sensitivity of residents to any reduction in the number of parking spaces for cars.
Created by David Green // 1 thread
I will be running four Wheel Building Workshops in Cambridge during 2020 (dates on website). It makes a great Christmas present for anyone who is a keen cyclist, or interested in cycle maintenance and repair.
Potential redesign of junction looks very poor - The usual set of issues with cars cutting across bikes, no real segregation, lanes starting/stopping etc. etc. etc.
Created by Harry Fletcher-Wood // 1 thread
Proposal includes:
Created by M Stanley // 1 thread
Really exciting proposals for Meadow Lane leading over Leeds Bridge and to the Corn Exchange.
Currently meadow lane is an inner city dual carriageway. It is proposed that it will become a single carriageway in each direction for motor vehicles and the space repurposed into pedestrian and cycle facilities. Consultation is now closed but it still needs to go to detailed design stage. Full details can be seen at the attached web link.
Changes are proposed on a 1km section of the A660 due to delays to buses caused by congestion. An outbound bus lane is proposed between Victoria Road to just past Bainbridge Road. Cycleway is retained on inbound section, but outbound section would be shared with buses. 20 buses per hour would use the bus lane at peak times. Difficult one for the campaign this? Is a 24hr 3.5m bus lane preferable to a 1m advisory cycle lane? Majority of bus lane is downhill.
Particular discussion points were ensuring that the cycle lane continues over side roads, even though the bus lane stops, and querying a two stage pedestrian crossing (should be one stage). Plans still at early stage so will likely return to the forum.
Anon // 1 thread
Overview
We would like your views on highways improvements on Wood Vale.
Residents have told us that they would like to see reduced speeds and less through traffic on Wood Vale so we have put together a proposal to tackle these issues that we would now like your feedback on. We would especially like to know if you think the designs could be improved or if we have missed any opportunities.
The measures will include:
As part of these works we will also be taking the opportunity to refurbish the footway along the road where it is needed.
Separately from this consultation, please note that Melford Road carriageway resurfacing has been reprogrammed for the 16th of January. Separate notification will be issued for this work closer to the scheduled implementation date.
Let us know what you think by filling in the online survey. Drawings can be viewed in the additional documents section.
Why We Are Consulting
We are consulting to find out what you think of the proposals and if you have any suggestions.
Give Us Your ViewsOnline Survey
Created by Matthew // 1 thread
The permissive route between Shire Hall and Magrath Avenue has issues (not the least of which being there are steps) however it does cut through the middle of what is otherwise an overly large block between Victoria Road and Chesterton Lane. There is also some irony in the fact that it appears to be the last remnants of a way that was once a Roman Road from Castle Hill heading due north.
Naturally, it is under threat from the sale of Shire Hall. We received the following e-mail:
Can you help ? As you may be aware the County Council has leased the
Shire hall and some of the surrounding buildings to a development
company. At present the situation regarding public access to the
permissive path that runs between the top of McGrath Avenue and Castle
Hill remains unclear. There is to be a public meeting sometime in
December or early January where Suffolk County Council as arbitrator
will take submissions.
Some neighbours and I are collecting data on the numbers of pedestrians
and cyclists that use the cut through during rush hours - at present the
number of journeys made per hour range from 116 (49 cyclists) to 149 (69
cyclists)which is just over 2 journeys per minute.
Thus as you can see closing this path would be a tremendous loss to the
local community forcing many people into taking busier routes along
Victoria Road and other major routes increasing the risk of accidents.
We would be very grateful for your support. There is to be a link on
the County Council website for submissions but alternatively you can
send statements to Jocelynne Scutt , copying in Claire Richards ( both
County Councillors). These statements will then be forwarded to Suffolk
County Council in batches rather than receiving them
individually.Please see above for Jocelynne's and Claire's email
addresses.
Section 73 to remove Condition 5 of C/02/0136/RM (Demolition of existing buildings and erection of non food retail units and garden centre, Drive thru retaurant with associated servicing, Car Parking, Landscaping, new access and relocation of existing amenity car park (reserved matters - to original application C/99/1121/OP)) - removal of bollard.
