Trumpington CGB Shared Use Conflict
Conflict between pedestrians and cyclists on stretch of CGB shared-use path alongside allotments and CGB in Trumpington
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Cyclenation:
Created by Chris Brown // 1 thread
Conflict between pedestrians and cyclists on stretch of CGB shared-use path alongside allotments and CGB in Trumpington
Created by Kate // 1 thread
I would like to propose the parade of shops in Ashburnham Road, opposite Ham Library as a spot that would greatly benefit from cycle parking. This spot was turned down for cycle parking in 2012 on the grounds that there is already cycle parking in Ham Street outside Hansel & Pretzel (opposite Grey Court School).
The Ham Street cycle parking is not convenient for people who want to park their bikes in order to pop into the shops in Ashburnham Road. The cycle parking in the library is reserved for library users only. As you can see from the attached photos people end up laying their bikes down on the pavement, thereby causing an obstruction for pedestrians.
2 or 3 Sheffield stands would be sufficient to solve this problem.
I have obtained signatures from all but one of the shops in Ashburnham Road in support of this idea. The remaining one also supports the idea but they want to be sure that the parking would not be directly outside their shop, thereby possibly obstructing deliveries.
My suggestion would be to put stands either as a group on the corner next to the mosaic and the Indian takeaway restaurant, or to locate them on the opposite side of the road to the shops, in a similar way to the ones in Back Lane, Ham (see attached photo).
As I am sure you are aware, convenient cycle parking not only encourages people to use their bikes but has also been proven to help the local economy as people are more likely to stop and use the local shops if they can easily park their bikes nearby.
Created by Robin Heydon // 1 thread
Looks like they've just improved the cycle parking at Waterbeach railway station, doubling it to 24 bicycles.
Created by George Coulouris // 2 threads
Camden officers have indicated that they would like to receive prioritised list of suggestions for (very) minor improvements throughout the borough that will make cyclists feel better catered for. Examples of changes that will be considered:
- dropped kerbs
- obstructive barriers (i.e. anti-motor cycle barriers)
- stretches of poor road surface (such that you have slow down on a Brompton or weave around holes)
- Feeders into ASLs that are too short or non-mandatory
Changes that shouldn't be suggested for this initiative include:
- anything that would require a local consultation
- anything that involves changes to parking provision
- individual pot-holes
To compile a list, we want suggestions from members. The Council's deadline is Monday November 25th. So can we have members' suggestions by Wednesday November 20th please. That will allow time for us to compile a list and circulate it here for comment.
Martin Lucas-Smith // 1 thread
This area has long had dangerous cycle lanes that encourage people to cycle in the dooring zone.
The County have funds to upgrade this section. The question now is what should be present instead.
Created by Richard Jennings // 2 threads
Because of queuing for the Grand Arcade car park, amongst other things, the mandatory cycle lane on Pembroke Street and Downing Street is routinely abused by motor vehicles – one every 66 seconds on a Saturday afternoon http://www.cyclestreets.net/galleries/221/.
The corner at Free School Lane is a particular concern because vehicles traveling east can't see oncoming cycles.
Created by Heather Coleman // 1 thread
Since they appear to have changed the phasing at the lights at Cherry Hinton Road the other side of the railway bridge this morning, it becomes ever more apparent that if you have queueing traffic all the way southbound from Station Road to Cherry Hinton Road, the lack of even a narrow "queue-busting" cycle lane here, combined with the shocking state of the kerbside approx 9 inches of road surface (uneven cobbles and slabs, very slippery, very difficult even to use while scooting your bike along by a foot on the pavement), that cyclists are being seriously held up. Once the advisory lane outside the Centennial Hotel (well obeyed by drivers this morning in general apart from when the right hand turn queue for Brooklands Ave starts) ends, you just get stuck in a queue of kerb-car-car traffic and cannot access the ASL at the junction with Brookgate, in order to take advantage of the cycle lanes which queue-bust you across the railway bridge.
This leads to a) pavement cycling, b) people nipping in and out of a queue of vaguely stationary/starting to move traffic c) nipping back infront of traffic which is starting to move at the lights after white lining to get past the queue. All of the cars stuck in that queue will have to wait at least two cycles of the lights at Cherry Hinton Road before proceeding and thus are just an obstruction.
