LCDS draft
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by charlie_lcc // 10 threads
A section by section discussion list for recording comments on the current 2014 consultation draft of the London Cycle Design Standards - LCDS
Created by charlie_lcc // 5 threads
The London Cycle Safety Action Plan 2 (CSAP2) draft is out for consultation. Deadline 25th July 2014
https://consultations.tfl.gov.uk/cycling/draft-safety-action-plan
Since the changes to Mare St at Westgate St some vehicles travel past the children's centre in Triangle Road, at excessive speeds, to avoid the traffic light at Mare St . Can Hackney Council add a restriction in Triangle Road.
Created by Richard Moss // 1 thread
The Over to Longstanton road is to be closed from 30 June 2014 for 9 weeks for reconstruction of Gravel Bridge.
Created by Paul L // 3 threads
Richmond Council say
"a signalised PUFFIN crossing with pedestrian countdown outside number 182 Kew Road (previously outside 180) Footway widening both sides of Kew Road. We have attempted to minimise the impact on the cycle lanes by introducing long tapers and following existing extended footways where possible. The kerb widening is essential to ensure sightlines to the signal heads past the many street trees."
We suggested cranked supports for the signals to avoid the loss of cycle lanes but they claim TFL disapproval.
Created by timlennon // 1 thread
Text of message from TfL:
All,
We are proposing to convert the current dual PUFFIN crossing at the above location to a dual TOUCAN crossing, formalising the facility for cyclists.
The initial design is attached, which includes localised resurfacing of footways and some carriageway works. A lighting assessment has also been undertaken which recommends a full lantern replacement of the columns retaining all lighting columns once structural testing has been completed and passed.
We also propose to extend the shared use footway further north on Marksbury Avenue and further south on Manor Grove to enable safer entry/exits for cyclists to the TOUCAN crossing.
The impact (if any) is currently being determined by Traffic Signals.
If you have any comments or suggestions, please let me have these by cop Friday 27th June.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by David Earl // 1 thread
The DfT have written to us with a proposed TRO to replace the sliproad from westbound A14 at Girton to southbound M11. This is also part of the widening scheme between Histon and Girton, but this aspect requires an order to give the lane motorway status. The main effect seems to be to lengthen the A14 part of the slip road to reduce queues on the main A14.
I don't think anything particular needs doing with this, so I don't plan to scan the correspondence, but if anyone wants if, please ask.
Preferred route to be signed as an alternative to Chilwell High Road agreed between City, Broxtowe and County Councils.
Created by MJR // 2 threads
Some of (the last of?) the s106 money from two out-of-town big box supermarkets is being used to remodel the connections between the bus and rail stations. National Route 1 runs through this area and the bus station may also be Lynn's biggest cycle park, so there's quite a lot of potential for this to do good - or to do harm.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Area Committees are a joint meeting attended by both city and county councillors. They decide on planning issues in the area, but also have a role in the allocation of community development money from S106 contributions. They offer an opportunity to engage with multiple councillors at once, through the Open Forum section and speaking on specific Agenda items. The East Area's website is here: https://www.cambridge.gov.uk/west-central-area-committee
Speaking at these meetings is a good way of making your feelings on matters the councils control public
As discussed between local cycling organisations there is a desperate need for a signed route which avoids Chilwell High Road where there have been a number of accidents now tram tracks are laid in places. This route also avoids Beeston High St which is a lengthy dismount section from 9-5. This route supersedes the previous northerly route. A southern avoiding route has also been plotted on cyclescape
Created by Jean Dollimore // 1 thread
The proposals seek to improve road safety on the streets surrounding Regents High school in Somers Town which is being rebuilt. This school is labelled "South Camden Community School" on the map.
The consultation is on Camden's website at:
Currently the school is accessed from Charrington Street but the new building is going to face the other way and will be accessed via Chalton Street. Therefore most of the proposal are related to making a new school entrance and building out the footways in Chalton Street while taking them away in Charrington Street. All of this is clearly necessary, but doesn't appear to add to road safety.
The council also proposes a new speed table at the junction of Chalton Street and Aldenham Street. This would help with road safety.
Cyclists are already concerned with the rat-running on Ossulston Street; this quite likely accesses Eversholt Street via Chalton Street. Surely we should ask for this rat running to be prevented both for the safety of the cycle route and for children going to Regents High School?
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Anon // 0 threads
There is currently no secure locks provided at Port Rodie bus stop, the main departure stop for buses eastwards towards Dumfries and Carlisle.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Peter Loader // 0 threads
Transport Initiatives LLP is an independent transport planning consultancy. They have carried out an audit for Three Rivers District Council classifying roads, paths and crossings in terms of the UK National Cycle Training Standard (Bikeability) Level needed to be able to ride in comparative safety. The results can be seen on Three Rivers District Council's web site.