Cambridge Retail Park Newmarket Road Cambridge Cambridgeshire
Cambridge
Application reference : 19/1500/S73
Created by Matthew // 1 thread
Cambridgeshire County Council proposes to make an Order under the Road Traffic Regulation Act 1984, as amended, after consultation with the Chief Officer of Police the effect of which will be to :-
Amend the no loading and unloading restrictions on Mill Road, Cambridge from Monday to Saturday 8.15 – 9.15am and 5pm – 6pm to Monday to Saturday 7.30 - 9.30am and 4.30 - 6.30pm in the follow locations;
I have attached a copy of the public notice and plan, showing the location and extent of the proposed restrictions.
A copy of the draft Order and plans can also be seen online from Wednesday 20th November 2019 at http://bit.ly/cambridgeshiretro
If you wish to make any comments on these proposals we would appreciate them in writing to the address below or by email to policyandregulation@cambridgeshire.gov.uk no later than the 11th December 2019 quoting reference PR0594.
Created by John Chamberlain // 1 thread
From 20th November until 18th December contractors Sf Stefan will be laying broadband fibre on Royal College Street. This will affect the northbound with-flow cycle lane. As far as possible, a segregated cycle lane will be maintained by closing parking bays and using barriers to make a cycle lane in the main carriageway but there may be a few locations where cyclists temporarily have to use the main carrigeway.
Technical details consent for construction of 9 dwellings and means of access, following demolition of redundant Health Authority offices (pursuant to grant of 19/0769/PIP for Permission in Principle for residential development of 9 dwellings).
Cambridge And Huntingdon Health Authority 18 Vinery Road Cambridge Cambridgeshire CB1 3DX
Cambridge
Application reference : 19/1389/TDAMIN
There's a whole bunch of locations reported for this Cambridge Cow sculpture exhibit.
I've already spotted one that gets too close to a dropped kerb in Station Square. More eyes needed to look through all the proposed locations.
Created by John Chamberlain // 1 thread
From Monday 25th November to Monday 2nd December Gower Street will be closed from Grafton Way to between Torrington Place and Chenies Street for resurfacing. There will be no access for motor vehicles nor cyclists and both University Street and Torrington Place will be closed with diversions in operation. This will obvously have a major impact on the E-W cycle route on Tavistock Place/Torrington Place. Details of diversion routes are shown in the attached thread.
Then from December 2nd until Monday 9th the works move south and Gower Street will be closed from north of Chenies Street to mid-way down Bedford Square. The E-W cycle route on Tavistock Place/Torrington Place will re-open. This should have less impact but there will still be local diversions.
Created by John Chamberlain // 1 thread
From 25th November to 23rd December one lane of Eversholt Street will be closed between Phoenix Road and Drummond Crescent for work on a 16" water main. Traffic will be two-way but controlled by signals and therefore is likely to be even more congested than usual. In addition, Phoenix Road will be closed so cyclists will need to use Polygon Road to access Somers Town and Ossulston Street.
Update 27/11/19 - now deferred till 2020
Created by Neil Robertson // 1 thread
To reduce through traffic in the Hills and Vales area of West Greenwich.
Two options are offered:-
1. 4 Modal filters and a one way road.
2. 2 modal filters 2 one ways and a timed restriction with camera control on Hyde vale.
Even very narrow lanes in this area are used by rat running vehicles, often at unsuitable speeds, so removal of through traffic will improve the area.
Created by Peter Loader // 1 thread
The Colne and Crane Green Infrastructure Strategy includes a proposed new walking and cycling link between Rickmansworth Station and the Colne Valley Trail at Rickmansworth Aquadrome. At its meeting on November 4th 2019, Batchworth Community Council set up a project to ensure that this new route was implemented via Rickmansworth Town Centre, in line with two of Rickmansworth Parish Councillors' strategies.
This would involve designing the preferred route via Bury Lane, Rickmansworth and then part-funding Hertfordshire County Council to create it.
