Except Cycles: Narrow Hill, Witney
Make Narrow Hill two way for cycling by adding 'Except Cycles' signs to No Entry signs at junction with West End.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by khickman // 1 thread
Make Narrow Hill two way for cycling by adding 'Except Cycles' signs to No Entry signs at junction with West End.
Created by velocipedus@gmail.com // 12 threads
Project Orange is an attempt develop our general strategy during the year 2013.
It involves
1) Should Cambridge Go Dutch (or Copenhagenize)
2) A more assertive stance in our interactions with agencies: Demanding of them to make feasible what seems infeasible
3) focus on a regional area 10 miles (15 km) around Cambridge and a dartboard network structure to connect villages,
4) the development of a Bicycle Infrastructure Assessment Tool (BIAC) which will allow us to grade and praise provision
5) Priority over sideroads as part of a Dutch-style approach
5) Development of Visualisation Tools for major projects (Chisholm Trail, Newnham to Newmarket Rd, Mitcham's Corner)
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by velocipedus@gmail.com // 2 threads
This issue contains threads about the economics of cycling, the contribution of cycling to the economy, ways to express cycling in pounds and pence, savings achieved per mile, bike trade, etc
Created by George Coulouris // 1 thread
Camden have been persuaded to install two Dutch-style on-street cycle 'Fietshangars'. See the photo for appearance. They are made of metal mesh and have space for 5 cycles.
Locations are 108 College Place NW1 and 1 South Hill Park NW3
Contact at Camden Council is Brian.Deegan@camden.gov.uk
Created by WillC // 0 threads
Leeds-bound cycle lane adjacent to Coopers Pub is regularly blocked by cars using the pizza shop next door. The cycle-lane itself is only useful if you are wishing to turn left into The Green. If you wish to go straight ahead then you have to use the main carriageway. This is , not wide enough for cars to pass so you have to take the primary position for safety. This causes irritation for drivers who do not understand the the cycle lane provided is not for cyclists travelling straight on. Junction needs rethinking, and illegal parking addressed.
Created by WillC // 0 threads
Leeds-bound cycle lane stops at junction and continuing in a straight line would mean hitting pavement, so cyclist need to pull out into traffic that up until then has been safely passing them. At the same time as cyclists are pulling into the main carriageway - in the center of the junction - vehicles are pulling into the left side as the carriageway narrows on the other side of the junction. It is a regular source of near-misses and very intimidating.
The junction needs realigning/redesigning.
Created by WillC // 0 threads
Water and other dirty waste collects in the cycle lane (Leeds-bound). It seems to be coming from the access road to the Cricket Club in Nunroyd Park (you can follow the flow to this side road). In winter this forms a regular icy dangerspot. Existing drains are either blocked or insufficient.
Created by Gregory Williams // 0 threads
Wheelbender cycle parking is installed at the front of Family Bargains. This could lead to damage to bicycles and does not offer a secure means of locking bicycles (because both wheels and the frame cannot be easily fastened without a long cable lock).
Created by Gregory Williams // 1 thread
The cycle path that's part of NCR18 immediately south of Mace Lane is cracking and could trap bicycle wheels, potentially causing injuries.
Created by Gregory Williams // 1 thread
The drain cover in Newtown Road at the point that the cycle path to the station crosses it is orientated such that the slots in it could trap a bicycle wheel.
The drain cover should be replaced with a "waffle" style cover.
Created by Gregory Williams // 0 threads
Cycle parking is needed to serve the parade of shops on Zealand Road. This will encourage people to cycle to the shops and provide a secure means for locking bicycles.
Created by Shaun McDonald // 1 thread
When you are exiting the station forecourt from Ipswich station, it doesn't detect cyclists, thus never turns green for cyclists if there are no cars trying to exit at the same time.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by Shaun McDonald // 0 threads
On passing on Saturday I noticed that Lewisham have moved the block point of Verner Road to the junction, however this seems to have added and obstruction for cyclists. It could be that once the work is complete it will no longer be an issue as from the other side there is a dropped kerb.
Note in the photo the signage of the cycle route on the lamppost on the left.
Created by Jim Chisholm // 1 thread
A set of TROs at various locations have just been announce for consaltation
Created by Klaas Brümann // 1 thread
Consultation on implementing no waiting areas on Woodhead Drive.
