Created by M Stanley // 1 thread
West Yorkshire combined authority are consulting on improvements to cycling and walking links in Pudsey with the aim of improving access to New Pudsey station
Anon // 1 thread
Borough Road - Healthy Streets
Closes 4 Nov 2019
Opened 8 Oct 2019
Contact
Joanna Lesak
(Project Manager)
Overview
We would like to know your views on proposals for Borough Road. We are proposing improvements to the environment to encourage cycling and walking in line with the Healthy Streets approach. Borough Road is part of London's wider strategic cycle network as well as the council's Southwark Spine route, and together with Harper Road links Cycleway 6 at St George's Circus to Cycleway 17 at Falmouth Road creating a strategic east-west route.
The key measures proposed are
Please respond to the online questionnaire below by 4 November 2019.
Background
In 2014 over 1400 people in Southwark were consulted by the council on cycling, and the proposed Southwark Spine cycle route was a key feature of the proposals, linking the north and south of the borough. The 2015 cycle strategy subsequently identified the Southwark Spine as a key deliverable to offer a direct, safe, attractive, comfortable and easy cycle route, for all ages and abilities.
Borough Road and Harper Road comprise the northern section of the Southwark Spine. Street improvements in Harper Road between the junction with Borough Road and Falmouth Road have been consulted on separately to link in with the proposed refurbishment of Dickens Square Park; a link to the informal consultation and updates on timescales of projects in the area are provided in www.southwark.gov.uk/harperroad.
Why We Are Consulting
We have identified a number of issues with the current road layouts that make Borough Road and Harper Road feel unsafe and intimidating for vulnerable road users, particularly cyclists, and that affect bus journey times.
Our proposals
We would like your views on the following proposals which aim to reduce these issues.
The proposals improve Healthy Street indicators including making it easier to cross the road, improving the environment for pedestrians from all walks of life, helping people feel relaxed and safe, and encouraging people to walk, cycle and use public transport. The results of the draft Healthy Streets check (subject to change) are shown in the spider graph below
Well used, but narrow, path.
Downhill section owned by FC, rest Forth Ports.
Before the railway came the Lammerlaws (Lamberlaws on some maps) stretched inland almost as far as the Parish Church.
Now it’s mostly thought of as the name for the ‘wild’ bit of the peninsula at the of Lammerlaws Road.
The Community Council produced an improvement plan for the area in 2018.
http://www.burntislandcc.org.uk/Index.asp?MainID=25915
The ambition has since been scaled back.
https://burgh.buzz/2019/09/17/burntisland-small-improvements-planned-for-the-lammerlaws/
The area is part of an SSSI so any work requires permission from SNH. It is expected to be given.
Created by chdot // 1 thread
WW2 pillbox
Has survived for 80 years and has recently attracted a small amount of vandalism
http://burgh.buzz/2019/09/04/vandalism-on-the-lammerlaws/
Needs a plan for conservation/interpretation
Presumed to be owned by FC
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Anon // 1 thread
Overview
Give us your views on proposals to introduce a new section of bus lane on Croxted Road.
We want to improve bus journey times along Croxted Road, as it has been identified that buses experience delays along this section, in particular just south of the junction with the A205 South Circular Road - northbound buses are sometimes unable to access the bus stop due to a combination of queuing traffic and parked vehicles upstream of the bus.
In order to support this, we are proposing to introduce a short length of northbound peak only bus lane installed between the junction of Ling’s Coppice and the bus stop south of the A205 South Circular Road (Stop WS). The bus lane will operate from 7am-7pm Monday to Saturday and would require introduction of new kerbside restrictions of no waiting and no loading to match the operational hours of the bus lane i.e 7am to 7pm Monday to Saturday. To support these changes on the western kerbline, it is also proposed to introduce no waiting/no loading restrictions on the eastern kerbline during bus lane hours.
These proposals should improve journey times for passengers using the route 3, which is a high frequency service between Crystal Palace and Trafalgar Square. By making bus travel more reliable, this supports Transport for London's Healthy Streets indicator: 'People choose to walk, cycle and use public transport'.
We would appreciate your views on these plans, and whether there are any issues that we should take note of.
Why We Are Consulting
We would be grateful if you could take the time to review the proposal attached below and let us know what you think using the online questionnaire.
Your views are really important to help us make sure the final design meets the needs of the local community.