Transport Initiatives have classified the roundabout at M25 Junction 17, the adjacent Maple Cross Roundabout, and the dual carriageway between them as Level 3.5, i.e. "Roads & crossings with a very high level of risk, unsuitable for even highly experienced cyclists".
For detailed documentation, please see
http://www.threerivers.gov.uk/Default.aspx/Web/CyclingInformation
and download
Maps by area|Maple Cross
plus
Cycling safety audit|CSNA Leaflet
Following closely the route of an old railway line between Colchester and Brightlingsea this proposed route would link Colchester to Walton-on-the-Naze. It provides a much needed commuter route out of Brightlingsea linking it safely to Wivenhoe, the University of Essex and Colchester and creates a new leisure route in a holiday district. It builds on the existing four mile NCN51 route from Colchester to Wivenhoe by adding 5 miles off-road to Brightlingsea via a new river crossing at Alresford Creek. From there it utilises an existing pleasant frequent summer ferry crossing to Point Clear and creates a 25 mile coastal route much of it off-road.
Created by Gary // 0 threads
To improve safety after numerous fatal car accidents the Highways Agency are currently implementing speed restrictions but are also designing a new roundabout for the A120 near Pellens Corner/Horsley Cross. NCN51 passes nearby. Cyclists don't generally want to cycle the A120 but we do have to cross it to get across Tendring District. Roundabouts are particular hard for cyclists to use on A roads. So will the Highways Agency proposal include the needs of cyclists? http://www.highways.gov.uk/roads/road-projects/A120-Pellens-Corner-Average-Speed-CamerasSafety-Improvements
Created by Gary // 0 threads
Why would you put a gate across an official cycle route through the "Hangings" in Harwich, on the North Sea Cycle Route from Harwich International to Harwich Town? I've seen visitors from Europe try and cycle through this obstruction with trailers.
Created by Anna Langley // 0 threads
In advance of whatever fair it is appearing on Midsummer common, the "cyclists dismount" signs have appeared on the entrances to the common.
Created by David Earl // 1 thread
Leaflet through my door today about "new homes on land off Teversham Road, Fulbourn". Unspecific at this stage, will be revealed, no doubt, at consultation event on 28 June. But it must be big for the scale of the consultation. It also has a website: http://www.castlefieldconsultation.co.uk but that also says nothing very specific as yet.
Created by Jean Dollimore // 6 threads
This scheme proposes to restore two way working in Tottenham Court Road (TCR) and in the Gower Street alignment which includes Bloomsbury Street and Shaftesbury Avenue. All the bus routes will be on TCR.
The consultation is on Camden's website at:
http://www.wearecamden.org/westendproject/
In TCR, Camden proposes a "bus and cycle street" from 8 am to 7pm (Monday to Saturday) with local access for cars, taxis and loading on short sections of Tottenham Court Road via side roads.
TCR will have a pair of 4.5m wide carriageways to be shared by cycles and buses (90 buses per hour in each direction) and by the additional local traffic.
In the Gower Street alignment, Camden proposes two-way access for private motor vehicles (no buses) and that these roads will have a pair of 4.5m wide carriageways, each including a lightly segregated 1.5m wide cycle track.
Other measures proposed:
- in both TCR and the Gower Street alignment Camden proposes raised sections of road to reduce motor speeds
- two-way cycling in all the side streets (except for Maple Street, University Street and Howland Street)
- new public spaces including a new park on Alfred Place and a ladder of calm side streets.
These changes to roads and to cycle permeability are shown in the diagram at:
http://www.wearecamden.org/westendproject/assets/images/cycling-plan-resized
Details of the road layout for TCR are at:
http://www.wearecamden.org/westendproject/assets/images/tcr-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/tcr-south-resized
Details of the road layout for the Gower Street alignment are at:
http://www.wearecamden.org/westendproject/assets/images/gower-street-north-resized
and
http://www.wearecamden.org/westendproject/assets/images/gower-street-south-resized
Exhibitions are to be held at the Building Centre, Store Street on 19th June (10 am to 5pm) and 7th July (5pm to 8pm),
Camden Cyclists are holding a public meeting for cyclists to discuss this project.
On 30th June 7pm - 9pm
at the YMCA Indian Student Hostel, 41 Fitzroy Square, London, W1T 6AQ.
We will finalise our response to the consultation early in July.
The public consultation will run until Friday 18 July 2014.
Created by Charlie Halliday // 1 thread
Proposal by HCC to add advisory cycle lanes on both sides of Kingsmead between the SUP near the junction with Victoria Road to the entrance of Pinehurst car park.