Given that this is a relatively recently refurbished/altered road, I suppose this should have been spotted at the time.
What can be done about it retrospectively? If the traffic light phasing at Cherry Hinton Road stays as it is, there will be an accident before too long.
Created by David Earl // 1 thread
What on earth do they think they are doing here? The cycle lane alongside the new development on Cherry Hinton Road (former Tim Brinton motors) has been removed (after being closed for months) and now splits into two, one part directing cycles onto what looks like it will become an exceptionally narrow cycleway on the pavement (which ends up rejoining the road just at the lights on the far left); or diverting cycles in a weird swerve out into the road to meet the sides of the constant queue of vehicles.
Created by mike1727 // 1 thread
"The St. Albans Green Ring route will run approximately parallel to Everlasting Lane in Batchwood Everlasting Lane is an un-surfaced green lane that can be used as an alternative route to avoid traffic. "
It is proposed to construct a new tarmac path across the recreation ground in Temple View from access on Temple View going North West to an entrance onto Everlasting Lane"
Feasibility study pages 15-17
Googlemap ref http://goo.gl/maps/MjClP
2.5m wide tarmac cyclepath sloping down from playing fields to Everlasting Lane max gradient 1:12 sides 1:2.5
this appears to be option 3 from the feasibility study
Questions:
Why was Sutrans' reccomended route not taken up?
Will there be a cycling right of way accross the Recreation ground to provide a legal link to City Hospital?
Will cycle parking be installed in the Recreation Ground?
What work is being planned on the Everlasting lane section of this route? (In particular surfacing and width)
Will lighting be installed?
Created by mike1727 // 0 threads
2.5m bound gravel cycle path following existing informal route "proposed to widen and reconstruct the existing path through the Recreational Ground to Sandridge Road. "
Feasibilty study page 24
Googlemaps ref http://goo.gl/maps/97an1
Questions:
What is being planned for the crossing of Sandridge road and when will it be delivered?
Sustrans reccomendation:
Cross Sandridge Road via a central refuge – consider creating another central refuge
on Sandridge Road to the north east of Boundary Lane for cyclists wishing to travel in
that direction. An alternative would be to create a Zebra crossing at this location
without a central refuge. This would avoid the pinch point created by a refuge for
those cycling along Sandridge Road.
Created by mike1727 // 1 thread
Link between NCN 6 near Townsend Drive to Edward Beaufort Drive
"It is proposed to cross Bernard’s Heath on a 2.5 metre width hard-surfaced gravel pathway running approximately parallel to Heath Farm Lane. It will follow the existing informal route through the Heath. "
Feasibilty study page 23
google map reference
Questions:
Please ensure any bollards/posts at each end of the section allow sufficent width for tandems and bike trailers.
When is additional work on this link due?
Feasibility study reccomended :
•Widen roadside footway to maximum available using Highways land to rear of footway between Edmund Beaufort Drive and new crossing of Harpenden Road
• Cross Harpenden Road using Toucan on crest of hill
We could do with some photos of this please.
Created by Al Storer // 1 thread
The new road between Addenbrooke's Road and Robinson Way has some poor design features.
Created by Richard Moss // 1 thread
Network Rail planning application for replacement of level crossing with footbridge
Created by Paul L // 1 thread
Between the practically traffic free road through Bushy Park and the quiet roads of Hampton is the busy High Street. This could be a route for all cyclists by segregation as a two-way widened shared footway and conversion of an existing pelican to a toucan crossing.
Created by Paul L // 0 threads
Burtons road has been part of the borough cycle network usually acting as a quiet parallel to Queens Rd. Unfortunately growth of traffic has led to it being a rat-run at peak times despite numerous road humps. As parking leaves space for only one vehicle this makes it unpleasant to cycle.
Created by Gareth Evans // 0 threads
This roadworks is very extensive. There are many cones. However this lorry just blocks not only the lane but the sight lines just next to St Kilda avenue
Created by David Earl // 2 threads
The new flats at the fire station seem to be attracting delivery vehicles to unload in the cycle lane at the west end of East Road. The wide lane here is separated from the road by cross hatching. Should we ask for physical segregation on this short length, e.g armadillos. Would delivery vehicles still bump over them to park are make matters worse to get round them? Would a barrier be effective?