Concern at September Community Council about need for barrier to discourage young people from running into the road on way to Music Hall.
19/1212/FUL | Demolition of the existing octagonal building and erection of two new student accommodation buildings comprising 23 rooms. Replacement of existing gardeners accommodation with free-standing gardeners' building, replacement of cycle storage, new boundary and entrance treatment. | St Chads 48 Grange Road Cambridge Cambridgeshire CB3 9DH
Created by Anna Williams – Head of Campaigns & Engagement // 1 thread
As part of the City Council's plan to build 500 new homes in Cambridge by 2022, Cambridge Investment Partnership (CIP) is proposing to build around 78 new council-rented homes and a new community facility on Campkin Road.
Tom McKeown // 1 thread
Planning for a direct action to close Station Road.
Created by JonC // 1 thread
The Countryside Management Service is currently developing a Greenspace Action Plan for the Ayot Greenway. Attached (see thread) is the briefing document which explains more about the community engagement and plan production process. This briefing document is being sent to relevant local stakeholders. There will be further engagement on a draft plan during January and February 2020.
We would welcome any comments you may have on the objectives proposed, or your thoughts on the future management of the Ayot Greenway. Should you have any questions, or if you would like to meet to discuss the plan, please get in touch with me using the contact details below.
Rhiannon Barton, Trainee Land Management Projects Officer
Countryside and Rights of Way, Environment and Infrastructure Department
Hertfordshire County Council I County Hall I Pegs Lane, Hertford I SG13 8DN I Postal Point: CHN101
( 01992 555173 (Comnet 25173) Email: Rhiannon.Barton@hertfordshire.gov.uk
Created by Paula Downes // 4 threads
The road is unloved, has very few trees, has a lot of traffic, moving fast or jammed. Air quality is poor. Cyclists cycle along the pavement very fast which is dangerous for pedestrians. The cycle lanes on the road are not safe. It is difficult for cyclists to cross the road since there are not enough crossings. A lot of people park near Coldhams Common on Saturdays. Many people have created driveways to avoid people parking in front of their houses in the parking bays. Crossing the little roads (Brampton, Vinery Road, Vinery Way) is difficult because the cars block the path as they wait to get onto Coldhams Lane and greenery prevents pedestrians from going behind those cars.
Outline application (all matters reserved except for means of access in respect of junction arrangements onto Worts' Causeway and Babraham Road) for erection of up to 230 residential dwellings (including affordable housing), community facilities within Use Classes A1/A2/A3/A4/B1/D1/D2, new landscaping and public realm, car and cycle parking, infrastructure, other associated works following the demolition of all existing buildings on the site.
Created by Sylvia Gauthereau // 1 thread
Brent Council:
Overview
We are proposing to pedestrianise part of Oaklands Road (between Oaklands Passage and Cricklewood Broadway) and create a Liveable Street by removing general traffic and improving the urban realm.
Why We Are Consulting
The proposed scheme aims to create a new, high quality, calm and interactive community space in the heart of Cricklewood. This supports the Council’s commitment to improving our town centre environments, encouraging walking and cycling and improving air quality. It will also establish a less congested environment for the long-standing fruit and vegetable stall and an accessible and safe route for pedestrians, cyclists and people with mobility difficulties.
Created by Hounslow Cycling Campaign // 1 thread
The Liveable Neighbourhoods project in south Chiswick combines a range of schemes across the Grove Park and Dukes Meadows area that focus on increasing the number of trips made by foot, bike and public transport while improving local public space.
Hounslow Council has secured funding through Transport for London’s Liveable Neighbourhood programme to progress this project. Certain elements of the project are well defined, such as the proposed pedestrian bridge under Barnes Bridge and a new public square in Grove Park near to Chiswick Station. Alongside this there are also broader aims to provide improved walking and cycling links across the area while also looking to address well known issues of excessive traffic volumes and speeds in residential areas, which are often used as cut-through to access major roads.
Richard G // 1 thread
Default traffic light phase is for red on the vastly more used busway/cyclepath, rather than for the infrequent crossings of Hobson Avenue.
How to go about changing it
Created by Roxanne (CEO) // 1 thread
GCP project:
Junction 11 of the M11 is a key entry point into Cambridge. With significant growth in housing and employment in the area, upgrading the existing transport infrastructure in this area is vital to reduce congestion and improve access into the city.