The cycle lanes would have a contrasting red surface at the entrances to Sainsburys and the Kingsmead and Sainsburys car parks.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Always been a bit of a problem - worse for pedestrians than cyclists.
Detailed (re-)design is apparently underway.
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Created by Heather Coleman // 1 thread
I've just sent a sharp email to the Council. It reads as below. If the council can't do joined up information on their own websites, how do they expect people to make these modal shifts in transport that they are so keen on?
"Dear Parking services,
I've just done a google search on this.
http://www.google.co.uk/search?client=safari&rls=en&q=park+st+car+park+ca
mbridge&ie=UTF-8&oe=UTF-8&redir_esc=&ei=eZdMT-vbLsnu8QPw7pHXAg
first item says "multi-story car park with cycle parking and pushchairs
for loan".
However, when you then go to the Park St car park page, it says nothing
about either cycle parking being available, nor about the pushchair loan
scheme. How about a link to
http://www.cambridge.gov.uk/ccm/content/transport-and-streets/cycling-and
-walking/cycle-parks.en
on the website, so we don't have to do a separate search, so that when
people go to the Park St website, they can get all of its features? They
may even then decide to cycle into town rather than drive.
I was looking for this information as I was just emailing a friend who
lives in Chesterton and has a nine month old child, who I wasn't sure
would be aware of this scheme, which she may find useful. However, if we
have to spend five minutes doing exactly the correct google searches, it
counts as a "secret facility" apart from those in the know.
I wasn't aware, for example, that you could also get pushchairs at the
Grand Arcade one. This information needs better dissemination, and
linking from within the car park and other public transport pages, so
that people can make a properly informed decision about their transport
choices when visiting the city. This, surely, is the way to get modal
shifts in people's transport choices?"
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 1 thread
This short section of The Vineyard is one way street. Opening this up to 2 way for cyclists - through signage and a 20mph limit - would improve permeability for cyclists in Richmond centre.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by Andrew Woodward // 0 threads
This stretch of Grove Road is pedestrianised. Formally opening this up to cyclists - and marking it so - would help establish a quiet cycle route all the way up/down Richmond Hill as an alternative to the busy Queens Road
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Sam Saunders // 0 threads
The south-west bound advisory cycle lane, marked with dotted lines and with a small traffic island to funnel cycles into it (creating a pinch-point) seems to be regularly used a car park. If the parking is being encouraged or allowed, the island and the markings should be removed to allow the hazard to be more clearly seen. Preferably, the parking should be disallowed and a mandatory cycle lane should be installed.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by velocipedus@gmail.com // 9 threads
Outline of issues affecting Histon Rd between Gilbert Rd and Victoria Rd. This stretch is without bike lane. Car parking on one side only, from Victoria Rd to pedestrian access to Recreation Ground.
The fuller length to the north is also part of a City Deal scheme.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
Gallagher Estate, master planners of Orchard Park will soon hand over the highways for adoption by the County Council.
We won't be able to fix this car centric development, but within it there are many pavement cycleways, "cyclists dismount" signs, cul-de-sac signs and others which are wrong or don't apply. There are also issues with dropped kerbs etc.
I am looking for volunteers to audit Orchard Park, making a list of corrections we require before Gallaghers hands this project over.
Created by christhebull // 2 threads
A short section of Lower Redland Road adjoining Whiteladies Road is eastbound only, hindering cycling in this area. A simple remedial measure would be to allow legal contraflow cycling in the westbound direction on this road. Although no longer required for contraflows, a small traffic island exists at the exit of this one way street which could either removed, or utilised as the entrance to the contraflow. This would be relatively simple to implement as there are no intermediate junctions or traffic lights, only signs to be altered at either end and various formalities to go through.
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by velocipedus@gmail.com // 6 threads
How can we support the growth of local initiatives ?
How can we overcome the division urban and rural cycling?
Would it be useful to establish a network of regional groups?
Could such a network become an interesting partner for the county planners?
Would politicians be able to hear us better if we speak from a position of regional awareness, a a group of groups?
Would it help the elected to understand that things are changing on our roads?
Could such a network support constituent groups, facilitate exchange between these groups, become a more important player in the national context?
Could such a network attract its own funding?
What would be a good name for such a grouping (NAMES ARE IMPORTANT)
We have CTC, Ely, A10 Corridor, Martin T thinking about something in Bury St Edmunds, "Routes around Chatteris", Wisbech forum (set up by the County), - anything else ?
Created by Paul L // 1 thread
Despite having put in a cycle track from Richmond along the S side of Lower Richmond Road TFL claim that that it is impossible to link to the shared foot-way on Clifford avenue.