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by Jenine // 1 thread
We need some cycle racks outside the Asda store here. I've asked Asda but they say it's up to the Council.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
The road between Hogg End Lane and Three Cherry Trees Lane is closed to all traffic. It should be opened to cyclists to provide a convenient route to the Maylands industrial estate and NE Hemel from the Redbourn Road.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by BrianInBeeston // 1 thread
There have been tacks thrown on the path in this area which cause punctures. Residents have put up signs saying 'no cycling'. This is a defacto bridleway & has been used as such as long as anyone can remember. A local resident has made a witness statement to this effect which is being dealt with by Nottinghamshire County Council rights of way officers.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Southern stretch of Kew road is a busy road, wide enough for cycling provision, but none is provided - southbound has protection of a bus lane for a stretch but north bound has no protection for cyclists at all. This frequently leads to pavement cycling as per the photo.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.
Created by Sarah Wood // 0 threads
This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Hester Wells // 1 thread
There is a campaign for a cycle route between Bar Hill and Cambridge, also connecting Dry Drayton, Madingley and Coton to North-West Cambridge.
Currently cycle provision for these villages is poor. Bar Hill has lower rates of cycling than other villages that are closer to Cambridge.
The campaign site is: http://www.bhddmadcycle.com/
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Sarah Wood // 0 threads
There are several pedestrian refuges along the road particularly at the western end of the road. The refuges cause a pinch point for cyclists. The road marking confuse priorities between those using the on road cycle path and other traffic.
Created by Shaun McDonald // 1 thread
Is this really the best that Edinburgh can do for the flagship national cycle network route 1 to get it to cross Clerk Street? You have to go through a pile of bins, on to the pavement to get round a barrier and then try and judge it right to cross the road, or use the nearby pedestrian crossing.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by Sam Saunders // 1 thread
A northern stretch of Bristol's waymarked "Concorde Way" runs along a quiet residential street, Wordsworth Road. On the newest housing development as Bristol gives way to South Gloucestershire there is a barrier between the end of Wordsworth Road and the start of Eighth Avenue to prevent motor vehicles passing through. There is a raised curb, offset railings and large grey concrete bollards and only a narrow passage either side of one bollard for cyclists to ride through. Tricycles, cargo bikes, or trailers might be to be lifted over the raised curb. In dusk or darkness neither the bollards nor the curb are easy to see. There is a light on the traffic sign offering some help, but a less intimidating arrangements or reflective/high-visibility surfaces could be considered.
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 4 threads
The Shotley Peninsula Cycle Campaign have plans for a dedicated cycle path from the edge of Ipswich to Shotley. http://www.spcc.info/News%20and%20Projects.html
Upgrades are needed from Ipswich town centre to the new cycle track.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Sam Saunders // 1 thread
Heading south west on Upper Maudlin Street, cyclists approaching lights have a narrow cycle lane cum ASL lead-in immediately adjacent to parked vehicles. The risk of dooring is clear. The lane or the parking should be removed.
Created by Andrew Woodward // 1 thread
Footbridges at Mortlake railway station should be fitted with troughs to enable cyclists to easily wheel bicycles to the other platform. Cyclists frequently carry bicycles over the footbridge, as per the photo - one going in each direction!
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Created by Dylan // 1 thread
There is a fairly good cycle lanes from Kingston towards Richmond up until you reach the Richmond Council border where Richmond Road (A307) turns into the Upper Ham Road (A307) and eventually Petersham Road (A307). At traffic lights along this route there are reserved areas for cyclists but along the roads there is nothing to remind drivers that cyclists share the road especially when the road narrows after Sandy Lane through Petersham. The road surface here is terrible and the speed bumps are pointless because some driver sprint between the bumps.
The best solution would be to remove the cyclists from this route altogether by upgrading the Thames Path to create a proper cycle path along the River Thames towards Richmond that currently stops at Teddington Lock. If a cycle/foot bridge linking Ham with Twickenham was built over Eel Pie along this route it would create an obvious link for those want to reach Twickenham.