This shows the course of the preferred route, which is open to a phased implementation as funds permit.
Created by Chris Howell // 1 thread
This is a suggestion to create a Dutch style cycle map for the area around Cambridge and get the waypoints and routes marked on the ground to help navigation by bike, and then use it to measure progress on creating better routes.
Created by JonC // 1 thread
Plans to improve Rushgrove Park include a new crossing of the Silkstream near Colindeep Lane, with a new access point on Colindeep Lane, joining with the existing route following the western side of the park to emerge on Crossway. The draft masterplan describes this as the "primary shared cycle and footpath with seasonal tree avenue".
Consultation details and online questionnaire on the link below...
Created by JonC // 1 thread
Plans to improve Colindale Park include a 3.2m wide shared-use pedestrian/cyclist path linking Colindale Station and Sheaveshill Avenue.
It is described in the draft masterplan as a commuting route - it's actually the 250m long path at the NE edge of the park.
Consultation details and online questionnaire on the link below...
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Andrew Woodward // 1 thread
The path linking Bank Lane to Palewell Fields is currently pedestrian only, with gates across it. Opening this up to cyclists would improve permeability and provide a quiet route to Richmond Park Academy school from Roehampton (east-west); and to Ibstock Place school from Sheen (west-east).
Created by JonathanF // 1 thread
Place-holder for Corridor Cycleway Section 7 discussions
Created by Shaun McDonald // 1 thread
Many cyclists won't cycle to Harwich International from the Ipswich direction due to the roads. There really should be a high quality cycle route for this to continue the cycle journey from The Netherlands, where you can ride of the ferry and on to quality cycle infrastructure. The fact people choose the train is not a good sign.
This issue is the overall goal, and needs to be broken down into smaller sub issues of smaller more specific projects or improvements that can work towards this goal.
Created by David Butler // 1 thread
Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).
Vehicles are continually abusing cyclists who use the road here because the bus lane on the other side forces the carriageway to be narrow.
Although there is the cycleway, it has the usual problems of loss of priority at sideroads, bins in the way, people going in and out of driveways, etc.
Created by Paul James // 0 threads
West side the cycleway terminates at the Manor Rd zebra crossing.
East side it vanishes 20 meters from the junction at the Lower Richmond Rd zebra crossing.
Path between is not shared use and is very narrow due to excessive road width on roundabout due to dedicated turning lane and large roundabout center.
Created by Paul James // 1 thread
The cycleways along the Thames Path and along Ducks Walk are not connected with the south/east side cycleway across Twickenham Bridge and only to the north/west side cycleway via a long detour through Old Deer Park or along The Avenue.
A ramped way down from the bridge would create a useful route for people into and out of Richmond town center that is currently only possible by using two flights of steps.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by jpennycook // 1 thread
"Basingstoke and Deane Borough Council has commissioned Sustrans, a leading UK charity that aims to encourage people to travel by foot, bicycle or public transport for more of their local journeys to help create a ‘cycling strategy’ and new cycle network map in consultation with the people who live in, work in or visit the borough."
The strategy ignores most of the Borough, has low aims (lowest common denominator rather than facilities suitable for all riders), and is being made irrelevant by new housing developments.
Responses to the consultation should be in by 11th December.
Here is a map showing the Borough Council's boundaries: https://www.openstreetmap.org/relation/127249
By zooming in to this map, you can see the proposed corridors as dashed blue highlights: http://opencyclemap.org/?zoom=12&lat=51.2725&lon=-1.15&layers=B0000
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.
Created by Andy Allan // 1 thread
When heading west along Leigham Court Road towards Streatham Hill Station, there is a sign saying no right turn into Mount Nod Road. However, there is a "cycle plug" there, so the no right turn sign should have an "except for cyclists" underneath.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Martin Lucas-Smith // 11 threads
Major planning application here - c. 10,000 homes
Added to reduce confict with pedestrians at back of Leith Academy.
Will act as a barrier to long bikes, trailers and probably buggies and wheelchairs.
http://www.flickr.com/photos/chdot/8116937797/sizes/l/in/photostream