Congestion impacts on current bus journey times making journeys unreliable, unattractive and longer than necessary, as well as affecting the convenience and comfort of cycling trips on the corridor.
By expanding the existing Travel Hub in Trumpington and creating more Travel Hub provision (either by creating multi-storey parking at the Trumpington site or a new Travel Hub to the west of Junction 11), car drivers can be encouraged to complete their journeys by bus. More Travel Hub use would help the flow of traffic and make employment sites such as the Cambridge Biomedical Campus, West and North Cambridge easier to reach.
A consultation on increasing Travel Hub spaces to the south west of Cambridge ran until 21 December 2018. Thank you to those who attended our events and responded to the consultation. We will now collate the responses and publish a report in the Spring of 2019.
The Cambridge South West Travel Hub Project is a component of the West of Cambridge package, which includes review and development options for Travel Hub facilities, creation of new Travel Hub locations, and enhancement or upgrade of existing facilities.
Created by Jean Dollimore // 1 thread
Camden is consulting on a proposed Healthy School Street zone around the following schools:
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Simon Munk // 1 thread
From Hackney council:
Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road
We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.
Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:
Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.
Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.
The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.
What are the proposals?
The following measures are proposed:
Queensbridge Road raised cycle tracks
Dunloe Street shared zebra crossing
Hackney Road junction improvements
Kent Street raised entry table and zebra crossing
Refurbishment of pavements and carriageways
Whiston Road junction
Please download the plans below for more details
Layout plans from Hackney Road to Whiston Road
Layout plans from Hackney Road to Whiston Road
Detail 1: Dunloe Street junction
Detail 2: Hackney Road junction
What are the potential impacts of the proposals?
Parking
Future schemes
The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:
What happens next?
Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk
To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations
Permanent works
If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.
Frequently Asked Questions
Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?
A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.
Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?
A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.
Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?
A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings
Created by Edward Leigh // 1 thread
We know we need thousands more cycle parking spaces in future to meet ambitions to reduce car trips into the city and cope with the huge population and employment growth that the region is already committed to in its Local Plans. There is very little highway space available in the city centre, so we need to re-purpose other spaces, such as multi-storey car parks. I want to see if we can develop a policy to put to the City Council that they could act on. We've been discussing locations for new cycle parks for years (see linked Camcycle article), so what's the hold-up?
Created by Jean Dollimore // 1 thread
Camley Street Neighbourhood Forum proposes a neighbourhood plan for the area shown in the image with this issue
Demolition of existing building and construction of 3no two storey dwellings, with additional living accommodation in the roof of each, and 1no 2 storey detached dwelling, with private access drives to the front and rear, amenity space and landscaping.
https://idox.cambridge.gov.uk/online-applications/simpleSearchResults.do?action=firstPage
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Andrew France // 1 thread
It has an uneven degraded surface in the cycle lanes from the Elizabeth Way roundabout until the bridge.
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
Created by Shaun McDonald // 0 threads
The cycle track on the pavement just suddenly stops with no where to go other than to cycle on the pavement. Surely it would be better to nicely guide cyclists back onto the road into a cycle lane?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Katja Leyendecker // 0 threads
Superfluous to entry by motor traffic. East Pilgrim Street re-development takes note of that, and arranges Swan House roundabout accordingly
Created by George Britton // 1 thread
The developer, Inland Homes, is preparing an application to build new homes on the roundabout site of the Ham & Blackbird pub.
Plans reported in the local newspaper talk of 62 units (1-bed apartments), with a cafe/bar commercial area.
This is an extremely busy junction, providing access between the centre of Farnborough and the station. The current cycling provision is poor/non-existent cycling in multiple sections.
Another significant factor is the big parking expansion underway at Farnborough Main station, which will release approx. twice as many cars onto the roundabout every weekday evening…
There is a public exhibition of the proposals.
Details:
Venue - St Peter's Church Parish Hall, 60 Church Avenue, Farnborough, GU14 7AP.
Saturday 22nd February 2014, 1130 am to 4pm.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Andrew Woodward // 0 threads
Despite the cycle lanes being mandatory along this stretch the road layout is such that vehicles frequently intrude into the cyclelane - as this bus did.
White paint does not work on this stretch and some other segregation method is needed -eg a kerb; vertical posts or similar.