Created by Shaun McDonald // 1 thread
Bricklayers Arms Roundabout – Subway Closure
Overview
Transport for London (TfL) is proposing to make changes to the roundabout to improve personal safety for people crossing the junction.
In June 2012 a pedestrian survey of the footway and subway system was carried out. The survey showed that between 50-70 crossing movements are made through each of the subway bores between 7am-7pm, with the majority of people preferring to use the crossings at ground level. A key factor in this is the design of the central island and subway network, which attracts crime and anti-social behaviour
The main scope of the work being proposed is to block up the subways and improve the crossings at street level. Further detail is outlined below and on the attached plan:
Decommissioning and infilling of the subway bores, ramps and stairs;
Re-paving of the perimeter footways.
Providing a new street level crossing facility to increase accessibility to the northeast corner (Tower Bridge Road) of the roundabout.
Removal of the concrete wall which surrounds the roundabout.
Improved street lighting.
Retention of mature trees and new tree planting.
The subway closure works are programmed to commence from mid-February.
If you have any questions or comments about these proposals please contact us by 8 February 2013.
https://consultations.tfl.gov.uk/streets/bricklayersarms/consult_view
Martin Lucas-Smith // 1 thread
A cyclist was convicted in this location whose pavement provision is poor, inconsistent and badly maintained.
Background at:
http://www.rtaylor.co.uk/anti-social-cycling-north-cambridge.html#comment-75411
Created by David Wilcox // 0 threads
The Foresters Arms in Westbury on Trym in Bristol is being converted to a Tesco Express.
The Council want to change the waiting restrictions by a whole one metre!
http://www.bristol.gov.uk/page/transport-and-streets/traffic-regulation-orders-tros#jump-link-3
"It is proposed that the current prohibition of waiting at any time (indicated by double yellow lines) on the south west side of Westbury Hill, which currently terminates in line with the common boundary line of numbers 73 and 75 Westbury Hill, should be extended by one metre in a south easterly direction. Delivery vehicles are permitted to wait on yellow lines while goods are being loaded or unloaded and the proposal is intended to provide vehicles being used to make deliveries to the new supermarket with sufficient space to pull in close to the kerb, to minimise interference with the movement of other traffic."
Since this will have a minimal effect on the ease of delivery to the Tesco's - remember most Articulated Lorries are 13- 16 Metres in length
http://www.intelligentanswers.co.uk/index.php?topic=2851.0
Why bother changing anything?
Looking at the google street view pic attached, parking an Artic on this road will cause major disruption and be a safety issue for the pedestrian crossing on the mini roundabout.
I wonder what the cost of raising a TRO for one metre change in parking restrictions is?
Created by WillC // 0 threads
A65 in Rawdon is wide with few side roads. It needs cycle lanes. Southbound in morning staggered queuing traffic makes if hard to wiggle down to the ring road roundabout. There is ample width and no reason not to add cycle lanes. Ther are however 3 pinch points associated with middle pestrian refuges that are dangerous. There are cut-outs into pavement area to apparenlty widen the road here but the cut-outs are very poorly surfaced and unusable. Vehicles passing cyclists at the pinch-points regularly cause danger (personally experienced several times a week, one very nearly fatally).
Created by David Wilcox // 1 thread
The junction of Wade Street and Lamb Street used to have a dedicated segregated cycle lane to enable cyclists to turn right (against the traffic on the one way Lamb Street) via a pedestrian Pelican crossing to get to the Park opposite. This park has connections to the Bristol 2 Bath Railway Path and Temple Meads.
Speaking to the Council Officer at the cycle forum on 17/01/2013, It seems that this road layout is changing. Cyclists will be able to join the widened pavement much earlier on Wade Street to cross at the Pelican Crossing. This will cut down on collisions with cyclists having to cross the traffic at the junction.
The work was not subject to a normal Council Consultation as much of the work is being done by Wessex Water who are laying some pipes in the area. Changing this junction would of cost in the of £150k and the council are only being charged £5k for the work.
No final details are available for the junction layout, so we need to keep an eye on this junction
Created by velocipedus@gmail.com // 2 threads
Partnerships and Alliances holds threads related to specific groups and constituencies
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by David Wilcox // 1 thread
Bristol City Council are changing the waiting restrictions across the whole of Clifton in Bristol. The number of places that you can legally park in are being decreased.
Cycle Parking is being removed on Victoria Street.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
The busway cycleway is sometimes flooded in this section.
The County Council need to address this.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.